# PBO Tiltmeter Data, format version 1.1
# http://pboweb.unavco.org/strain_data
#
# B204 marble204bwa2007
# Latitude     : +46.1360 degrees (WGS-84)
# Longitude    : -122.1690 degrees (WGS-84)
# Elevation    : 784 meters (WGS-84)
# Sensor Depth : 3.05 meters
# SEED Codes   : PB B204 TT LKD
#
# Timestamp (UTC)   Temperature (C)
2025-04-09T11:00:00.76 8.23
2025-04-09T11:00:01.76 8.22
2025-04-09T11:00:02.76 8.24
2025-04-09T11:00:03.76 8.22
2025-04-09T11:00:04.76 8.22
2025-04-09T11:00:05.76 8.24
2025-04-09T11:00:06.76 8.23
2025-04-09T11:00:07.76 8.22
2025-04-09T11:00:08.76 8.23
2025-04-09T11:00:09.76 8.23
2025-04-09T11:00:10.76 8.24
2025-04-09T11:00:11.76 8.25
2025-04-09T11:00:12.76 8.23
2025-04-09T11:00:13.76 8.23
2025-04-09T11:00:14.76 8.25
2025-04-09T11:00:15.76 8.22
2025-04-09T11:00:16.76 8.22
2025-04-09T11:00:17.76 8.22
2025-04-09T11:00:18.76 8.22
2025-04-09T11:00:19.76 8.22
2025-04-09T11:00:20.76 8.24
2025-04-09T11:00:21.76 8.23
2025-04-09T11:00:22.76 8.23
2025-04-09T11:00:23.76 8.21
2025-04-09T11:00:24.76 8.25
2025-04-09T11:00:25.76 8.24
2025-04-09T11:00:26.76 8.24
2025-04-09T11:00:27.76 8.25
2025-04-09T11:00:28.76 8.21
2025-04-09T11:00:29.76 8.20
2025-04-09T11:00:30.76 8.21
2025-04-09T11:00:31.76 8.23
2025-04-09T11:00:32.76 8.24
2025-04-09T11:00:33.76 8.23
2025-04-09T11:00:34.76 8.24
2025-04-09T11:00:35.76 8.25
2025-04-09T11:00:36.76 8.22
2025-04-09T11:00:37.76 8.25
2025-04-09T11:00:38.76 8.24
2025-04-09T11:00:39.76 8.24
2025-04-09T11:00:40.76 8.25
2025-04-09T11:00:41.76 8.24
2025-04-09T11:00:42.76 8.24
2025-04-09T11:00:43.76 8.26
2025-04-09T11:00:44.76 8.24
2025-04-09T11:00:45.76 8.23
2025-04-09T11:00:46.76 8.25
2025-04-09T11:00:47.76 8.23
2025-04-09T11:00:48.76 8.23
2025-04-09T11:00:49.76 8.22
2025-04-09T11:00:50.76 8.21
2025-04-09T11:00:51.76 8.23
2025-04-09T11:00:52.76 8.23
2025-04-09T11:00:53.76 8.22
2025-04-09T11:00:54.76 8.24
2025-04-09T11:00:55.76 8.25
2025-04-09T11:00:56.76 8.23
2025-04-09T11:00:57.76 8.22
2025-04-09T11:00:58.76 8.23
2025-04-09T11:00:59.76 8.25
2025-04-09T11:01:00.76 8.27
2025-04-09T11:01:01.76 8.24
2025-04-09T11:01:02.76 8.23
2025-04-09T11:01:03.76 8.26
2025-04-09T11:01:04.76 8.23
2025-04-09T11:01:05.76 8.23
2025-04-09T11:01:06.76 8.25
2025-04-09T11:01:07.76 8.23
2025-04-09T11:01:08.76 8.26
2025-04-09T11:01:09.76 8.25
2025-04-09T11:01:10.76 8.23
2025-04-09T11:01:11.76 8.25
2025-04-09T11:01:12.76 8.22
2025-04-09T11:01:13.76 8.26
2025-04-09T11:01:14.76 8.23
2025-04-09T11:01:15.76 8.23
2025-04-09T11:01:16.76 8.24
2025-04-09T11:01:17.76 8.25
2025-04-09T11:01:18.76 8.23
2025-04-09T11:01:19.76 8.23
2025-04-09T11:01:20.76 8.22
2025-04-09T11:01:21.76 8.23
2025-04-09T11:01:22.76 8.22
2025-04-09T11:01:23.76 8.22
2025-04-09T11:01:24.76 8.22
2025-04-09T11:01:25.76 8.22
2025-04-09T11:01:26.76 8.23
2025-04-09T11:01:27.76 8.25
2025-04-09T11:01:28.76 8.23
2025-04-09T11:01:29.76 8.23
2025-04-09T11:01:30.76 8.25
2025-04-09T11:01:31.76 8.21
2025-04-09T11:01:32.76 8.22
2025-04-09T11:01:33.76 8.24
2025-04-09T11:01:34.76 8.25
2025-04-09T11:01:35.76 8.26
2025-04-09T11:01:36.76 8.23
2025-04-09T11:01:37.76 8.22
2025-04-09T11:01:38.76 8.25
2025-04-09T11:01:39.76 8.25
2025-04-09T11:01:40.76 8.24
2025-04-09T11:01:41.76 8.23
2025-04-09T11:01:42.76 8.23
2025-04-09T11:01:43.76 8.24
2025-04-09T11:01:44.76 8.23
2025-04-09T11:01:45.76 8.21
2025-04-09T11:01:46.76 8.23
2025-04-09T11:01:47.76 8.23
2025-04-09T11:01:48.76 8.24
2025-04-09T11:01:49.76 8.25
2025-04-09T11:01:50.76 8.23
2025-04-09T11:01:51.76 8.25
2025-04-09T11:01:52.76 8.23
2025-04-09T11:01:53.76 8.25
2025-04-09T11:01:54.76 8.23
2025-04-09T11:01:55.76 8.23
2025-04-09T11:01:56.76 8.23
2025-04-09T11:01:57.76 8.23
2025-04-09T11:01:58.76 8.26
2025-04-09T11:01:59.76 8.23
2025-04-09T11:02:00.76 8.23
2025-04-09T11:02:01.76 8.21
2025-04-09T11:02:02.76 8.23
2025-04-09T11:02:03.76 8.23
2025-04-09T11:02:04.76 8.23
2025-04-09T11:02:05.76 8.24
2025-04-09T11:02:06.76 8.21
2025-04-09T11:02:07.76 8.23
2025-04-09T11:02:08.76 8.24
2025-04-09T11:02:09.76 8.23
2025-04-09T11:02:10.76 8.23
2025-04-09T11:02:11.76 8.25
2025-04-09T11:02:12.76 8.23
2025-04-09T11:02:13.76 8.23
2025-04-09T11:02:14.76 8.24
2025-04-09T11:02:15.76 8.22
2025-04-09T11:02:16.76 8.20
2025-04-09T11:02:17.76 8.24
2025-04-09T11:02:18.77 8.24
2025-04-09T11:02:19.77 8.23
2025-04-09T11:02:20.77 8.21
2025-04-09T11:02:21.77 8.24
2025-04-09T11:02:22.77 8.22
2025-04-09T11:02:23.77 8.24
2025-04-09T11:02:24.77 8.23
2025-04-09T11:02:25.77 8.23
2025-04-09T11:02:26.77 8.23
2025-04-09T11:02:27.77 8.23
2025-04-09T11:02:28.77 8.23
2025-04-09T11:02:29.77 8.24
2025-04-09T11:02:30.77 8.23
2025-04-09T11:02:31.77 8.21
2025-04-09T11:02:32.77 8.25
2025-04-09T11:02:33.77 8.24
2025-04-09T11:02:34.77 8.25
2025-04-09T11:02:35.77 8.23
2025-04-09T11:02:36.77 8.24
2025-04-09T11:02:37.77 8.23
2025-04-09T11:02:38.77 8.23
2025-04-09T11:02:39.77 8.23
2025-04-09T11:02:40.77 8.21
2025-04-09T11:02:41.77 8.23
2025-04-09T11:02:42.77 8.23
2025-04-09T11:02:43.77 8.23
2025-04-09T11:02:44.77 8.23
2025-04-09T11:02:45.77 8.23
2025-04-09T11:02:46.77 8.24
2025-04-09T11:02:47.77 8.23
2025-04-09T11:02:48.77 8.24
2025-04-09T11:02:49.77 8.22
2025-04-09T11:02:50.77 8.24
2025-04-09T11:02:51.77 8.25
2025-04-09T11:02:52.77 8.24
2025-04-09T11:02:53.77 8.23
2025-04-09T11:02:54.77 8.21
2025-04-09T11:02:55.77 8.23
2025-04-09T11:02:56.77 8.23
2025-04-09T11:02:57.77 8.21
2025-04-09T11:02:58.77 8.24
2025-04-09T11:02:59.77 8.21
2025-04-09T11:03:00.77 8.24
2025-04-09T11:03:01.77 8.25
2025-04-09T11:03:02.77 8.22
2025-04-09T11:03:03.77 8.22
2025-04-09T11:03:04.77 8.25
2025-04-09T11:03:05.77 8.23
2025-04-09T11:03:06.77 8.26
2025-04-09T11:03:07.77 8.25
2025-04-09T11:03:08.77 8.24
2025-04-09T11:03:09.77 8.23
2025-04-09T11:03:10.77 8.21
2025-04-09T11:03:11.77 8.26
2025-04-09T11:03:12.77 8.23
2025-04-09T11:03:13.77 8.24
2025-04-09T11:03:14.77 8.24
2025-04-09T11:03:15.77 8.21
2025-04-09T11:03:16.77 8.25
2025-04-09T11:03:17.77 8.24
2025-04-09T11:03:18.77 8.23
2025-04-09T11:03:19.77 8.23
2025-04-09T11:03:20.77 8.22
2025-04-09T11:03:21.77 8.23
2025-04-09T11:03:22.77 8.23
2025-04-09T11:03:23.77 8.25
2025-04-09T11:03:24.77 8.28
2025-04-09T11:03:25.77 8.23
2025-04-09T11:03:26.77 8.22
2025-04-09T11:03:27.77 8.24
2025-04-09T11:03:28.77 8.23
2025-04-09T11:03:29.77 8.23
2025-04-09T11:03:30.77 8.21
2025-04-09T11:03:31.77 8.26
2025-04-09T11:03:32.77 8.23
2025-04-09T11:03:33.77 8.23
2025-04-09T11:03:34.77 8.23
2025-04-09T11:03:35.77 8.23
2025-04-09T11:03:36.77 8.25
2025-04-09T11:03:37.77 8.22
2025-04-09T11:03:38.77 8.24
2025-04-09T11:03:39.77 8.23
2025-04-09T11:03:40.77 8.25
2025-04-09T11:03:41.77 8.22
2025-04-09T11:03:42.77 8.24
2025-04-09T11:03:43.77 8.24
2025-04-09T11:03:44.77 8.20
2025-04-09T11:03:45.77 8.24
2025-04-09T11:03:46.77 8.24
2025-04-09T11:03:47.77 8.24
2025-04-09T11:03:48.77 8.23
2025-04-09T11:03:49.77 8.23
2025-04-09T11:03:50.77 8.25
2025-04-09T11:03:51.77 8.25
2025-04-09T11:03:52.77 8.25
2025-04-09T11:03:53.77 8.24
2025-04-09T11:03:54.77 8.21
2025-04-09T11:03:55.77 8.26
2025-04-09T11:03:56.77 8.23
2025-04-09T11:03:57.77 8.23
2025-04-09T11:03:58.77 8.21
2025-04-09T11:03:59.77 8.25
2025-04-09T11:04:00.77 8.21
2025-04-09T11:04:01.77 8.24
2025-04-09T11:04:02.77 8.24
2025-04-09T11:04:03.77 8.25
2025-04-09T11:04:04.77 8.19
2025-04-09T11:04:05.77 8.25
2025-04-09T11:04:06.77 8.23
2025-04-09T11:04:07.77 8.23
2025-04-09T11:04:08.77 8.24
2025-04-09T11:04:09.77 8.23
2025-04-09T11:04:10.77 8.24
2025-04-09T11:04:11.77 8.23
2025-04-09T11:04:12.77 8.21
2025-04-09T11:04:13.77 8.21
2025-04-09T11:04:14.77 8.23
2025-04-09T11:04:15.77 8.26
2025-04-09T11:04:16.77 8.22
2025-04-09T11:04:17.77 8.24
2025-04-09T11:04:18.77 8.23
2025-04-09T11:04:19.77 8.23
2025-04-09T11:04:20.77 8.23
2025-04-09T11:04:21.77 8.23
2025-04-09T11:04:22.77 8.21
2025-04-09T11:04:23.77 8.25
2025-04-09T11:04:24.77 8.24
2025-04-09T11:04:25.77 8.23
2025-04-09T11:04:26.77 8.25
2025-04-09T11:04:27.77 8.25
2025-04-09T11:04:28.77 8.26
2025-04-09T11:04:29.77 8.24
2025-04-09T11:04:30.77 8.23
2025-04-09T11:04:31.77 8.25
2025-04-09T11:04:32.77 8.21
2025-04-09T11:04:33.77 8.23
2025-04-09T11:04:34.77 8.23
2025-04-09T11:04:35.77 8.25
2025-04-09T11:04:36.77 8.23
2025-04-09T11:04:37.77 8.23
2025-04-09T11:04:38.77 8.23
2025-04-09T11:04:39.77 8.21
2025-04-09T11:04:40.77 8.23
2025-04-09T11:04:41.77 8.24
2025-04-09T11:04:42.77 8.22
2025-04-09T11:04:43.77 8.23
2025-04-09T11:04:44.77 8.23
2025-04-09T11:04:45.77 8.23
2025-04-09T11:04:46.77 8.23
2025-04-09T11:04:47.77 8.25
2025-04-09T11:04:48.77 8.23
2025-04-09T11:04:49.77 8.25
2025-04-09T11:04:50.77 8.23
2025-04-09T11:04:51.77 8.25
2025-04-09T11:04:52.77 8.25
2025-04-09T11:04:53.77 8.23
2025-04-09T11:04:54.77 8.23
2025-04-09T11:04:55.77 8.21
2025-04-09T11:04:56.77 8.23
2025-04-09T11:04:57.77 8.22
2025-04-09T11:04:58.77 8.23
2025-04-09T11:04:59.77 8.23
2025-04-09T11:05:00.77 8.22
2025-04-09T11:05:01.77 8.23
2025-04-09T11:05:02.83 8.24
2025-04-09T11:05:03.76 8.21
2025-04-09T11:05:04.76 8.25
2025-04-09T11:05:05.76 8.22
2025-04-09T11:05:06.76 8.21
2025-04-09T11:05:07.76 8.23
2025-04-09T11:05:08.76 8.23
2025-04-09T11:05:09.76 8.23
2025-04-09T11:05:10.76 8.23
2025-04-09T11:05:11.76 8.22
2025-04-09T11:05:12.76 8.23
2025-04-09T11:05:13.76 8.25
2025-04-09T11:05:14.76 8.25
2025-04-09T11:05:15.76 8.25
2025-04-09T11:05:16.76 8.23
2025-04-09T11:05:17.76 8.24
2025-04-09T11:05:18.76 8.23
2025-04-09T11:05:19.76 8.22
2025-04-09T11:05:20.76 8.23
2025-04-09T11:05:21.76 8.23
2025-04-09T11:05:22.76 8.23
2025-04-09T11:05:23.76 8.24
2025-04-09T11:05:24.76 8.24
2025-04-09T11:05:25.76 8.24
2025-04-09T11:05:26.76 8.21
2025-04-09T11:05:27.76 8.22
2025-04-09T11:05:28.76 8.21
2025-04-09T11:05:29.76 8.23
2025-04-09T11:05:30.76 8.23
2025-04-09T11:05:31.76 8.23
2025-04-09T11:05:32.76 8.23
2025-04-09T11:05:33.76 8.23
2025-04-09T11:05:34.76 8.23
2025-04-09T11:05:35.76 8.23
2025-04-09T11:05:36.76 8.23
2025-04-09T11:05:37.76 8.23
2025-04-09T11:05:38.76 8.22
2025-04-09T11:05:39.76 8.23
2025-04-09T11:05:40.76 8.23
2025-04-09T11:05:41.76 8.23
2025-04-09T11:05:42.76 8.23
2025-04-09T11:05:43.76 8.25
2025-04-09T11:05:44.76 8.21
2025-04-09T11:05:45.76 8.24
2025-04-09T11:05:46.76 8.23
2025-04-09T11:05:47.76 8.24
2025-04-09T11:05:48.76 8.24
2025-04-09T11:05:49.76 8.24
2025-04-09T11:05:50.76 8.24
2025-04-09T11:05:51.76 8.22
2025-04-09T11:05:52.76 8.22
2025-04-09T11:05:53.76 8.24
2025-04-09T11:05:54.76 8.21
2025-04-09T11:05:55.76 8.25
2025-04-09T11:05:56.76 8.23
2025-04-09T11:05:57.76 8.23
2025-04-09T11:05:58.76 8.21
2025-04-09T11:05:59.76 8.23
2025-04-09T11:06:00.76 8.23
2025-04-09T11:06:01.76 8.21
2025-04-09T11:06:02.76 8.22
2025-04-09T11:06:03.76 8.22
2025-04-09T11:06:04.76 8.22
2025-04-09T11:06:05.76 8.25
2025-04-09T11:06:06.76 8.23
2025-04-09T11:06:07.76 8.25
2025-04-09T11:06:08.76 8.21
2025-04-09T11:06:09.76 8.23
2025-04-09T11:06:10.76 8.23
2025-04-09T11:06:11.76 8.22
2025-04-09T11:06:12.76 8.23
2025-04-09T11:06:13.76 8.22
2025-04-09T11:06:14.76 8.24
2025-04-09T11:06:15.76 8.22
2025-04-09T11:06:16.76 8.23
2025-04-09T11:06:17.76 8.24
2025-04-09T11:06:18.76 8.23
2025-04-09T11:06:19.76 8.24
2025-04-09T11:06:20.76 8.22
2025-04-09T11:06:21.76 8.25
2025-04-09T11:06:22.76 8.25
2025-04-09T11:06:23.76 8.24
2025-04-09T11:06:24.76 8.23
2025-04-09T11:06:25.76 8.21
2025-04-09T11:06:26.76 8.23
2025-04-09T11:06:27.76 8.25
2025-04-09T11:06:28.76 8.24
2025-04-09T11:06:29.76 8.27
2025-04-09T11:06:30.76 8.26
2025-04-09T11:06:31.76 8.25
2025-04-09T11:06:32.76 8.25
2025-04-09T11:06:33.76 8.24
2025-04-09T11:06:34.76 8.25
2025-04-09T11:06:35.76 8.25
2025-04-09T11:06:36.76 8.23
2025-04-09T11:06:37.76 8.26
2025-04-09T11:06:38.76 8.24
2025-04-09T11:06:39.76 8.23
2025-04-09T11:06:40.76 8.22
2025-04-09T11:06:41.76 8.22
2025-04-09T11:06:42.76 8.25
2025-04-09T11:06:43.76 8.24
2025-04-09T11:06:44.76 8.24
2025-04-09T11:06:45.76 8.22
2025-04-09T11:06:46.76 8.24
2025-04-09T11:06:47.76 8.23
2025-04-09T11:06:48.76 8.23
2025-04-09T11:06:49.76 8.23
2025-04-09T11:06:50.76 8.24
2025-04-09T11:06:51.76 8.23
2025-04-09T11:06:52.76 8.25
2025-04-09T11:06:53.76 8.25
2025-04-09T11:06:54.76 8.23
2025-04-09T11:06:55.76 8.26
2025-04-09T11:06:56.76 8.22
2025-04-09T11:06:57.76 8.24
2025-04-09T11:06:58.76 8.24
2025-04-09T11:06:59.76 8.21
2025-04-09T11:07:00.76 8.25
2025-04-09T11:07:01.76 8.25
2025-04-09T11:07:02.76 8.24
2025-04-09T11:07:03.76 8.22
2025-04-09T11:07:04.76 8.23
2025-04-09T11:07:05.76 8.23
2025-04-09T11:07:06.76 8.23
2025-04-09T11:07:07.76 8.22
2025-04-09T11:07:08.76 8.23
2025-04-09T11:07:09.76 8.22
2025-04-09T11:07:10.76 8.25
2025-04-09T11:07:11.76 8.24
2025-04-09T11:07:12.76 8.23
2025-04-09T11:07:13.76 8.23
2025-04-09T11:07:14.76 8.23
2025-04-09T11:07:15.76 8.22
2025-04-09T11:07:16.76 8.24
2025-04-09T11:07:17.76 8.23
2025-04-09T11:07:18.76 8.25
2025-04-09T11:07:19.76 8.25
2025-04-09T11:07:20.76 8.25
2025-04-09T11:07:21.76 8.24
2025-04-09T11:07:22.76 8.21
2025-04-09T11:07:23.76 8.23
2025-04-09T11:07:24.76 8.24
2025-04-09T11:07:25.76 8.22
2025-04-09T11:07:26.76 8.25
2025-04-09T11:07:27.76 8.22
2025-04-09T11:07:28.76 8.22
2025-04-09T11:07:29.77 8.24
2025-04-09T11:07:30.76 8.23
2025-04-09T11:07:31.76 8.23
2025-04-09T11:07:32.76 8.25
2025-04-09T11:07:33.76 8.24
2025-04-09T11:07:34.76 8.25
2025-04-09T11:07:35.76 8.22
2025-04-09T11:07:36.77 8.21
2025-04-09T11:07:37.77 8.25
2025-04-09T11:07:38.77 8.24
2025-04-09T11:07:39.77 8.25
2025-04-09T11:07:40.77 8.25
2025-04-09T11:07:41.77 8.23
2025-04-09T11:07:42.77 8.23
2025-04-09T11:07:43.77 8.23
2025-04-09T11:07:44.77 8.22
2025-04-09T11:07:45.77 8.23
2025-04-09T11:07:46.77 8.22
2025-04-09T11:07:47.77 8.23
2025-04-09T11:07:48.77 8.25
2025-04-09T11:07:49.77 8.23
2025-04-09T11:07:50.77 8.24
2025-04-09T11:07:51.77 8.23
2025-04-09T11:07:52.77 8.25
2025-04-09T11:07:53.77 8.23
2025-04-09T11:07:54.77 8.25
2025-04-09T11:07:55.77 8.23
2025-04-09T11:07:56.77 8.23
2025-04-09T11:07:57.77 8.21
2025-04-09T11:07:58.77 8.22
2025-04-09T11:07:59.77 8.23
2025-04-09T11:08:00.77 8.22
2025-04-09T11:08:01.77 8.26
2025-04-09T11:08:02.77 8.22
2025-04-09T11:08:03.77 8.23
2025-04-09T11:08:04.77 8.23
2025-04-09T11:08:05.77 8.23
2025-04-09T11:08:06.77 8.25
2025-04-09T11:08:07.77 8.24
2025-04-09T11:08:08.77 8.22
2025-04-09T11:08:09.77 8.23
2025-04-09T11:08:10.77 8.23
2025-04-09T11:08:11.77 8.24
2025-04-09T11:08:12.77 8.25
2025-04-09T11:08:13.77 8.23
2025-04-09T11:08:14.77 8.23
2025-04-09T11:08:15.77 8.23
2025-04-09T11:08:16.77 8.21
2025-04-09T11:08:17.77 8.22
2025-04-09T11:08:18.77 8.22
2025-04-09T11:08:19.77 8.25
2025-04-09T11:08:20.77 8.23
2025-04-09T11:08:21.77 8.21
2025-04-09T11:08:22.77 8.24
2025-04-09T11:08:23.77 8.22
2025-04-09T11:08:24.77 8.24
2025-04-09T11:08:25.77 8.23
2025-04-09T11:08:26.77 8.22
2025-04-09T11:08:27.77 8.25
2025-04-09T11:08:28.77 8.21
2025-04-09T11:08:29.77 8.27
2025-04-09T11:08:30.77 8.24
2025-04-09T11:08:31.77 8.23
2025-04-09T11:08:32.77 8.22
2025-04-09T11:08:33.77 8.24
2025-04-09T11:08:34.77 8.25
2025-04-09T11:08:35.77 8.23
2025-04-09T11:08:36.77 8.26
2025-04-09T11:08:37.77 8.24
2025-04-09T11:08:38.77 8.23
2025-04-09T11:08:39.77 8.26
2025-04-09T11:08:40.77 8.25
2025-04-09T11:08:41.77 8.24
2025-04-09T11:08:42.77 8.23
2025-04-09T11:08:43.77 8.23
2025-04-09T11:08:44.77 8.26
2025-04-09T11:08:45.77 8.23
2025-04-09T11:08:46.77 8.22
2025-04-09T11:08:47.77 8.24
2025-04-09T11:08:48.77 8.24
2025-04-09T11:08:49.77 8.23
2025-04-09T11:08:50.77 8.22
2025-04-09T11:08:51.77 8.23
2025-04-09T11:08:52.77 8.24
2025-04-09T11:08:53.77 8.24
2025-04-09T11:08:54.78 8.24
2025-04-09T11:08:55.76 8.23
2025-04-09T11:08:56.76 8.23
2025-04-09T11:08:57.76 8.25
2025-04-09T11:08:58.76 8.25
2025-04-09T11:08:59.76 8.21
2025-04-09T11:09:00.76 8.23
2025-04-09T11:09:01.76 8.23
2025-04-09T11:09:02.76 8.24
2025-04-09T11:09:03.76 8.24
2025-04-09T11:09:04.76 8.21
2025-04-09T11:09:05.76 8.23
2025-04-09T11:09:06.76 8.23
2025-04-09T11:09:07.76 8.26
2025-04-09T11:09:08.76 8.25
2025-04-09T11:09:09.76 8.24
2025-04-09T11:09:10.76 8.23
2025-04-09T11:09:11.76 8.25
2025-04-09T11:09:12.76 8.22
2025-04-09T11:09:13.76 8.24
2025-04-09T11:09:14.76 8.23
2025-04-09T11:09:15.76 8.25
2025-04-09T11:09:16.76 8.22
2025-04-09T11:09:17.76 8.22
2025-04-09T11:09:18.76 8.26
2025-04-09T11:09:19.76 8.23
2025-04-09T11:09:20.76 8.23
2025-04-09T11:09:21.76 8.21
2025-04-09T11:09:22.76 8.24
2025-04-09T11:09:23.76 8.25
2025-04-09T11:09:24.76 8.25
2025-04-09T11:09:25.76 8.25
2025-04-09T11:09:26.76 8.25
2025-04-09T11:09:27.76 8.25
2025-04-09T11:09:28.76 8.25
2025-04-09T11:09:29.76 8.26
2025-04-09T11:09:30.76 8.25
2025-04-09T11:09:31.76 8.23
2025-04-09T11:09:32.76 8.25
2025-04-09T11:09:33.76 8.23
2025-04-09T11:09:34.76 8.25
2025-04-09T11:09:35.76 8.25
2025-04-09T11:09:36.76 8.25
2025-04-09T11:09:37.76 8.24
2025-04-09T11:09:38.76 8.24
2025-04-09T11:09:39.76 8.22
2025-04-09T11:09:40.76 8.23
2025-04-09T11:09:41.76 8.24
2025-04-09T11:09:42.76 8.23
2025-04-09T11:09:43.76 8.25
2025-04-09T11:09:44.76 8.23
2025-04-09T11:09:45.76 8.26
2025-04-09T11:09:46.76 8.25
2025-04-09T11:09:47.76 8.25
2025-04-09T11:09:48.76 8.23
2025-04-09T11:09:49.76 8.25
2025-04-09T11:09:50.76 8.26
2025-04-09T11:09:51.76 8.25
2025-04-09T11:09:52.76 8.26
2025-04-09T11:09:53.76 8.25
2025-04-09T11:09:54.76 8.25
2025-04-09T11:09:55.76 8.23
2025-04-09T11:09:56.76 8.25
2025-04-09T11:09:57.76 8.23
2025-04-09T11:09:58.76 8.23
2025-04-09T11:09:59.76 8.26
2025-04-09T11:10:00.76 8.22
2025-04-09T11:10:01.76 8.23
2025-04-09T11:10:02.76 8.23
2025-04-09T11:10:03.76 8.26
2025-04-09T11:10:04.76 8.23
2025-04-09T11:10:05.76 8.23
2025-04-09T11:10:06.76 8.24
2025-04-09T11:10:07.76 8.24
2025-04-09T11:10:08.76 8.21
2025-04-09T11:10:09.76 8.21
2025-04-09T11:10:10.76 8.23
2025-04-09T11:10:11.76 8.23
2025-04-09T11:10:12.76 8.23
2025-04-09T11:10:13.76 8.23
2025-04-09T11:10:14.76 8.24
2025-04-09T11:10:15.76 8.26
2025-04-09T11:10:16.76 8.24
2025-04-09T11:10:17.76 8.23
2025-04-09T11:10:18.76 8.22
2025-04-09T11:10:19.76 8.24
2025-04-09T11:10:20.76 8.25
2025-04-09T11:10:21.76 8.25
2025-04-09T11:10:22.76 8.23
2025-04-09T11:10:23.76 8.24
2025-04-09T11:10:24.76 8.20
2025-04-09T11:10:25.76 8.23
2025-04-09T11:10:26.76 8.26
2025-04-09T11:10:27.76 8.23
2025-04-09T11:10:28.76 8.23
2025-04-09T11:10:29.76 8.24
2025-04-09T11:10:30.76 8.22
2025-04-09T11:10:31.76 8.21
2025-04-09T11:10:32.76 8.25
2025-04-09T11:10:33.76 8.25
2025-04-09T11:10:34.76 8.25
2025-04-09T11:10:35.76 8.24
2025-04-09T11:10:36.76 8.26
2025-04-09T11:10:37.76 8.23
2025-04-09T11:10:38.76 8.23
2025-04-09T11:10:39.76 8.24
2025-04-09T11:10:40.76 8.25
2025-04-09T11:10:41.76 8.20
2025-04-09T11:10:42.76 8.23
2025-04-09T11:10:43.76 8.25
2025-04-09T11:10:44.76 8.25
2025-04-09T11:10:45.76 8.25
2025-04-09T11:10:46.76 8.24
2025-04-09T11:10:47.76 8.25
2025-04-09T11:10:48.76 8.25
2025-04-09T11:10:49.76 8.24
2025-04-09T11:10:50.76 8.25
2025-04-09T11:10:51.76 8.25
2025-04-09T11:10:52.76 8.21
2025-04-09T11:10:53.76 8.21
2025-04-09T11:10:54.76 8.25
2025-04-09T11:10:55.76 8.23
2025-04-09T11:10:56.76 8.23
2025-04-09T11:10:57.76 8.23
2025-04-09T11:10:58.76 8.24
2025-04-09T11:10:59.76 8.23
2025-04-09T11:11:00.76 8.23
2025-04-09T11:11:01.76 8.27
2025-04-09T11:11:02.76 8.24
2025-04-09T11:11:03.76 8.24
2025-04-09T11:11:04.76 8.25
2025-04-09T11:11:05.76 8.23
2025-04-09T11:11:06.76 8.23
2025-04-09T11:11:07.76 8.23
2025-04-09T11:11:08.76 8.22
2025-04-09T11:11:09.76 8.24
2025-04-09T11:11:10.76 8.23
2025-04-09T11:11:11.76 8.22
2025-04-09T11:11:12.76 8.23
2025-04-09T11:11:13.76 8.25
2025-04-09T11:11:14.76 8.21
2025-04-09T11:11:15.76 8.23
2025-04-09T11:11:16.76 8.25
2025-04-09T11:11:17.76 8.22
2025-04-09T11:11:18.76 8.25
2025-04-09T11:11:19.76 8.23
2025-04-09T11:11:20.76 8.26
2025-04-09T11:11:21.76 8.22
2025-04-09T11:11:22.76 8.24
2025-04-09T11:11:23.76 8.23
2025-04-09T11:11:24.76 8.21
2025-04-09T11:11:25.76 8.24
2025-04-09T11:11:26.76 8.24
2025-04-09T11:11:27.76 8.23
2025-04-09T11:11:28.76 8.21
2025-04-09T11:11:29.76 8.21
2025-04-09T11:11:30.76 8.25
2025-04-09T11:11:31.76 8.24
2025-04-09T11:11:32.76 8.23
2025-04-09T11:11:33.76 8.25
2025-04-09T11:11:34.76 8.24
2025-04-09T11:11:35.76 8.25
2025-04-09T11:11:36.76 8.22
2025-04-09T11:11:37.76 8.25
2025-04-09T11:11:38.76 8.25
2025-04-09T11:11:39.76 8.23
2025-04-09T11:11:40.76 8.24
2025-04-09T11:11:41.76 8.24
2025-04-09T11:11:42.76 8.23
2025-04-09T11:11:43.76 8.24
2025-04-09T11:11:44.76 8.21
2025-04-09T11:11:45.76 8.20
2025-04-09T11:11:46.76 8.24
2025-04-09T11:11:47.76 8.22
2025-04-09T11:11:48.76 8.22
2025-04-09T11:11:49.76 8.23
2025-04-09T11:11:50.76 8.26
2025-04-09T11:11:51.76 8.24
2025-04-09T11:11:52.76 8.25
2025-04-09T11:11:53.76 8.23
2025-04-09T11:11:54.76 8.23
2025-04-09T11:11:55.76 8.24
2025-04-09T11:11:56.76 8.26
2025-04-09T11:11:57.76 8.26
2025-04-09T11:11:58.76 8.25
2025-04-09T11:11:59.76 8.24
2025-04-09T11:12:00.76 8.25
2025-04-09T11:12:01.76 8.26
2025-04-09T11:12:02.76 8.25
2025-04-09T11:12:03.76 8.25
2025-04-09T11:12:04.76 8.25
2025-04-09T11:12:05.76 8.26
2025-04-09T11:12:06.76 8.24
2025-04-09T11:12:07.76 8.23
2025-04-09T11:12:08.76 8.23
2025-04-09T11:12:09.76 8.24
2025-04-09T11:12:10.76 8.25
2025-04-09T11:12:11.76 8.25
2025-04-09T11:12:12.76 8.24
2025-04-09T11:12:13.76 8.25
2025-04-09T11:12:14.76 8.25
2025-04-09T11:12:15.76 8.23
2025-04-09T11:12:16.76 8.22
2025-04-09T11:12:17.76 8.21
2025-04-09T11:12:18.76 8.23
2025-04-09T11:12:19.76 8.22
2025-04-09T11:12:20.76 8.21
2025-04-09T11:12:21.76 8.23
2025-04-09T11:12:22.76 8.23
2025-04-09T11:12:23.76 8.22
2025-04-09T11:12:24.76 8.24
2025-04-09T11:12:25.76 8.25
2025-04-09T11:12:26.76 8.25
2025-04-09T11:12:27.76 8.25
2025-04-09T11:12:28.76 8.22
2025-04-09T11:12:29.76 8.23
2025-04-09T11:12:30.76 8.24
2025-04-09T11:12:31.76 8.23
2025-04-09T11:12:32.76 8.21
2025-04-09T11:12:33.76 8.24
2025-04-09T11:12:34.76 8.23
2025-04-09T11:12:35.76 8.21
2025-04-09T11:12:36.76 8.23
2025-04-09T11:12:37.76 8.23
2025-04-09T11:12:38.76 8.23
2025-04-09T11:12:39.76 8.23
2025-04-09T11:12:40.76 8.24
2025-04-09T11:12:41.76 8.24
2025-04-09T11:12:42.76 8.25
2025-04-09T11:12:43.76 8.22
2025-04-09T11:12:44.76 8.26
2025-04-09T11:12:45.76 8.23
2025-04-09T11:12:46.77 8.24
2025-04-09T11:12:47.75 8.23
2025-04-09T11:12:48.75 8.23
2025-04-09T11:12:49.75 8.23
2025-04-09T11:12:50.75 8.23
2025-04-09T11:12:51.75 8.22
2025-04-09T11:12:52.75 8.23
2025-04-09T11:12:53.75 8.21
2025-04-09T11:12:54.76 8.26
2025-04-09T11:12:55.76 8.23
2025-04-09T11:12:56.76 8.25
2025-04-09T11:12:57.76 8.25
2025-04-09T11:12:58.76 8.23
2025-04-09T11:12:59.76 8.23
2025-04-09T11:13:00.76 8.25
2025-04-09T11:13:01.76 8.23
2025-04-09T11:13:02.76 8.24
2025-04-09T11:13:03.76 8.23
2025-04-09T11:13:04.76 8.23
2025-04-09T11:13:05.76 8.25
2025-04-09T11:13:06.76 8.23
2025-04-09T11:13:07.76 8.21
2025-04-09T11:13:08.76 8.23
2025-04-09T11:13:09.76 8.26
2025-04-09T11:13:10.76 8.22
2025-04-09T11:13:11.76 8.23
2025-04-09T11:13:12.76 8.23
2025-04-09T11:13:13.76 8.23
2025-04-09T11:13:14.76 8.24
2025-04-09T11:13:15.77 8.24
2025-04-09T11:13:16.75 8.22
2025-04-09T11:13:17.75 8.23
2025-04-09T11:13:18.75 8.22
2025-04-09T11:13:19.75 8.23
2025-04-09T11:13:20.75 8.25
2025-04-09T11:13:21.75 8.26
2025-04-09T11:13:22.75 8.23
2025-04-09T11:13:23.75 8.24
2025-04-09T11:13:24.75 8.23
2025-04-09T11:13:25.75 8.23
2025-04-09T11:13:26.75 8.23
2025-04-09T11:13:27.75 8.23
2025-04-09T11:13:28.75 8.25
2025-04-09T11:13:29.75 8.22
2025-04-09T11:13:30.75 8.23
2025-04-09T11:13:31.75 8.23
2025-04-09T11:13:32.75 8.21
2025-04-09T11:13:33.75 8.25
2025-04-09T11:13:34.75 8.23
2025-04-09T11:13:35.75 8.25
2025-04-09T11:13:36.75 8.24
2025-04-09T11:13:37.75 8.25
2025-04-09T11:13:38.75 8.23
2025-04-09T11:13:39.75 8.24
2025-04-09T11:13:40.75 8.24
2025-04-09T11:13:41.75 8.23
2025-04-09T11:13:42.75 8.24
2025-04-09T11:13:43.75 8.25
2025-04-09T11:13:44.75 8.26
2025-04-09T11:13:45.75 8.23
2025-04-09T11:13:46.75 8.23
2025-04-09T11:13:47.75 8.23
2025-04-09T11:13:48.75 8.23
2025-04-09T11:13:49.75 8.24
2025-04-09T11:13:50.75 8.27
2025-04-09T11:13:51.75 8.23
2025-04-09T11:13:52.75 8.21
2025-04-09T11:13:53.75 8.21
2025-04-09T11:13:54.75 8.22
2025-04-09T11:13:55.75 8.24
2025-04-09T11:13:56.75 8.23
2025-04-09T11:13:57.75 8.23
2025-04-09T11:13:58.75 8.23
2025-04-09T11:13:59.75 8.24
2025-04-09T11:14:00.75 8.24
2025-04-09T11:14:01.75 8.23
2025-04-09T11:14:02.75 8.23
2025-04-09T11:14:03.75 8.21
2025-04-09T11:14:04.75 8.25
2025-04-09T11:14:05.75 8.23
2025-04-09T11:14:06.75 8.25
2025-04-09T11:14:07.75 8.24
2025-04-09T11:14:08.75 8.23
2025-04-09T11:14:09.75 8.23
2025-04-09T11:14:10.75 8.23
2025-04-09T11:14:11.75 8.25
2025-04-09T11:14:12.75 8.25
2025-04-09T11:14:13.75 8.23
2025-04-09T11:14:14.75 8.22
2025-04-09T11:14:15.75 8.23
2025-04-09T11:14:16.75 8.24
2025-04-09T11:14:17.75 8.23
2025-04-09T11:14:18.75 8.24
2025-04-09T11:14:19.75 8.21
2025-04-09T11:14:20.75 8.24
2025-04-09T11:14:21.75 8.23
2025-04-09T11:14:22.75 8.22
2025-04-09T11:14:23.75 8.24
2025-04-09T11:14:24.75 8.23
2025-04-09T11:14:25.75 8.22
2025-04-09T11:14:26.75 8.24
2025-04-09T11:14:27.75 8.26
2025-04-09T11:14:28.75 8.25
2025-04-09T11:14:29.75 8.23
2025-04-09T11:14:30.75 8.21
2025-04-09T11:14:31.75 8.23
2025-04-09T11:14:32.75 8.24
2025-04-09T11:14:33.75 8.26
2025-04-09T11:14:34.75 8.25
2025-04-09T11:14:35.75 8.24
2025-04-09T11:14:36.75 8.23
2025-04-09T11:14:37.75 8.23
2025-04-09T11:14:38.75 8.23
2025-04-09T11:14:39.75 8.23
2025-04-09T11:14:40.75 8.21
2025-04-09T11:14:41.75 8.25
2025-04-09T11:14:42.75 8.23
2025-04-09T11:14:43.75 8.24
2025-04-09T11:14:44.75 8.24
2025-04-09T11:14:45.75 8.24
2025-04-09T11:14:46.75 8.22
2025-04-09T11:14:47.75 8.23
2025-04-09T11:14:48.75 8.25
2025-04-09T11:14:49.75 8.21
2025-04-09T11:14:50.75 8.24
2025-04-09T11:14:51.75 8.25
2025-04-09T11:14:52.75 8.22
2025-04-09T11:14:53.75 8.21
2025-04-09T11:14:54.75 8.25
2025-04-09T11:14:55.75 8.25
2025-04-09T11:14:56.75 8.24
2025-04-09T11:14:57.75 8.25
2025-04-09T11:14:58.75 8.23
2025-04-09T11:14:59.75 8.23
2025-04-09T11:15:00.75 8.22
2025-04-09T11:15:01.75 8.22
2025-04-09T11:15:02.75 8.23
2025-04-09T11:15:03.75 8.24
2025-04-09T11:15:04.75 8.23
2025-04-09T11:15:05.75 8.23
2025-04-09T11:15:06.75 8.24
2025-04-09T11:15:07.75 8.25
2025-04-09T11:15:08.75 8.22
2025-04-09T11:15:09.75 8.24
2025-04-09T11:15:10.75 8.21
2025-04-09T11:15:11.75 8.23
2025-04-09T11:15:12.75 8.25
2025-04-09T11:15:13.75 8.24
2025-04-09T11:15:14.75 8.24
2025-04-09T11:15:15.75 8.24
2025-04-09T11:15:16.75 8.24
2025-04-09T11:15:17.75 8.24
2025-04-09T11:15:18.75 8.24
2025-04-09T11:15:19.75 8.23
2025-04-09T11:15:20.75 8.23
2025-04-09T11:15:21.75 8.21
2025-04-09T11:15:22.75 8.23
2025-04-09T11:15:23.75 8.24
2025-04-09T11:15:24.75 8.25
2025-04-09T11:15:25.75 8.24
2025-04-09T11:15:26.75 8.26
2025-04-09T11:15:27.75 8.26
2025-04-09T11:15:28.75 8.24
2025-04-09T11:15:29.75 8.23
2025-04-09T11:15:30.75 8.25
2025-04-09T11:15:31.75 8.23
2025-04-09T11:15:32.75 8.25
2025-04-09T11:15:33.75 8.24
2025-04-09T11:15:34.75 8.23
2025-04-09T11:15:35.75 8.23
2025-04-09T11:15:36.75 8.25
2025-04-09T11:15:37.75 8.26
2025-04-09T11:15:38.75 8.25
2025-04-09T11:15:39.75 8.23
2025-04-09T11:15:40.75 8.20
2025-04-09T11:15:41.75 8.21
2025-04-09T11:15:42.75 8.23
2025-04-09T11:15:43.75 8.25
2025-04-09T11:15:44.75 8.26
2025-04-09T11:15:45.75 8.25
2025-04-09T11:15:46.75 8.23
2025-04-09T11:15:47.75 8.25
2025-04-09T11:15:48.75 8.26
2025-04-09T11:15:49.75 8.20
2025-04-09T11:15:50.75 8.23
2025-04-09T11:15:51.75 8.25
2025-04-09T11:15:52.75 8.21
2025-04-09T11:15:53.75 8.23
2025-04-09T11:15:54.75 8.23
2025-04-09T11:15:55.75 8.23
2025-04-09T11:15:56.75 8.23
2025-04-09T11:15:57.75 8.24
2025-04-09T11:15:58.75 8.23
2025-04-09T11:15:59.75 8.25
2025-04-09T11:16:00.75 8.25
2025-04-09T11:16:01.75 8.26
2025-04-09T11:16:02.75 8.24
2025-04-09T11:16:03.75 8.25
2025-04-09T11:16:04.75 8.25
2025-04-09T11:16:05.75 8.24
2025-04-09T11:16:06.75 8.24
2025-04-09T11:16:07.75 8.23
2025-04-09T11:16:08.75 8.23
2025-04-09T11:16:09.75 8.22
2025-04-09T11:16:10.75 8.25
2025-04-09T11:16:11.75 8.25
2025-04-09T11:16:12.75 8.25
2025-04-09T11:16:13.75 8.23
2025-04-09T11:16:14.75 8.24
2025-04-09T11:16:15.75 8.23
2025-04-09T11:16:16.75 8.25
2025-04-09T11:16:17.75 8.23
2025-04-09T11:16:18.75 8.26
2025-04-09T11:16:19.75 8.23
2025-04-09T11:16:20.75 8.24
2025-04-09T11:16:21.75 8.23
2025-04-09T11:16:22.75 8.25
2025-04-09T11:16:23.75 8.25
2025-04-09T11:16:24.75 8.24
2025-04-09T11:16:25.75 8.23
2025-04-09T11:16:26.75 8.23
2025-04-09T11:16:27.75 8.23
2025-04-09T11:16:28.75 8.25
2025-04-09T11:16:29.75 8.25
2025-04-09T11:16:30.75 8.22
2025-04-09T11:16:31.75 8.25
2025-04-09T11:16:32.75 8.24
2025-04-09T11:16:33.75 8.23
2025-04-09T11:16:34.75 8.22
2025-04-09T11:16:35.75 8.23
2025-04-09T11:16:36.75 8.25
2025-04-09T11:16:37.75 8.26
2025-04-09T11:16:38.76 8.23
2025-04-09T11:16:39.74 8.21
2025-04-09T11:16:40.74 8.26
2025-04-09T11:16:41.74 8.25
2025-04-09T11:16:42.75 8.23
2025-04-09T11:16:43.74 8.21
2025-04-09T11:16:44.74 8.23
2025-04-09T11:16:45.74 8.25
2025-04-09T11:16:46.74 8.21
2025-04-09T11:16:47.74 8.23
2025-04-09T11:16:48.74 8.21
2025-04-09T11:16:49.74 8.24
2025-04-09T11:16:50.74 8.24
2025-04-09T11:16:51.74 8.22
2025-04-09T11:16:52.74 8.23
2025-04-09T11:16:53.74 8.25
2025-04-09T11:16:54.74 8.24
2025-04-09T11:16:55.74 8.24
2025-04-09T11:16:56.74 8.25
2025-04-09T11:16:57.74 8.23
2025-04-09T11:16:58.74 8.25
2025-04-09T11:16:59.74 8.22
2025-04-09T11:17:00.74 8.23
2025-04-09T11:17:01.74 8.22
2025-04-09T11:17:02.74 8.24
2025-04-09T11:17:03.74 8.24
2025-04-09T11:17:04.74 8.24
2025-04-09T11:17:05.74 8.25
2025-04-09T11:17:06.74 8.24
2025-04-09T11:17:07.74 8.25
2025-04-09T11:17:08.74 8.24
2025-04-09T11:17:09.74 8.24
2025-04-09T11:17:10.74 8.23
2025-04-09T11:17:11.74 8.24
2025-04-09T11:17:12.74 8.25
2025-04-09T11:17:13.74 8.21
2025-04-09T11:17:14.74 8.23
2025-04-09T11:17:15.74 8.23
2025-04-09T11:17:16.74 8.23
2025-04-09T11:17:17.74 8.23
2025-04-09T11:17:18.74 8.23
2025-04-09T11:17:19.74 8.23
2025-04-09T11:17:20.74 8.23
2025-04-09T11:17:21.74 8.23
2025-04-09T11:17:22.74 8.23
2025-04-09T11:17:23.74 8.25
2025-04-09T11:17:24.74 8.26
2025-04-09T11:17:25.74 8.25
2025-04-09T11:17:26.74 8.23
2025-04-09T11:17:27.74 8.20
2025-04-09T11:17:28.74 8.23
2025-04-09T11:17:29.74 8.24
2025-04-09T11:17:30.74 8.23
2025-04-09T11:17:31.74 8.24
2025-04-09T11:17:32.74 8.25
2025-04-09T11:17:33.74 8.22
2025-04-09T11:17:34.74 8.21
2025-04-09T11:17:35.74 8.23
2025-04-09T11:17:36.74 8.23
2025-04-09T11:17:37.74 8.23
2025-04-09T11:17:38.74 8.23
2025-04-09T11:17:39.74 8.24
2025-04-09T11:17:40.74 8.23
2025-04-09T11:17:41.74 8.22
2025-04-09T11:17:42.74 8.23
2025-04-09T11:17:43.74 8.23
2025-04-09T11:17:44.74 8.24
2025-04-09T11:17:45.74 8.24
2025-04-09T11:17:46.74 8.22
2025-04-09T11:17:47.74 8.23
2025-04-09T11:17:48.74 8.22
2025-04-09T11:17:49.74 8.23
2025-04-09T11:17:50.74 8.23
2025-04-09T11:17:51.74 8.23
2025-04-09T11:17:52.74 8.23
2025-04-09T11:17:53.74 8.22
2025-04-09T11:17:54.74 8.24
2025-04-09T11:17:55.74 8.21
2025-04-09T11:17:56.74 8.22
2025-04-09T11:17:57.74 8.22
2025-04-09T11:17:58.74 8.24
2025-04-09T11:17:59.74 8.25
2025-04-09T11:18:00.74 8.25
2025-04-09T11:18:01.74 8.23
2025-04-09T11:18:02.74 8.21
2025-04-09T11:18:03.74 8.21
2025-04-09T11:18:04.74 8.21
2025-04-09T11:18:05.74 8.26
2025-04-09T11:18:06.74 8.23
2025-04-09T11:18:07.74 8.22
2025-04-09T11:18:08.75 8.25
2025-04-09T11:18:09.74 8.23
2025-04-09T11:18:10.74 8.23
2025-04-09T11:18:11.75 8.25
2025-04-09T11:18:12.74 8.24
2025-04-09T11:18:13.75 8.23
2025-04-09T11:18:14.75 8.24
2025-04-09T11:18:15.75 8.23
2025-04-09T11:18:16.75 8.23
2025-04-09T11:18:17.75 8.24
2025-04-09T11:18:18.75 8.24
2025-04-09T11:18:19.75 8.26
2025-04-09T11:18:20.75 8.25
2025-04-09T11:18:21.75 8.24
2025-04-09T11:18:22.75 8.24
2025-04-09T11:18:23.75 8.24
2025-04-09T11:18:24.75 8.23
2025-04-09T11:18:25.75 8.23
2025-04-09T11:18:26.75 8.24
2025-04-09T11:18:27.75 8.23
2025-04-09T11:18:28.75 8.21
2025-04-09T11:18:29.75 8.23
2025-04-09T11:18:30.75 8.24
2025-04-09T11:18:31.75 8.23
2025-04-09T11:18:32.75 8.23
2025-04-09T11:18:33.75 8.23
2025-04-09T11:18:34.75 8.25
2025-04-09T11:18:35.75 8.23
2025-04-09T11:18:36.75 8.25
2025-04-09T11:18:37.75 8.23
2025-04-09T11:18:38.75 8.21
2025-04-09T11:18:39.75 8.23
2025-04-09T11:18:40.75 8.23
2025-04-09T11:18:41.75 8.24
2025-04-09T11:18:42.75 8.21
2025-04-09T11:18:43.75 8.23
2025-04-09T11:18:44.75 8.25
2025-04-09T11:18:45.75 8.25
2025-04-09T11:18:46.75 8.22
2025-04-09T11:18:47.75 8.21
2025-04-09T11:18:48.75 8.25
2025-04-09T11:18:49.75 8.21
2025-04-09T11:18:50.75 8.24
2025-04-09T11:18:51.75 8.24
2025-04-09T11:18:52.75 8.23
2025-04-09T11:18:53.75 8.21
2025-04-09T11:18:54.75 8.23
2025-04-09T11:18:55.75 8.25
2025-04-09T11:18:56.75 8.25
2025-04-09T11:18:57.75 8.23
2025-04-09T11:18:58.75 8.21
2025-04-09T11:18:59.75 8.22
2025-04-09T11:19:00.75 8.22
2025-04-09T11:19:01.75 8.21
2025-04-09T11:19:02.75 8.21
2025-04-09T11:19:03.75 8.24
2025-04-09T11:19:04.75 8.21
2025-04-09T11:19:05.75 8.23
2025-04-09T11:19:06.75 8.25
2025-04-09T11:19:07.75 8.22
2025-04-09T11:19:08.75 8.23
2025-04-09T11:19:09.75 8.24
2025-04-09T11:19:10.75 8.21
2025-04-09T11:19:11.75 8.23
2025-04-09T11:19:12.75 8.23
2025-04-09T11:19:13.75 8.24
2025-04-09T11:19:14.75 8.23
2025-04-09T11:19:15.75 8.24
2025-04-09T11:19:16.75 8.24
2025-04-09T11:19:17.75 8.23
2025-04-09T11:19:18.75 8.23
2025-04-09T11:19:19.75 8.21
2025-04-09T11:19:20.75 8.25
2025-04-09T11:19:21.75 8.23
2025-04-09T11:19:22.75 8.24
2025-04-09T11:19:23.75 8.25
2025-04-09T11:19:24.75 8.23
2025-04-09T11:19:25.75 8.25
2025-04-09T11:19:26.75 8.23
2025-04-09T11:19:27.75 8.21
2025-04-09T11:19:28.75 8.22
2025-04-09T11:19:29.75 8.24
2025-04-09T11:19:30.75 8.23
2025-04-09T11:19:31.75 8.25
2025-04-09T11:19:32.75 8.24
2025-04-09T11:19:33.75 8.24
2025-04-09T11:19:34.75 8.23
2025-04-09T11:19:35.75 8.24
2025-04-09T11:19:36.75 8.23
2025-04-09T11:19:37.75 8.23
2025-04-09T11:19:38.75 8.23
2025-04-09T11:19:39.75 8.25
2025-04-09T11:19:40.75 8.22
2025-04-09T11:19:41.75 8.23
2025-04-09T11:19:42.75 8.24
2025-04-09T11:19:43.75 8.25
2025-04-09T11:19:44.75 8.23
2025-04-09T11:19:45.75 8.23
2025-04-09T11:19:46.75 8.23
2025-04-09T11:19:47.75 8.23
2025-04-09T11:19:48.75 8.24
2025-04-09T11:19:49.75 8.23
2025-04-09T11:19:50.75 8.23
2025-04-09T11:19:51.75 8.25
2025-04-09T11:19:52.75 8.23
2025-04-09T11:19:53.75 8.25
2025-04-09T11:19:54.75 8.24
2025-04-09T11:19:55.75 8.24
2025-04-09T11:19:56.75 8.22
2025-04-09T11:19:57.75 8.23
2025-04-09T11:19:58.75 8.23
2025-04-09T11:19:59.75 8.23
2025-04-09T11:20:00.75 8.23
2025-04-09T11:20:01.75 8.23
2025-04-09T11:20:02.75 8.23
2025-04-09T11:20:03.75 8.25
2025-04-09T11:20:04.75 8.22
2025-04-09T11:20:05.75 8.23
2025-04-09T11:20:06.75 8.21
2025-04-09T11:20:07.75 8.24
2025-04-09T11:20:08.75 8.25
2025-04-09T11:20:09.75 8.24
2025-04-09T11:20:10.75 8.25
2025-04-09T11:20:11.75 8.22
2025-04-09T11:20:12.75 8.23
2025-04-09T11:20:13.75 8.23
2025-04-09T11:20:14.75 8.23
2025-04-09T11:20:15.75 8.23
2025-04-09T11:20:16.75 8.21
2025-04-09T11:20:17.75 8.24
2025-04-09T11:20:18.75 8.22
2025-04-09T11:20:19.75 8.23
2025-04-09T11:20:20.75 8.22
2025-04-09T11:20:21.75 8.25
2025-04-09T11:20:22.75 8.23
2025-04-09T11:20:23.75 8.23
2025-04-09T11:20:24.75 8.23
2025-04-09T11:20:25.75 8.22
2025-04-09T11:20:26.75 8.23
2025-04-09T11:20:27.75 8.19
2025-04-09T11:20:28.75 8.24
2025-04-09T11:20:29.75 8.22
2025-04-09T11:20:30.75 8.23
2025-04-09T11:20:31.75 8.25
2025-04-09T11:20:32.75 8.21
2025-04-09T11:20:33.75 8.23
2025-04-09T11:20:34.75 8.23
2025-04-09T11:20:35.75 8.24
2025-04-09T11:20:36.75 8.21
2025-04-09T11:20:37.75 8.22
2025-04-09T11:20:38.75 8.21
2025-04-09T11:20:39.75 8.23
2025-04-09T11:20:40.75 8.23
2025-04-09T11:20:41.75 8.23
2025-04-09T11:20:42.75 8.23
2025-04-09T11:20:43.75 8.22
2025-04-09T11:20:44.75 8.22
2025-04-09T11:20:45.75 8.24
2025-04-09T11:20:46.75 8.22
2025-04-09T11:20:47.75 8.24
2025-04-09T11:20:48.75 8.25
2025-04-09T11:20:49.75 8.25
2025-04-09T11:20:50.75 8.24
2025-04-09T11:20:51.75 8.25
2025-04-09T11:20:52.75 8.25
2025-04-09T11:20:53.75 8.25
2025-04-09T11:20:54.75 8.22
2025-04-09T11:20:55.75 8.22
2025-04-09T11:20:56.75 8.21
2025-04-09T11:20:57.75 8.24
2025-04-09T11:20:58.75 8.23
2025-04-09T11:20:59.75 8.23
2025-04-09T11:21:00.75 8.23
2025-04-09T11:21:01.75 8.23
2025-04-09T11:21:02.75 8.22
2025-04-09T11:21:03.75 8.23
2025-04-09T11:21:04.75 8.25
2025-04-09T11:21:05.75 8.23
2025-04-09T11:21:06.75 8.23
2025-04-09T11:21:07.75 8.22
2025-04-09T11:21:08.75 8.23
2025-04-09T11:21:09.75 8.22
2025-04-09T11:21:10.75 8.23
2025-04-09T11:21:11.75 8.22
2025-04-09T11:21:12.75 8.23
2025-04-09T11:21:13.75 8.23
2025-04-09T11:21:14.75 8.24
2025-04-09T11:21:15.75 8.25
2025-04-09T11:21:16.75 8.22
2025-04-09T11:21:17.75 8.21
2025-04-09T11:21:18.75 8.23
2025-04-09T11:21:19.75 8.23
2025-04-09T11:21:20.75 8.25
2025-04-09T11:21:21.75 8.23
2025-04-09T11:21:22.75 8.25
2025-04-09T11:21:23.75 8.25
2025-04-09T11:21:24.75 8.23
2025-04-09T11:21:25.75 8.23
2025-04-09T11:21:26.75 8.22
2025-04-09T11:21:27.75 8.22
2025-04-09T11:21:28.75 8.23
2025-04-09T11:21:29.75 8.24
2025-04-09T11:21:30.75 8.24
2025-04-09T11:21:31.75 8.20
2025-04-09T11:21:32.75 8.24
2025-04-09T11:21:33.75 8.23
2025-04-09T11:21:34.75 8.23
2025-04-09T11:21:35.75 8.21
2025-04-09T11:21:36.75 8.24
2025-04-09T11:21:37.75 8.23
2025-04-09T11:21:38.75 8.25
2025-04-09T11:21:39.75 8.25
2025-04-09T11:21:40.75 8.23
2025-04-09T11:21:41.75 8.23
2025-04-09T11:21:42.75 8.25
2025-04-09T11:21:43.75 8.23
2025-04-09T11:21:44.75 8.23
2025-04-09T11:21:45.75 8.24
2025-04-09T11:21:46.75 8.23
2025-04-09T11:21:47.75 8.21
2025-04-09T11:21:48.75 8.25
2025-04-09T11:21:49.75 8.24
2025-04-09T11:21:50.75 8.23
2025-04-09T11:21:51.75 8.23
2025-04-09T11:21:52.75 8.21
2025-04-09T11:21:53.75 8.23
2025-04-09T11:21:54.75 8.23
2025-04-09T11:21:55.75 8.25
2025-04-09T11:21:56.75 8.23
2025-04-09T11:21:57.75 8.24
2025-04-09T11:21:58.75 8.24
2025-04-09T11:21:59.75 8.24
2025-04-09T11:22:00.75 8.23
2025-04-09T11:22:01.75 8.23
2025-04-09T11:22:02.75 8.23
2025-04-09T11:22:03.75 8.20
2025-04-09T11:22:04.75 8.25
2025-04-09T11:22:05.75 8.22
2025-04-09T11:22:06.75 8.22
2025-04-09T11:22:07.75 8.25
2025-04-09T11:22:08.75 8.24
2025-04-09T11:22:09.75 8.23
2025-04-09T11:22:10.75 8.23
2025-04-09T11:22:11.75 8.25
2025-04-09T11:22:12.75 8.25
2025-04-09T11:22:13.75 8.25
2025-04-09T11:22:14.75 8.25
2025-04-09T11:22:15.75 8.23
2025-04-09T11:22:16.75 8.20
2025-04-09T11:22:17.75 8.25
2025-04-09T11:22:18.75 8.26
2025-04-09T11:22:19.75 8.24
2025-04-09T11:22:20.75 8.23
2025-04-09T11:22:21.75 8.25
2025-04-09T11:22:22.75 8.26
2025-04-09T11:22:23.75 8.25
2025-04-09T11:22:24.75 8.25
2025-04-09T11:22:25.75 8.25
2025-04-09T11:22:26.75 8.25
2025-04-09T11:22:27.75 8.26
2025-04-09T11:22:28.75 8.26
2025-04-09T11:22:29.75 8.25
2025-04-09T11:22:30.75 8.23
2025-04-09T11:22:31.75 8.24
2025-04-09T11:22:32.75 8.23
2025-04-09T11:22:33.75 8.24
2025-04-09T11:22:34.75 8.22
2025-04-09T11:22:35.75 8.23
2025-04-09T11:22:36.75 8.24
2025-04-09T11:22:37.75 8.23
2025-04-09T11:22:38.75 8.25
2025-04-09T11:22:39.75 8.24
2025-04-09T11:22:40.75 8.21
2025-04-09T11:22:41.75 8.23
2025-04-09T11:22:42.75 8.21
2025-04-09T11:22:43.75 8.23
2025-04-09T11:22:44.75 8.23
2025-04-09T11:22:45.75 8.22
2025-04-09T11:22:46.75 8.23
2025-04-09T11:22:47.75 8.22
2025-04-09T11:22:48.75 8.23
2025-04-09T11:22:49.75 8.25
2025-04-09T11:22:50.75 8.25
2025-04-09T11:22:51.75 8.23
2025-04-09T11:22:52.75 8.23
2025-04-09T11:22:53.75 8.26
2025-04-09T11:22:54.75 8.24
2025-04-09T11:22:55.75 8.22
2025-04-09T11:22:56.75 8.23
2025-04-09T11:22:57.75 8.23
2025-04-09T11:22:58.75 8.25
2025-04-09T11:22:59.75 8.22
2025-04-09T11:23:00.75 8.23
2025-04-09T11:23:01.75 8.25
2025-04-09T11:23:02.75 8.24
2025-04-09T11:23:03.75 8.23
2025-04-09T11:23:04.75 8.22
2025-04-09T11:23:05.75 8.23
2025-04-09T11:23:06.75 8.21
2025-04-09T11:23:07.75 8.23
2025-04-09T11:23:08.75 8.23
2025-04-09T11:23:09.75 8.24
2025-04-09T11:23:10.75 8.23
2025-04-09T11:23:11.75 8.25
2025-04-09T11:23:12.75 8.21
2025-04-09T11:23:13.75 8.22
2025-04-09T11:23:14.75 8.21
2025-04-09T11:23:15.75 8.25
2025-04-09T11:23:16.75 8.23
2025-04-09T11:23:17.75 8.23
2025-04-09T11:23:18.75 8.23
2025-04-09T11:23:19.75 8.24
2025-04-09T11:23:20.75 8.25
2025-04-09T11:23:21.75 8.25
2025-04-09T11:23:22.75 8.23
2025-04-09T11:23:23.75 8.23
2025-04-09T11:23:24.75 8.25
2025-04-09T11:23:25.75 8.25
2025-04-09T11:23:26.75 8.23
2025-04-09T11:23:27.75 8.23
2025-04-09T11:23:28.75 8.25
2025-04-09T11:23:29.75 8.25
2025-04-09T11:23:30.76 8.23
2025-04-09T11:23:31.76 8.23
2025-04-09T11:23:32.76 8.23
2025-04-09T11:23:33.76 8.23
2025-04-09T11:23:34.76 8.23
2025-04-09T11:23:35.76 8.23
2025-04-09T11:23:36.76 8.23
2025-04-09T11:23:37.76 8.26
2025-04-09T11:23:38.76 8.24
2025-04-09T11:23:39.76 8.23
2025-04-09T11:23:40.76 8.23
2025-04-09T11:23:41.76 8.23
2025-04-09T11:23:42.76 8.24
2025-04-09T11:23:43.76 8.25
2025-04-09T11:23:44.76 8.25
2025-04-09T11:23:45.76 8.22
2025-04-09T11:23:46.76 8.24
2025-04-09T11:23:47.76 8.23
2025-04-09T11:23:48.76 8.24
2025-04-09T11:23:49.76 8.25
2025-04-09T11:23:50.76 8.24
2025-04-09T11:23:51.76 8.23
2025-04-09T11:23:52.76 8.25
2025-04-09T11:23:53.76 8.25
2025-04-09T11:23:54.76 8.23
2025-04-09T11:23:55.76 8.23
2025-04-09T11:23:56.76 8.23
2025-04-09T11:23:57.76 8.22
2025-04-09T11:23:58.76 8.23
2025-04-09T11:23:59.76 8.23
2025-04-09T11:24:00.76 8.21
2025-04-09T11:24:01.76 8.24
2025-04-09T11:24:02.76 8.23
2025-04-09T11:24:03.76 8.23
2025-04-09T11:24:04.76 8.23
2025-04-09T11:24:05.76 8.21
2025-04-09T11:24:06.76 8.23
2025-04-09T11:24:07.76 8.26
2025-04-09T11:24:08.76 8.24
2025-04-09T11:24:09.76 8.25
2025-04-09T11:24:10.76 8.22
2025-04-09T11:24:11.76 8.24
2025-04-09T11:24:12.76 8.24
2025-04-09T11:24:13.76 8.22
2025-04-09T11:24:14.76 8.23
2025-04-09T11:24:15.76 8.22
2025-04-09T11:24:16.76 8.22
2025-04-09T11:24:17.76 8.25
2025-04-09T11:24:18.76 8.23
2025-04-09T11:24:19.76 8.23
2025-04-09T11:24:20.76 8.23
2025-04-09T11:24:21.76 8.25
2025-04-09T11:24:22.76 8.18
2025-04-09T11:24:23.76 8.24
2025-04-09T11:24:24.76 8.23
2025-04-09T11:24:25.76 8.22
2025-04-09T11:24:26.76 8.21
2025-04-09T11:24:27.76 8.19
2025-04-09T11:24:28.76 8.22
2025-04-09T11:24:29.76 8.21
2025-04-09T11:24:30.76 8.23
2025-04-09T11:24:31.76 8.22
2025-04-09T11:24:32.76 8.21
2025-04-09T11:24:33.76 8.21
2025-04-09T11:24:34.76 8.21
2025-04-09T11:24:35.76 8.25
2025-04-09T11:24:36.76 8.22
2025-04-09T11:24:37.76 8.22
2025-04-09T11:24:38.76 8.23
2025-04-09T11:24:39.76 8.23
2025-04-09T11:24:40.76 8.22
2025-04-09T11:24:41.76 8.25
2025-04-09T11:24:42.76 8.21
2025-04-09T11:24:43.76 8.22
2025-04-09T11:24:44.76 8.23
2025-04-09T11:24:45.76 8.23
2025-04-09T11:24:46.76 8.22
2025-04-09T11:24:47.76 8.21
2025-04-09T11:24:48.76 8.22
2025-04-09T11:24:49.76 8.23
2025-04-09T11:24:50.76 8.23
2025-04-09T11:24:51.76 8.23
2025-04-09T11:24:52.76 8.21
2025-04-09T11:24:53.76 8.22
2025-04-09T11:24:54.76 8.21
2025-04-09T11:24:55.76 8.24
2025-04-09T11:24:56.76 8.21
2025-04-09T11:24:57.76 8.23
2025-04-09T11:24:58.76 8.22
2025-04-09T11:24:59.76 8.25
2025-04-09T11:25:00.76 8.22
2025-04-09T11:25:01.76 8.26
2025-04-09T11:25:02.76 8.21
2025-04-09T11:25:03.76 8.25
2025-04-09T11:25:04.76 8.23
2025-04-09T11:25:05.76 8.23
2025-04-09T11:25:06.76 8.24
2025-04-09T11:25:07.76 8.24
2025-04-09T11:25:08.76 8.25
2025-04-09T11:25:09.76 8.25
2025-04-09T11:25:10.76 8.23
2025-04-09T11:25:11.76 8.23
2025-04-09T11:25:12.76 8.24
2025-04-09T11:25:13.76 8.25
2025-04-09T11:25:14.76 8.23
2025-04-09T11:25:15.76 8.24
2025-04-09T11:25:16.76 8.23
2025-04-09T11:25:17.76 8.23
2025-04-09T11:25:18.76 8.25
2025-04-09T11:25:19.76 8.23
2025-04-09T11:25:20.76 8.22
2025-04-09T11:25:21.76 8.23
2025-04-09T11:25:22.76 8.24
2025-04-09T11:25:23.76 8.23
2025-04-09T11:25:24.76 8.24
2025-04-09T11:25:25.76 8.25
2025-04-09T11:25:26.76 8.23
2025-04-09T11:25:27.76 8.25
2025-04-09T11:25:28.76 8.25
2025-04-09T11:25:29.76 8.22
2025-04-09T11:25:30.76 8.24
2025-04-09T11:25:31.76 8.26
2025-04-09T11:25:32.76 8.22
2025-04-09T11:25:33.76 8.23
2025-04-09T11:25:34.76 8.21
2025-04-09T11:25:35.76 8.24
2025-04-09T11:25:36.76 8.23
2025-04-09T11:25:37.76 8.24
2025-04-09T11:25:38.76 8.23
2025-04-09T11:25:39.76 8.21
2025-04-09T11:25:40.76 8.23
2025-04-09T11:25:41.76 8.24
2025-04-09T11:25:42.76 8.23
2025-04-09T11:25:43.76 8.23
2025-04-09T11:25:44.76 8.21
2025-04-09T11:25:45.76 8.23
2025-04-09T11:25:46.76 8.22
2025-04-09T11:25:47.76 8.21
2025-04-09T11:25:48.76 8.22
2025-04-09T11:25:49.76 8.25
2025-04-09T11:25:50.76 8.22
2025-04-09T11:25:51.76 8.22
2025-04-09T11:25:52.76 8.21
2025-04-09T11:25:53.76 8.23
2025-04-09T11:25:54.76 8.24
2025-04-09T11:25:55.76 8.24
2025-04-09T11:25:56.76 8.25
2025-04-09T11:25:57.76 8.23
2025-04-09T11:25:58.76 8.21
2025-04-09T11:25:59.76 8.23
2025-04-09T11:26:00.76 8.22
2025-04-09T11:26:01.76 8.24
2025-04-09T11:26:02.76 8.22
2025-04-09T11:26:03.76 8.21
2025-04-09T11:26:04.76 8.22
2025-04-09T11:26:05.76 8.24
2025-04-09T11:26:06.76 8.23
2025-04-09T11:26:07.76 8.23
2025-04-09T11:26:08.76 8.23
2025-04-09T11:26:09.76 8.22
2025-04-09T11:26:10.76 8.23
2025-04-09T11:26:11.76 8.22
2025-04-09T11:26:12.76 8.21
2025-04-09T11:26:13.76 8.23
2025-04-09T11:26:14.76 8.23
2025-04-09T11:26:15.76 8.23
2025-04-09T11:26:16.76 8.24
2025-04-09T11:26:17.76 8.25
2025-04-09T11:26:18.76 8.23
2025-04-09T11:26:19.76 8.22
2025-04-09T11:26:20.76 8.23
2025-04-09T11:26:21.76 8.21
2025-04-09T11:26:22.76 8.23
2025-04-09T11:26:23.76 8.24
2025-04-09T11:26:24.76 8.22
2025-04-09T11:26:25.76 8.25
2025-04-09T11:26:26.76 8.25
2025-04-09T11:26:27.76 8.23
2025-04-09T11:26:28.76 8.23
2025-04-09T11:26:29.76 8.23
2025-04-09T11:26:30.76 8.23
2025-04-09T11:26:31.76 8.23
2025-04-09T11:26:32.76 8.25
2025-04-09T11:26:33.76 8.24
2025-04-09T11:26:34.76 8.25
2025-04-09T11:26:35.76 8.26
2025-04-09T11:26:36.76 8.25
2025-04-09T11:26:37.76 8.25
2025-04-09T11:26:38.76 8.20
2025-04-09T11:26:39.76 8.22
2025-04-09T11:26:40.76 8.23
2025-04-09T11:26:41.76 8.23
2025-04-09T11:26:42.76 8.23
2025-04-09T11:26:43.76 8.21
2025-04-09T11:26:44.76 8.25
2025-04-09T11:26:45.76 8.22
2025-04-09T11:26:46.76 8.23
2025-04-09T11:26:47.76 8.25
2025-04-09T11:26:48.76 8.23
2025-04-09T11:26:49.76 8.24
2025-04-09T11:26:50.76 8.23
2025-04-09T11:26:51.76 8.22
2025-04-09T11:26:52.76 8.25
2025-04-09T11:26:53.76 8.22
2025-04-09T11:26:54.76 8.23
2025-04-09T11:26:55.76 8.23
2025-04-09T11:26:56.76 8.23
2025-04-09T11:26:57.76 8.23
2025-04-09T11:26:58.76 8.23
2025-04-09T11:26:59.76 8.23
2025-04-09T11:27:00.76 8.23
2025-04-09T11:27:01.76 8.21
2025-04-09T11:27:02.76 8.25
2025-04-09T11:27:03.76 8.24
2025-04-09T11:27:04.76 8.24
2025-04-09T11:27:05.76 8.25
2025-04-09T11:27:06.76 8.24
2025-04-09T11:27:07.76 8.22
2025-04-09T11:27:08.76 8.23
2025-04-09T11:27:09.76 8.24
2025-04-09T11:27:10.76 8.23
2025-04-09T11:27:11.76 8.23
2025-04-09T11:27:12.76 8.24
2025-04-09T11:27:13.76 8.21
2025-04-09T11:27:14.76 8.23
2025-04-09T11:27:15.76 8.22
2025-04-09T11:27:16.76 8.22
2025-04-09T11:27:17.76 8.23
2025-04-09T11:27:18.76 8.25
2025-04-09T11:27:19.76 8.25
2025-04-09T11:27:20.76 8.23
2025-04-09T11:27:21.76 8.24
2025-04-09T11:27:22.76 8.21
2025-04-09T11:27:23.76 8.25
2025-04-09T11:27:24.76 8.24
2025-04-09T11:27:25.76 8.24
2025-04-09T11:27:26.76 8.22
2025-04-09T11:27:27.76 8.21
2025-04-09T11:27:28.76 8.20
2025-04-09T11:27:29.76 8.23
2025-04-09T11:27:30.76 8.21
2025-04-09T11:27:31.76 8.24
2025-04-09T11:27:32.76 8.23
2025-04-09T11:27:33.76 8.26
2025-04-09T11:27:34.76 8.24
2025-04-09T11:27:35.76 8.25
2025-04-09T11:27:36.76 8.24
2025-04-09T11:27:37.76 8.23
2025-04-09T11:27:38.76 8.23
2025-04-09T11:27:39.76 8.23
2025-04-09T11:27:40.76 8.23
2025-04-09T11:27:41.76 8.23
2025-04-09T11:27:42.76 8.23
2025-04-09T11:27:43.76 8.24
2025-04-09T11:27:44.76 8.23
2025-04-09T11:27:45.76 8.23
2025-04-09T11:27:46.76 8.23
2025-04-09T11:27:47.76 8.23
2025-04-09T11:27:48.76 8.23
2025-04-09T11:27:49.76 8.20
2025-04-09T11:27:50.76 8.25
2025-04-09T11:27:51.76 8.23
2025-04-09T11:27:52.76 8.22
2025-04-09T11:27:53.76 8.21
2025-04-09T11:27:54.76 8.22
2025-04-09T11:27:55.76 8.21
2025-04-09T11:27:56.76 8.26
2025-04-09T11:27:57.76 8.23
2025-04-09T11:27:58.76 8.22
2025-04-09T11:27:59.76 8.23
2025-04-09T11:28:00.76 8.23
2025-04-09T11:28:01.76 8.26
2025-04-09T11:28:02.76 8.21
2025-04-09T11:28:03.76 8.24
2025-04-09T11:28:04.76 8.25
2025-04-09T11:28:05.76 8.23
2025-04-09T11:28:06.76 8.24
2025-04-09T11:28:07.76 8.24
2025-04-09T11:28:08.76 8.24
2025-04-09T11:28:09.76 8.25
2025-04-09T11:28:10.76 8.22
2025-04-09T11:28:11.76 8.22
2025-04-09T11:28:12.76 8.22
2025-04-09T11:28:13.76 8.23
2025-04-09T11:28:14.76 8.22
2025-04-09T11:28:15.76 8.23
2025-04-09T11:28:16.76 8.24
2025-04-09T11:28:17.76 8.23
2025-04-09T11:28:18.76 8.21
2025-04-09T11:28:19.76 8.24
2025-04-09T11:28:20.76 8.24
2025-04-09T11:28:21.76 8.23
2025-04-09T11:28:22.76 8.23
2025-04-09T11:28:23.76 8.24
2025-04-09T11:28:24.76 8.23
2025-04-09T11:28:25.76 8.23
2025-04-09T11:28:26.76 8.24
2025-04-09T11:28:27.76 8.22
2025-04-09T11:28:28.76 8.26
2025-04-09T11:28:29.76 8.23
2025-04-09T11:28:30.76 8.25
2025-04-09T11:28:31.76 8.23
2025-04-09T11:28:32.76 8.21
2025-04-09T11:28:33.76 8.25
2025-04-09T11:28:34.76 8.24
2025-04-09T11:28:35.76 8.22
2025-04-09T11:28:36.76 8.22
2025-04-09T11:28:37.76 8.21
2025-04-09T11:28:38.76 8.23
2025-04-09T11:28:39.76 8.25
2025-04-09T11:28:40.76 8.24
2025-04-09T11:28:41.76 8.21
2025-04-09T11:28:42.76 8.22
2025-04-09T11:28:43.76 8.23
2025-04-09T11:28:44.76 8.23
2025-04-09T11:28:45.76 8.23
2025-04-09T11:28:46.76 8.24
2025-04-09T11:28:47.76 8.22
2025-04-09T11:28:48.76 8.23
2025-04-09T11:28:49.77 8.23
2025-04-09T11:28:50.77 8.25
2025-04-09T11:28:51.77 8.23
2025-04-09T11:28:52.77 8.22
2025-04-09T11:28:53.77 8.25
2025-04-09T11:28:54.77 8.25
2025-04-09T11:28:55.77 8.23
2025-04-09T11:28:56.77 8.23
2025-04-09T11:28:57.77 8.24
2025-04-09T11:28:58.77 8.22
2025-04-09T11:28:59.77 8.21
2025-04-09T11:29:00.77 8.21
2025-04-09T11:29:01.77 8.25
2025-04-09T11:29:02.77 8.23
2025-04-09T11:29:03.77 8.22
2025-04-09T11:29:04.77 8.23
2025-04-09T11:29:05.77 8.23
2025-04-09T11:29:06.77 8.21
2025-04-09T11:29:07.77 8.24
2025-04-09T11:29:08.77 8.21
2025-04-09T11:29:09.77 8.23
2025-04-09T11:29:10.77 8.25
2025-04-09T11:29:11.77 8.21
2025-04-09T11:29:12.77 8.22
2025-04-09T11:29:13.77 8.22
2025-04-09T11:29:14.77 8.22
2025-04-09T11:29:15.77 8.21
2025-04-09T11:29:16.77 8.24
2025-04-09T11:29:17.77 8.23
2025-04-09T11:29:18.77 8.21
2025-04-09T11:29:19.77 8.25
2025-04-09T11:29:20.77 8.23
2025-04-09T11:29:21.77 8.23
2025-04-09T11:29:22.77 8.22
2025-04-09T11:29:23.77 8.23
2025-04-09T11:29:24.77 8.24
2025-04-09T11:29:25.77 8.24
2025-04-09T11:29:26.77 8.23
2025-04-09T11:29:27.77 8.22
2025-04-09T11:29:28.77 8.22
2025-04-09T11:29:29.77 8.23
2025-04-09T11:29:30.77 8.25
2025-04-09T11:29:31.77 8.22
2025-04-09T11:29:32.77 8.24
2025-04-09T11:29:33.77 8.22
2025-04-09T11:29:34.77 8.23
2025-04-09T11:29:35.77 8.23
2025-04-09T11:29:36.77 8.23
2025-04-09T11:29:37.77 8.23
2025-04-09T11:29:38.77 8.25
2025-04-09T11:29:39.77 8.24
2025-04-09T11:29:40.77 8.23
2025-04-09T11:29:41.77 8.24
2025-04-09T11:29:42.77 8.22
2025-04-09T11:29:43.77 8.23
2025-04-09T11:29:44.77 8.24
2025-04-09T11:29:45.77 8.25
2025-04-09T11:29:46.77 8.24
2025-04-09T11:29:47.77 8.23
2025-04-09T11:29:48.77 8.23
2025-04-09T11:29:49.77 8.24
2025-04-09T11:29:50.77 8.23
2025-04-09T11:29:51.77 8.21
2025-04-09T11:29:52.77 8.21
2025-04-09T11:29:53.77 8.21
2025-04-09T11:29:54.77 8.23
2025-04-09T11:29:55.77 8.23
2025-04-09T11:29:56.77 8.22
2025-04-09T11:29:57.77 8.23
2025-04-09T11:29:58.77 8.24
2025-04-09T11:29:59.77 8.23
2025-04-09T11:30:00.77 8.25
2025-04-09T11:30:01.77 8.23
2025-04-09T11:30:02.77 8.22
2025-04-09T11:30:03.77 8.23
2025-04-09T11:30:04.77 8.24
2025-04-09T11:30:05.77 8.26
2025-04-09T11:30:06.77 8.24
2025-04-09T11:30:07.77 8.23
2025-04-09T11:30:08.77 8.23
2025-04-09T11:30:09.77 8.25
2025-04-09T11:30:10.77 8.23
2025-04-09T11:30:11.77 8.23
2025-04-09T11:30:12.77 8.24
2025-04-09T11:30:13.77 8.23
2025-04-09T11:30:14.77 8.25
2025-04-09T11:30:15.77 8.22
2025-04-09T11:30:16.77 8.21
2025-04-09T11:30:17.77 8.23
2025-04-09T11:30:18.77 8.24
2025-04-09T11:30:19.77 8.23
2025-04-09T11:30:20.77 8.22
2025-04-09T11:30:21.77 8.22
2025-04-09T11:30:22.77 8.22
2025-04-09T11:30:23.77 8.22
2025-04-09T11:30:24.77 8.23
2025-04-09T11:30:25.77 8.21
2025-04-09T11:30:26.77 8.22
2025-04-09T11:30:27.77 8.26
2025-04-09T11:30:28.77 8.22
2025-04-09T11:30:29.77 8.23
2025-04-09T11:30:30.77 8.24
2025-04-09T11:30:31.77 8.23
2025-04-09T11:30:32.77 8.23
2025-04-09T11:30:33.77 8.21
2025-04-09T11:30:34.77 8.22
2025-04-09T11:30:35.77 8.24
2025-04-09T11:30:36.77 8.21
2025-04-09T11:30:37.77 8.22
2025-04-09T11:30:38.77 8.22
2025-04-09T11:30:39.77 8.23
2025-04-09T11:30:40.77 8.21
2025-04-09T11:30:41.77 8.22
2025-04-09T11:30:42.77 8.23
2025-04-09T11:30:43.77 8.23
2025-04-09T11:30:44.77 8.23
2025-04-09T11:30:45.77 8.23
2025-04-09T11:30:46.77 8.21
2025-04-09T11:30:47.77 8.24
2025-04-09T11:30:48.77 8.26
2025-04-09T11:30:49.77 8.25
2025-04-09T11:30:50.77 8.22
2025-04-09T11:30:51.77 8.24
2025-04-09T11:30:52.77 8.23
2025-04-09T11:30:53.77 8.23
2025-04-09T11:30:54.77 8.21
2025-04-09T11:30:55.77 8.23
2025-04-09T11:30:56.77 8.23
2025-04-09T11:30:57.77 8.24
2025-04-09T11:30:58.77 8.28
2025-04-09T11:30:59.77 8.24
2025-04-09T11:31:00.77 8.23
2025-04-09T11:31:01.77 8.23
2025-04-09T11:31:02.77 8.24
2025-04-09T11:31:03.77 8.24
2025-04-09T11:31:04.77 8.24
2025-04-09T11:31:05.77 8.22
2025-04-09T11:31:06.77 8.24
2025-04-09T11:31:07.77 8.24
2025-04-09T11:31:08.77 8.22
2025-04-09T11:31:09.77 8.23
2025-04-09T11:31:10.77 8.23
2025-04-09T11:31:11.77 8.22
2025-04-09T11:31:12.77 8.23
2025-04-09T11:31:13.77 8.24
2025-04-09T11:31:14.77 8.22
2025-04-09T11:31:15.77 8.25
2025-04-09T11:31:16.77 8.23
2025-04-09T11:31:17.77 8.22
2025-04-09T11:31:18.77 8.22
2025-04-09T11:31:19.77 8.25
2025-04-09T11:31:20.77 8.24
2025-04-09T11:31:21.77 8.21
2025-04-09T11:31:22.77 8.23
2025-04-09T11:31:23.77 8.23
2025-04-09T11:31:24.77 8.23
2025-04-09T11:31:25.77 8.25
2025-04-09T11:31:26.77 8.23
2025-04-09T11:31:27.77 8.23
2025-04-09T11:31:28.77 8.23
2025-04-09T11:31:29.77 8.21
2025-04-09T11:31:30.77 8.24
2025-04-09T11:31:31.77 8.24
2025-04-09T11:31:32.77 8.24
2025-04-09T11:31:33.77 8.20
2025-04-09T11:31:34.77 8.23
2025-04-09T11:31:35.77 8.25
2025-04-09T11:31:36.77 8.24
2025-04-09T11:31:37.77 8.26
2025-04-09T11:31:38.77 8.23
2025-04-09T11:31:39.77 8.23
2025-04-09T11:31:40.77 8.22
2025-04-09T11:31:41.77 8.22
2025-04-09T11:31:42.77 8.24
2025-04-09T11:31:43.77 8.24
2025-04-09T11:31:44.77 8.23
2025-04-09T11:31:45.77 8.22
2025-04-09T11:31:46.77 8.21
2025-04-09T11:31:47.77 8.24
2025-04-09T11:31:48.77 8.22
2025-04-09T11:31:49.77 8.24
2025-04-09T11:31:50.77 8.22
2025-04-09T11:31:51.77 8.24
2025-04-09T11:31:52.77 8.24
2025-04-09T11:31:53.77 8.25
2025-04-09T11:31:54.77 8.23
2025-04-09T11:31:55.77 8.24
2025-04-09T11:31:56.77 8.25
2025-04-09T11:31:57.77 8.23
2025-04-09T11:31:58.77 8.23
2025-04-09T11:31:59.77 8.21
2025-04-09T11:32:00.77 8.24
2025-04-09T11:32:01.77 8.24
2025-04-09T11:32:02.77 8.23
2025-04-09T11:32:03.77 8.23
2025-04-09T11:32:04.77 8.23
2025-04-09T11:32:05.77 8.24
2025-04-09T11:32:06.78 8.22
2025-04-09T11:32:07.76 8.25
2025-04-09T11:32:08.76 8.23
2025-04-09T11:32:09.76 8.23
2025-04-09T11:32:10.76 8.22
2025-04-09T11:32:11.76 8.23
2025-04-09T11:32:12.76 8.23
2025-04-09T11:32:13.76 8.23
2025-04-09T11:32:14.76 8.21
2025-04-09T11:32:15.76 8.22
2025-04-09T11:32:16.76 8.21
2025-04-09T11:32:17.76 8.25
2025-04-09T11:32:18.76 8.23
2025-04-09T11:32:19.76 8.22
2025-04-09T11:32:20.76 8.23
2025-04-09T11:32:21.76 8.24
2025-04-09T11:32:22.76 8.23
2025-04-09T11:32:23.76 8.24
2025-04-09T11:32:24.76 8.23
2025-04-09T11:32:25.76 8.23
2025-04-09T11:32:26.76 8.24
2025-04-09T11:32:27.76 8.25
2025-04-09T11:32:28.76 8.21
2025-04-09T11:32:29.76 8.22
2025-04-09T11:32:30.76 8.26
2025-04-09T11:32:31.76 8.24
2025-04-09T11:32:32.76 8.23
2025-04-09T11:32:33.76 8.23
2025-04-09T11:32:34.76 8.23
2025-04-09T11:32:35.76 8.21
2025-04-09T11:32:36.76 8.24
2025-04-09T11:32:37.76 8.26
2025-04-09T11:32:38.76 8.25
2025-04-09T11:32:39.76 8.23
2025-04-09T11:32:40.76 8.22
2025-04-09T11:32:41.76 8.21
2025-04-09T11:32:42.76 8.23
2025-04-09T11:32:43.76 8.25
2025-04-09T11:32:44.76 8.25
2025-04-09T11:32:45.76 8.26
2025-04-09T11:32:46.76 8.23
2025-04-09T11:32:47.76 8.24
2025-04-09T11:32:48.76 8.22
2025-04-09T11:32:49.76 8.22
2025-04-09T11:32:50.76 8.21
2025-04-09T11:32:51.76 8.20
2025-04-09T11:32:52.76 8.22
2025-04-09T11:32:53.76 8.25
2025-04-09T11:32:54.76 8.24
2025-04-09T11:32:55.76 8.23
2025-04-09T11:32:56.76 8.22
2025-04-09T11:32:57.76 8.23
2025-04-09T11:32:58.76 8.23
2025-04-09T11:32:59.76 8.23
2025-04-09T11:33:00.76 8.24
2025-04-09T11:33:01.76 8.23
2025-04-09T11:33:02.76 8.23
2025-04-09T11:33:03.76 8.21
2025-04-09T11:33:04.76 8.22
2025-04-09T11:33:05.76 8.25
2025-04-09T11:33:06.76 8.26
2025-04-09T11:33:07.76 8.23
2025-04-09T11:33:08.76 8.23
2025-04-09T11:33:09.76 8.24
2025-04-09T11:33:10.76 8.22
2025-04-09T11:33:11.76 8.23
2025-04-09T11:33:12.76 8.23
2025-04-09T11:33:13.76 8.21
2025-04-09T11:33:14.76 8.21
2025-04-09T11:33:15.76 8.22
2025-04-09T11:33:16.76 8.21
2025-04-09T11:33:17.76 8.23
2025-04-09T11:33:18.76 8.22
2025-04-09T11:33:19.76 8.22
2025-04-09T11:33:20.76 8.19
2025-04-09T11:33:21.76 8.20
2025-04-09T11:33:22.76 8.23
2025-04-09T11:33:23.76 8.23
2025-04-09T11:33:24.76 8.23
2025-04-09T11:33:25.76 8.21
2025-04-09T11:33:26.76 8.23
2025-04-09T11:33:27.76 8.23
2025-04-09T11:33:28.76 8.22
2025-04-09T11:33:29.76 8.23
2025-04-09T11:33:30.76 8.23
2025-04-09T11:33:31.76 8.21
2025-04-09T11:33:32.76 8.25
2025-04-09T11:33:33.76 8.22
2025-04-09T11:33:34.76 8.22
2025-04-09T11:33:35.76 8.23
2025-04-09T11:33:36.76 8.23
2025-04-09T11:33:37.76 8.23
2025-04-09T11:33:38.76 8.24
2025-04-09T11:33:39.76 8.22
2025-04-09T11:33:40.76 8.21
2025-04-09T11:33:41.76 8.20
2025-04-09T11:33:42.76 8.23
2025-04-09T11:33:43.76 8.21
2025-04-09T11:33:44.76 8.26
2025-04-09T11:33:45.76 8.23
2025-04-09T11:33:46.76 8.22
2025-04-09T11:33:47.76 8.21
2025-04-09T11:33:48.76 8.25
2025-04-09T11:33:49.76 8.23
2025-04-09T11:33:50.76 8.22
2025-04-09T11:33:51.76 8.25
2025-04-09T11:33:52.76 8.21
2025-04-09T11:33:53.76 8.24
2025-04-09T11:33:54.76 8.25
2025-04-09T11:33:55.76 8.23
2025-04-09T11:33:56.76 8.23
2025-04-09T11:33:57.76 8.24
2025-04-09T11:33:58.76 8.21
2025-04-09T11:33:59.76 8.23
2025-04-09T11:34:00.76 8.25
2025-04-09T11:34:01.76 8.23
2025-04-09T11:34:02.76 8.21
2025-04-09T11:34:03.76 8.23
2025-04-09T11:34:04.76 8.23
2025-04-09T11:34:05.76 8.24
2025-04-09T11:34:06.76 8.23
2025-04-09T11:34:07.77 8.21
2025-04-09T11:34:08.77 8.21
2025-04-09T11:34:09.77 8.21
2025-04-09T11:34:10.77 8.23
2025-04-09T11:34:11.77 8.22
2025-04-09T11:34:12.77 8.21
2025-04-09T11:34:13.77 8.22
2025-04-09T11:34:14.77 8.21
2025-04-09T11:34:15.77 8.23
2025-04-09T11:34:16.77 8.23
2025-04-09T11:34:17.77 8.22
2025-04-09T11:34:18.77 8.23
2025-04-09T11:34:19.77 8.23
2025-04-09T11:34:20.77 8.23
2025-04-09T11:34:21.77 8.24
2025-04-09T11:34:22.77 8.22
2025-04-09T11:34:23.77 8.23
2025-04-09T11:34:24.77 8.21
2025-04-09T11:34:25.77 8.25
2025-04-09T11:34:26.77 8.22
2025-04-09T11:34:27.77 8.24
2025-04-09T11:34:28.77 8.23
2025-04-09T11:34:29.77 8.21
2025-04-09T11:34:30.77 8.23
2025-04-09T11:34:31.77 8.24
2025-04-09T11:34:32.77 8.25
2025-04-09T11:34:33.77 8.25
2025-04-09T11:34:34.77 8.23
2025-04-09T11:34:35.77 8.21
2025-04-09T11:34:36.77 8.21
2025-04-09T11:34:37.77 8.23
2025-04-09T11:34:38.77 8.23
2025-04-09T11:34:39.77 8.23
2025-04-09T11:34:40.77 8.23
2025-04-09T11:34:41.77 8.23
2025-04-09T11:34:42.77 8.25
2025-04-09T11:34:43.77 8.25
2025-04-09T11:34:44.77 8.21
2025-04-09T11:34:45.77 8.21
2025-04-09T11:34:46.77 8.20
2025-04-09T11:34:47.77 8.25
2025-04-09T11:34:48.77 8.21
2025-04-09T11:34:49.77 8.25
2025-04-09T11:34:50.77 8.23
2025-04-09T11:34:51.77 8.24
2025-04-09T11:34:52.77 8.21
2025-04-09T11:34:53.77 8.23
2025-04-09T11:34:54.77 8.23
2025-04-09T11:34:55.77 8.23
2025-04-09T11:34:56.77 8.22
2025-04-09T11:34:57.77 8.24
2025-04-09T11:34:58.77 8.21
2025-04-09T11:34:59.77 8.25
2025-04-09T11:35:00.77 8.21
2025-04-09T11:35:01.77 8.23
2025-04-09T11:35:02.77 8.24
2025-04-09T11:35:03.77 8.21
2025-04-09T11:35:04.77 8.22
2025-04-09T11:35:05.77 8.23
2025-04-09T11:35:06.77 8.23
2025-04-09T11:35:07.77 8.23
2025-04-09T11:35:08.77 8.23
2025-04-09T11:35:09.77 8.25
2025-04-09T11:35:10.77 8.23
2025-04-09T11:35:11.77 8.24
2025-04-09T11:35:12.77 8.23
2025-04-09T11:35:13.77 8.25
2025-04-09T11:35:14.77 8.23
2025-04-09T11:35:15.77 8.23
2025-04-09T11:35:16.77 8.25
2025-04-09T11:35:17.77 8.23
2025-04-09T11:35:18.77 8.25
2025-04-09T11:35:19.77 8.23
2025-04-09T11:35:20.77 8.22
2025-04-09T11:35:21.77 8.21
2025-04-09T11:35:22.77 8.22
2025-04-09T11:35:23.77 8.25
2025-04-09T11:35:24.77 8.21
2025-04-09T11:35:25.77 8.21
2025-04-09T11:35:26.77 8.24
2025-04-09T11:35:27.77 8.23
2025-04-09T11:35:28.77 8.23
2025-04-09T11:35:29.77 8.25
2025-04-09T11:35:30.77 8.21
2025-04-09T11:35:31.77 8.22
2025-04-09T11:35:32.77 8.25
2025-04-09T11:35:33.77 8.26
2025-04-09T11:35:34.77 8.21
2025-04-09T11:35:35.77 8.21
2025-04-09T11:35:36.77 8.23
2025-04-09T11:35:37.77 8.23
2025-04-09T11:35:38.77 8.24
2025-04-09T11:35:39.77 8.24
2025-04-09T11:35:40.77 8.23
2025-04-09T11:35:41.77 8.22
2025-04-09T11:35:42.77 8.24
2025-04-09T11:35:43.77 8.25
2025-04-09T11:35:44.77 8.21
2025-04-09T11:35:45.77 8.21
2025-04-09T11:35:46.77 8.21
2025-04-09T11:35:47.77 8.23
2025-04-09T11:35:48.77 8.21
2025-04-09T11:35:49.77 8.23
2025-04-09T11:35:50.77 8.22
2025-04-09T11:35:51.77 8.19
2025-04-09T11:35:52.77 8.24
2025-04-09T11:35:53.77 8.23
2025-04-09T11:35:54.77 8.21
2025-04-09T11:35:55.77 8.22
2025-04-09T11:35:56.77 8.23
2025-04-09T11:35:57.77 8.23
2025-04-09T11:35:58.78 8.24
2025-04-09T11:35:59.76 8.21
2025-04-09T11:36:00.76 8.23
2025-04-09T11:36:01.76 8.25
2025-04-09T11:36:02.76 8.22
2025-04-09T11:36:03.76 8.23
2025-04-09T11:36:04.76 8.23
2025-04-09T11:36:05.76 8.23
2025-04-09T11:36:06.76 8.23
2025-04-09T11:36:07.76 8.23
2025-04-09T11:36:08.76 8.24
2025-04-09T11:36:09.76 8.23
2025-04-09T11:36:10.76 8.25
2025-04-09T11:36:11.76 8.21
2025-04-09T11:36:12.76 8.24
2025-04-09T11:36:13.76 8.22
2025-04-09T11:36:14.76 8.23
2025-04-09T11:36:15.76 8.23
2025-04-09T11:36:16.76 8.24
2025-04-09T11:36:17.76 8.23
2025-04-09T11:36:18.76 8.25
2025-04-09T11:36:19.76 8.23
2025-04-09T11:36:20.76 8.22
2025-04-09T11:36:21.76 8.23
2025-04-09T11:36:22.76 8.23
2025-04-09T11:36:23.76 8.24
2025-04-09T11:36:24.76 8.19
2025-04-09T11:36:25.76 8.22
2025-04-09T11:36:26.76 8.22
2025-04-09T11:36:27.76 8.25
2025-04-09T11:36:28.76 8.23
2025-04-09T11:36:29.76 8.23
2025-04-09T11:36:30.76 8.23
2025-04-09T11:36:31.76 8.23
2025-04-09T11:36:32.76 8.22
2025-04-09T11:36:33.76 8.23
2025-04-09T11:36:34.76 8.24
2025-04-09T11:36:35.76 8.21
2025-04-09T11:36:36.76 8.25
2025-04-09T11:36:37.76 8.23
2025-04-09T11:36:38.76 8.21
2025-04-09T11:36:39.76 8.22
2025-04-09T11:36:40.76 8.21
2025-04-09T11:36:41.76 8.24
2025-04-09T11:36:42.76 8.23
2025-04-09T11:36:43.76 8.22
2025-04-09T11:36:44.76 8.22
2025-04-09T11:36:45.76 8.25
2025-04-09T11:36:46.76 8.23
2025-04-09T11:36:47.76 8.23
2025-04-09T11:36:48.76 8.23
2025-04-09T11:36:49.76 8.23
2025-04-09T11:36:50.76 8.23
2025-04-09T11:36:51.76 8.24
2025-04-09T11:36:52.76 8.23
2025-04-09T11:36:53.76 8.24
2025-04-09T11:36:54.76 8.26
2025-04-09T11:36:55.76 8.23
2025-04-09T11:36:56.76 8.24
2025-04-09T11:36:57.76 8.25
2025-04-09T11:36:58.76 8.23
2025-04-09T11:36:59.76 8.23
2025-04-09T11:37:00.76 8.22
2025-04-09T11:37:01.76 8.21
2025-04-09T11:37:02.76 8.21
2025-04-09T11:37:03.76 8.23
2025-04-09T11:37:04.76 8.25
2025-04-09T11:37:05.76 8.23
2025-04-09T11:37:06.76 8.23
2025-04-09T11:37:07.76 8.25
2025-04-09T11:37:08.76 8.26
2025-04-09T11:37:09.76 8.23
2025-04-09T11:37:10.76 8.23
2025-04-09T11:37:11.76 8.23
2025-04-09T11:37:12.76 8.21
2025-04-09T11:37:13.76 8.24
2025-04-09T11:37:14.76 8.24
2025-04-09T11:37:15.76 8.23
2025-04-09T11:37:16.76 8.25
2025-04-09T11:37:17.76 8.25
2025-04-09T11:37:18.76 8.25
2025-04-09T11:37:19.76 8.22
2025-04-09T11:37:20.76 8.23
2025-04-09T11:37:21.76 8.21
2025-04-09T11:37:22.76 8.21
2025-04-09T11:37:23.76 8.23
2025-04-09T11:37:24.76 8.24
2025-04-09T11:37:25.76 8.23
2025-04-09T11:37:26.76 8.23
2025-04-09T11:37:27.76 8.23
2025-04-09T11:37:28.76 8.24
2025-04-09T11:37:29.76 8.24
2025-04-09T11:37:30.76 8.23
2025-04-09T11:37:31.76 8.20
2025-04-09T11:37:32.76 8.23
2025-04-09T11:37:33.76 8.21
2025-04-09T11:37:34.76 8.21
2025-04-09T11:37:35.76 8.23
2025-04-09T11:37:36.76 8.21
2025-04-09T11:37:37.76 8.23
2025-04-09T11:37:38.76 8.23
2025-04-09T11:37:39.76 8.20
2025-04-09T11:37:40.76 8.22
2025-04-09T11:37:41.76 8.21
2025-04-09T11:37:42.76 8.23
2025-04-09T11:37:43.76 8.23
2025-04-09T11:37:44.76 8.21
2025-04-09T11:37:45.76 8.23
2025-04-09T11:37:46.76 8.23
2025-04-09T11:37:47.76 8.23
2025-04-09T11:37:48.76 8.24
2025-04-09T11:37:49.76 8.23
2025-04-09T11:37:50.76 8.23
2025-04-09T11:37:51.76 8.23
2025-04-09T11:37:52.76 8.22
2025-04-09T11:37:53.76 8.23
2025-04-09T11:37:54.76 8.20
2025-04-09T11:37:55.76 8.23
2025-04-09T11:37:56.76 8.22
2025-04-09T11:37:57.76 8.23
2025-04-09T11:37:58.76 8.26
2025-04-09T11:37:59.76 8.21
2025-04-09T11:38:00.76 8.21
2025-04-09T11:38:01.76 8.21
2025-04-09T11:38:02.76 8.21
2025-04-09T11:38:03.76 8.24
2025-04-09T11:38:04.76 8.23
2025-04-09T11:38:05.76 8.23
2025-04-09T11:38:06.76 8.24
2025-04-09T11:38:07.76 8.25
2025-04-09T11:38:08.76 8.24
2025-04-09T11:38:09.76 8.21
2025-04-09T11:38:10.76 8.24
2025-04-09T11:38:11.76 8.22
2025-04-09T11:38:12.76 8.21
2025-04-09T11:38:13.76 8.23
2025-04-09T11:38:14.76 8.25
2025-04-09T11:38:15.76 8.23
2025-04-09T11:38:16.76 8.23
2025-04-09T11:38:17.76 8.24
2025-04-09T11:38:18.76 8.23
2025-04-09T11:38:19.76 8.25
2025-04-09T11:38:20.76 8.23
2025-04-09T11:38:21.76 8.23
2025-04-09T11:38:22.76 8.24
2025-04-09T11:38:23.76 8.22
2025-04-09T11:38:24.76 8.21
2025-04-09T11:38:25.76 8.23
2025-04-09T11:38:26.76 8.23
2025-04-09T11:38:27.76 8.24
2025-04-09T11:38:28.76 8.22
2025-04-09T11:38:29.76 8.24
2025-04-09T11:38:30.76 8.23
2025-04-09T11:38:31.76 8.23
2025-04-09T11:38:32.76 8.22
2025-04-09T11:38:33.76 8.23
2025-04-09T11:38:34.76 8.24
2025-04-09T11:38:35.76 8.23
2025-04-09T11:38:36.76 8.22
2025-04-09T11:38:37.76 8.24
2025-04-09T11:38:38.76 8.22
2025-04-09T11:38:39.76 8.21
2025-04-09T11:38:40.76 8.23
2025-04-09T11:38:41.76 8.23
2025-04-09T11:38:42.76 8.23
2025-04-09T11:38:43.76 8.25
2025-04-09T11:38:44.76 8.21
2025-04-09T11:38:45.76 8.25
2025-04-09T11:38:46.76 8.23
2025-04-09T11:38:47.76 8.23
2025-04-09T11:38:48.76 8.23
2025-04-09T11:38:49.76 8.23
2025-04-09T11:38:50.76 8.23
2025-04-09T11:38:51.76 8.25
2025-04-09T11:38:52.76 8.24
2025-04-09T11:38:53.76 8.23
2025-04-09T11:38:54.76 8.23
2025-04-09T11:38:55.76 8.21
2025-04-09T11:38:56.76 8.22
2025-04-09T11:38:57.76 8.23
2025-04-09T11:38:58.76 8.21
2025-04-09T11:38:59.76 8.23
2025-04-09T11:39:00.76 8.21
2025-04-09T11:39:01.76 8.23
2025-04-09T11:39:02.76 8.25
2025-04-09T11:39:03.76 8.23
2025-04-09T11:39:04.76 8.20
2025-04-09T11:39:05.76 8.23
2025-04-09T11:39:06.76 8.22
2025-04-09T11:39:07.76 8.21
2025-04-09T11:39:08.76 8.23
2025-04-09T11:39:09.76 8.22
2025-04-09T11:39:10.76 8.23
2025-04-09T11:39:11.76 8.23
2025-04-09T11:39:12.76 8.21
2025-04-09T11:39:13.76 8.22
2025-04-09T11:39:14.76 8.25
2025-04-09T11:39:15.76 8.23
2025-04-09T11:39:16.76 8.23
2025-04-09T11:39:17.76 8.25
2025-04-09T11:39:18.76 8.24
2025-04-09T11:39:19.76 8.25
2025-04-09T11:39:20.77 8.23
2025-04-09T11:39:21.76 8.24
2025-04-09T11:39:22.76 8.23
2025-04-09T11:39:23.76 8.23
2025-04-09T11:39:24.76 8.24
2025-04-09T11:39:25.76 8.23
2025-04-09T11:39:26.77 8.25
2025-04-09T11:39:27.77 8.24
2025-04-09T11:39:28.77 8.25
2025-04-09T11:39:29.77 8.23
2025-04-09T11:39:30.77 8.22
2025-04-09T11:39:31.77 8.23
2025-04-09T11:39:32.77 8.23
2025-04-09T11:39:33.77 8.23
2025-04-09T11:39:34.77 8.23
2025-04-09T11:39:35.77 8.23
2025-04-09T11:39:36.77 8.23
2025-04-09T11:39:37.77 8.25
2025-04-09T11:39:38.77 8.23
2025-04-09T11:39:39.77 8.21
2025-04-09T11:39:40.77 8.26
2025-04-09T11:39:41.77 8.23
2025-04-09T11:39:42.77 8.22
2025-04-09T11:39:43.77 8.21
2025-04-09T11:39:44.77 8.23
2025-04-09T11:39:45.77 8.22
2025-04-09T11:39:46.77 8.25
2025-04-09T11:39:47.77 8.24
2025-04-09T11:39:48.77 8.23
2025-04-09T11:39:49.77 8.22
2025-04-09T11:39:50.78 8.22
2025-04-09T11:39:51.78 8.23
2025-04-09T11:39:52.78 8.23
2025-04-09T11:39:53.78 8.25
2025-04-09T11:39:54.78 8.24
2025-04-09T11:39:55.78 8.21
2025-04-09T11:39:56.78 8.21
2025-04-09T11:39:57.78 8.23
2025-04-09T11:39:58.78 8.21
2025-04-09T11:39:59.78 8.22
2025-04-09T11:40:00.78 8.22
2025-04-09T11:40:01.78 8.21
2025-04-09T11:40:02.78 8.24
2025-04-09T11:40:03.78 8.23
2025-04-09T11:40:04.78 8.23
2025-04-09T11:40:05.78 8.21
2025-04-09T11:40:06.78 8.23
2025-04-09T11:40:07.78 8.23
2025-04-09T11:40:08.78 8.25
2025-04-09T11:40:09.78 8.21
2025-04-09T11:40:10.78 8.22
2025-04-09T11:40:11.78 8.23
2025-04-09T11:40:12.78 8.23
2025-04-09T11:40:13.78 8.23
2025-04-09T11:40:14.78 8.25
2025-04-09T11:40:15.78 8.23
2025-04-09T11:40:16.78 8.25
2025-04-09T11:40:17.78 8.21
2025-04-09T11:40:18.78 8.23
2025-04-09T11:40:19.78 8.23
2025-04-09T11:40:20.78 8.21
2025-04-09T11:40:21.78 8.24
2025-04-09T11:40:22.78 8.23
2025-04-09T11:40:23.78 8.22
2025-04-09T11:40:24.78 8.23
2025-04-09T11:40:25.78 8.23
2025-04-09T11:40:26.78 8.21
2025-04-09T11:40:27.78 8.23
2025-04-09T11:40:28.78 8.24
2025-04-09T11:40:29.78 8.23
2025-04-09T11:40:30.78 8.23
2025-04-09T11:40:31.78 8.25
2025-04-09T11:40:32.78 8.22
2025-04-09T11:40:33.78 8.23
2025-04-09T11:40:34.78 8.25
2025-04-09T11:40:35.78 8.24
2025-04-09T11:40:36.78 8.23
2025-04-09T11:40:37.78 8.24
2025-04-09T11:40:38.78 8.23
2025-04-09T11:40:39.78 8.24
2025-04-09T11:40:40.78 8.21
2025-04-09T11:40:41.78 8.23
2025-04-09T11:40:42.78 8.24
2025-04-09T11:40:43.78 8.25
2025-04-09T11:40:44.78 8.26
2025-04-09T11:40:45.78 8.26
2025-04-09T11:40:46.78 8.21
2025-04-09T11:40:47.78 8.23
2025-04-09T11:40:48.78 8.21
2025-04-09T11:40:49.78 8.23
2025-04-09T11:40:50.78 8.24
2025-04-09T11:40:51.78 8.21
2025-04-09T11:40:52.78 8.25
2025-04-09T11:40:53.78 8.23
2025-04-09T11:40:54.78 8.23
2025-04-09T11:40:55.78 8.21
2025-04-09T11:40:56.78 8.23
2025-04-09T11:40:57.78 8.23
2025-04-09T11:40:58.78 8.22
2025-04-09T11:40:59.78 8.23
2025-04-09T11:41:00.78 8.22
2025-04-09T11:41:01.78 8.25
2025-04-09T11:41:02.78 8.24
2025-04-09T11:41:03.78 8.23
2025-04-09T11:41:04.78 8.22
2025-04-09T11:41:05.78 8.22
2025-04-09T11:41:06.78 8.23
2025-04-09T11:41:07.78 8.23
2025-04-09T11:41:08.78 8.21
2025-04-09T11:41:09.78 8.25
2025-04-09T11:41:10.78 8.23
2025-04-09T11:41:11.78 8.21
2025-04-09T11:41:12.78 8.23
2025-04-09T11:41:13.78 8.23
2025-04-09T11:41:14.78 8.23
2025-04-09T11:41:15.78 8.23
2025-04-09T11:41:16.78 8.23
2025-04-09T11:41:17.78 8.24
2025-04-09T11:41:18.78 8.22
2025-04-09T11:41:19.78 8.22
2025-04-09T11:41:20.78 8.21
2025-04-09T11:41:21.78 8.22
2025-04-09T11:41:22.78 8.22
2025-04-09T11:41:23.78 8.23
2025-04-09T11:41:24.78 8.21
2025-04-09T11:41:25.78 8.23
2025-04-09T11:41:26.78 8.25
2025-04-09T11:41:27.78 8.23
2025-04-09T11:41:28.78 8.23
2025-04-09T11:41:29.78 8.23
2025-04-09T11:41:30.78 8.23
2025-04-09T11:41:31.78 8.23
2025-04-09T11:41:32.78 8.23
2025-04-09T11:41:33.78 8.24
2025-04-09T11:41:34.78 8.25
2025-04-09T11:41:35.78 8.21
2025-04-09T11:41:36.78 8.23
2025-04-09T11:41:37.78 8.23
2025-04-09T11:41:38.78 8.23
2025-04-09T11:41:39.78 8.22
2025-04-09T11:41:40.78 8.21
2025-04-09T11:41:41.78 8.25
2025-04-09T11:41:42.78 8.23
2025-04-09T11:41:43.78 8.24
2025-04-09T11:41:44.78 8.25
2025-04-09T11:41:45.78 8.22
2025-04-09T11:41:46.78 8.22
2025-04-09T11:41:47.78 8.22
2025-04-09T11:41:48.78 8.24
2025-04-09T11:41:49.78 8.24
2025-04-09T11:41:50.78 8.23
2025-04-09T11:41:51.78 8.23
2025-04-09T11:41:52.78 8.22
2025-04-09T11:41:53.78 8.25
2025-04-09T11:41:54.78 8.23
2025-04-09T11:41:55.78 8.23
2025-04-09T11:41:56.78 8.25
2025-04-09T11:41:57.78 8.25
2025-04-09T11:41:58.78 8.23
2025-04-09T11:41:59.78 8.23
2025-04-09T11:42:00.78 8.23
2025-04-09T11:42:01.78 8.23
2025-04-09T11:42:02.78 8.21
2025-04-09T11:42:03.78 8.22
2025-04-09T11:42:04.78 8.22
2025-04-09T11:42:05.78 8.25
2025-04-09T11:42:06.78 8.22
2025-04-09T11:42:07.78 8.23
2025-04-09T11:42:08.78 8.25
2025-04-09T11:42:09.78 8.21
2025-04-09T11:42:10.78 8.23
2025-04-09T11:42:11.78 8.23
2025-04-09T11:42:12.78 8.21
2025-04-09T11:42:13.78 8.23
2025-04-09T11:42:14.78 8.24
2025-04-09T11:42:15.78 8.22
2025-04-09T11:42:16.78 8.23
2025-04-09T11:42:17.78 8.23
2025-04-09T11:42:18.78 8.23
2025-04-09T11:42:19.78 8.23
2025-04-09T11:42:20.78 8.25
2025-04-09T11:42:21.78 8.21
2025-04-09T11:42:22.78 8.24
2025-04-09T11:42:23.78 8.23
2025-04-09T11:42:24.78 8.21
2025-04-09T11:42:25.78 8.23
2025-04-09T11:42:26.78 8.22
2025-04-09T11:42:27.78 8.23
2025-04-09T11:42:28.78 8.23
2025-04-09T11:42:29.78 8.22
2025-04-09T11:42:30.78 8.21
2025-04-09T11:42:31.78 8.22
2025-04-09T11:42:32.78 8.23
2025-04-09T11:42:33.78 8.22
2025-04-09T11:42:34.78 8.23
2025-04-09T11:42:35.78 8.24
2025-04-09T11:42:36.78 8.23
2025-04-09T11:42:37.78 8.23
2025-04-09T11:42:38.78 8.21
2025-04-09T11:42:39.78 8.23
2025-04-09T11:42:40.78 8.20
2025-04-09T11:42:41.78 8.23
2025-04-09T11:42:42.78 8.22
2025-04-09T11:42:43.78 8.24
2025-04-09T11:42:44.78 8.22
2025-04-09T11:42:45.78 8.25
2025-04-09T11:42:46.78 8.25
2025-04-09T11:42:47.78 8.22
2025-04-09T11:42:48.78 8.20
2025-04-09T11:42:49.78 8.21
2025-04-09T11:42:50.78 8.24
2025-04-09T11:42:51.78 8.21
2025-04-09T11:42:52.78 8.23
2025-04-09T11:42:53.78 8.23
2025-04-09T11:42:54.78 8.21
2025-04-09T11:42:55.78 8.24
2025-04-09T11:42:56.78 8.24
2025-04-09T11:42:57.78 8.21
2025-04-09T11:42:58.78 8.22
2025-04-09T11:42:59.78 8.22
2025-04-09T11:43:00.78 8.23
2025-04-09T11:43:01.78 8.21
2025-04-09T11:43:02.78 8.24
2025-04-09T11:43:03.78 8.21
2025-04-09T11:43:04.78 8.22
2025-04-09T11:43:05.78 8.26
2025-04-09T11:43:06.78 8.21
2025-04-09T11:43:07.78 8.23
2025-04-09T11:43:08.78 8.24
2025-04-09T11:43:09.78 8.23
2025-04-09T11:43:10.78 8.24
2025-04-09T11:43:11.78 8.23
2025-04-09T11:43:12.78 8.23
2025-04-09T11:43:13.78 8.24
2025-04-09T11:43:14.78 8.22
2025-04-09T11:43:15.78 8.24
2025-04-09T11:43:16.78 8.23
2025-04-09T11:43:17.78 8.25
2025-04-09T11:43:18.78 8.22
2025-04-09T11:43:19.78 8.25
2025-04-09T11:43:20.78 8.24
2025-04-09T11:43:21.78 8.22
2025-04-09T11:43:22.78 8.21
2025-04-09T11:43:23.78 8.24
2025-04-09T11:43:24.78 8.25
2025-04-09T11:43:25.78 8.21
2025-04-09T11:43:26.78 8.22
2025-04-09T11:43:27.78 8.23
2025-04-09T11:43:28.78 8.22
2025-04-09T11:43:29.78 8.23
2025-04-09T11:43:30.78 8.23
2025-04-09T11:43:31.78 8.24
2025-04-09T11:43:32.78 8.21
2025-04-09T11:43:33.78 8.23
2025-04-09T11:43:34.78 8.24
2025-04-09T11:43:35.78 8.23
2025-04-09T11:43:36.78 8.23
2025-04-09T11:43:37.78 8.23
2025-04-09T11:43:38.78 8.24
2025-04-09T11:43:39.78 8.23
2025-04-09T11:43:40.78 8.25
2025-04-09T11:43:41.78 8.25
2025-04-09T11:43:42.78 8.24
2025-04-09T11:43:43.78 8.25
2025-04-09T11:43:44.78 8.22
2025-04-09T11:43:45.78 8.24
2025-04-09T11:43:46.78 8.22
2025-04-09T11:43:47.78 8.23
2025-04-09T11:43:48.78 8.23
2025-04-09T11:43:49.78 8.22
2025-04-09T11:43:50.78 8.24
2025-04-09T11:43:51.78 8.25
2025-04-09T11:43:52.78 8.22
2025-04-09T11:43:53.78 8.24
2025-04-09T11:43:54.78 8.22
2025-04-09T11:43:55.78 8.21
2025-04-09T11:43:56.78 8.23
2025-04-09T11:43:57.78 8.25
2025-04-09T11:43:58.78 8.23
2025-04-09T11:43:59.78 8.23
2025-04-09T11:44:00.78 8.23
2025-04-09T11:44:01.78 8.25
2025-04-09T11:44:02.78 8.23
2025-04-09T11:44:03.78 8.25
2025-04-09T11:44:04.78 8.23
2025-04-09T11:44:05.78 8.23
2025-04-09T11:44:06.78 8.24
2025-04-09T11:44:07.78 8.24
2025-04-09T11:44:08.78 8.25
2025-04-09T11:44:09.78 8.23
2025-04-09T11:44:10.78 8.23
2025-04-09T11:44:11.78 8.20
2025-04-09T11:44:12.78 8.24
2025-04-09T11:44:13.78 8.23
2025-04-09T11:44:14.78 8.25
2025-04-09T11:44:15.78 8.23
2025-04-09T11:44:16.78 8.26
2025-04-09T11:44:17.78 8.24
2025-04-09T11:44:18.78 8.23
2025-04-09T11:44:19.78 8.23
2025-04-09T11:44:20.78 8.24
2025-04-09T11:44:21.78 8.24
2025-04-09T11:44:22.78 8.23
2025-04-09T11:44:23.78 8.25
2025-04-09T11:44:24.78 8.23
2025-04-09T11:44:25.78 8.23
2025-04-09T11:44:26.78 8.23
2025-04-09T11:44:27.78 8.23
2025-04-09T11:44:28.78 8.24
2025-04-09T11:44:29.78 8.25
2025-04-09T11:44:30.78 8.23
2025-04-09T11:44:31.78 8.24
2025-04-09T11:44:32.78 8.25
2025-04-09T11:44:33.78 8.23
2025-04-09T11:44:34.78 8.21
2025-04-09T11:44:35.78 8.23
2025-04-09T11:44:36.78 8.25
2025-04-09T11:44:37.78 8.23
2025-04-09T11:44:38.79 8.24
2025-04-09T11:44:39.78 8.23
2025-04-09T11:44:40.78 8.23
2025-04-09T11:44:41.78 8.25
2025-04-09T11:44:42.78 8.22
2025-04-09T11:44:43.78 8.20
2025-04-09T11:44:44.78 8.21
2025-04-09T11:44:45.79 8.25
2025-04-09T11:44:46.79 8.23
2025-04-09T11:44:47.79 8.23
2025-04-09T11:44:48.79 8.24
2025-04-09T11:44:49.79 8.25
2025-04-09T11:44:50.79 8.23
2025-04-09T11:44:51.79 8.24
2025-04-09T11:44:52.79 8.24
2025-04-09T11:44:53.79 8.24
2025-04-09T11:44:54.79 8.24
2025-04-09T11:44:55.79 8.27
2025-04-09T11:44:56.79 8.22
2025-04-09T11:44:57.79 8.24
2025-04-09T11:44:58.79 8.24
2025-04-09T11:44:59.79 8.25
2025-04-09T11:45:00.79 8.23
2025-04-09T11:45:01.79 8.25
2025-04-09T11:45:02.79 8.24
2025-04-09T11:45:03.79 8.25
2025-04-09T11:45:04.79 8.23
2025-04-09T11:45:05.79 8.26
2025-04-09T11:45:06.79 8.23
2025-04-09T11:45:07.79 8.25
2025-04-09T11:45:08.79 8.26
2025-04-09T11:45:09.79 8.23
2025-04-09T11:45:10.79 8.23
2025-04-09T11:45:11.79 8.21
2025-04-09T11:45:12.79 8.23
2025-04-09T11:45:13.79 8.25
2025-04-09T11:45:14.79 8.24
2025-04-09T11:45:15.79 8.25
2025-04-09T11:45:16.79 8.25
2025-04-09T11:45:17.79 8.22
2025-04-09T11:45:18.79 8.25
2025-04-09T11:45:19.79 8.23
2025-04-09T11:45:20.79 8.21
2025-04-09T11:45:21.79 8.23
2025-04-09T11:45:22.79 8.25
2025-04-09T11:45:23.79 8.23
2025-04-09T11:45:24.79 8.25
2025-04-09T11:45:25.79 8.26
2025-04-09T11:45:26.79 8.23
2025-04-09T11:45:27.79 8.23
2025-04-09T11:45:28.79 8.21
2025-04-09T11:45:29.79 8.23
2025-04-09T11:45:30.79 8.23
2025-04-09T11:45:31.79 8.23
2025-04-09T11:45:32.79 8.22
2025-04-09T11:45:33.79 8.23
2025-04-09T11:45:34.79 8.23
2025-04-09T11:45:35.79 8.24
2025-04-09T11:45:36.79 8.25
2025-04-09T11:45:37.79 8.23
2025-04-09T11:45:38.79 8.25
2025-04-09T11:45:39.79 8.23
2025-04-09T11:45:40.79 8.23
2025-04-09T11:45:41.79 8.23
2025-04-09T11:45:42.79 8.21
2025-04-09T11:45:43.79 8.22
2025-04-09T11:45:44.79 8.22
2025-04-09T11:45:45.79 8.25
2025-04-09T11:45:46.79 8.22
2025-04-09T11:45:47.79 8.24
2025-04-09T11:45:48.79 8.22
2025-04-09T11:45:49.79 8.24
2025-04-09T11:45:50.79 8.21
2025-04-09T11:45:51.79 8.25
2025-04-09T11:45:52.79 8.24
2025-04-09T11:45:53.79 8.24
2025-04-09T11:45:54.79 8.23
2025-04-09T11:45:55.79 8.22
2025-04-09T11:45:56.79 8.24
2025-04-09T11:45:57.79 8.25
2025-04-09T11:45:58.79 8.23
2025-04-09T11:45:59.79 8.21
2025-04-09T11:46:00.79 8.22
2025-04-09T11:46:01.79 8.24
2025-04-09T11:46:02.79 8.25
2025-04-09T11:46:03.79 8.22
2025-04-09T11:46:04.79 8.25
2025-04-09T11:46:05.79 8.25
2025-04-09T11:46:06.79 8.23
2025-04-09T11:46:07.79 8.22
2025-04-09T11:46:08.79 8.24
2025-04-09T11:46:09.79 8.25
2025-04-09T11:46:10.79 8.22
2025-04-09T11:46:11.79 8.23
2025-04-09T11:46:12.79 8.22
2025-04-09T11:46:13.79 8.23
2025-04-09T11:46:14.79 8.23
2025-04-09T11:46:15.79 8.21
2025-04-09T11:46:16.79 8.22
2025-04-09T11:46:17.79 8.23
2025-04-09T11:46:18.79 8.24
2025-04-09T11:46:19.79 8.23
2025-04-09T11:46:20.79 8.23
2025-04-09T11:46:21.79 8.23
2025-04-09T11:46:22.79 8.20
2025-04-09T11:46:23.79 8.24
2025-04-09T11:46:24.79 8.24
2025-04-09T11:46:25.79 8.22
2025-04-09T11:46:26.79 8.22
2025-04-09T11:46:27.79 8.22
2025-04-09T11:46:28.79 8.21
2025-04-09T11:46:29.79 8.21
2025-04-09T11:46:30.79 8.25
2025-04-09T11:46:31.79 8.25
2025-04-09T11:46:32.79 8.23
2025-04-09T11:46:33.79 8.26
2025-04-09T11:46:34.79 8.23
2025-04-09T11:46:35.79 8.22
2025-04-09T11:46:36.79 8.25
2025-04-09T11:46:37.79 8.23
2025-04-09T11:46:38.79 8.21
2025-04-09T11:46:39.79 8.23
2025-04-09T11:46:40.79 8.22
2025-04-09T11:46:41.79 8.24
2025-04-09T11:46:42.79 8.23
2025-04-09T11:46:43.79 8.25
2025-04-09T11:46:44.79 8.25
2025-04-09T11:46:45.79 8.23
2025-04-09T11:46:46.79 8.23
2025-04-09T11:46:47.79 8.22
2025-04-09T11:46:48.79 8.25
2025-04-09T11:46:49.79 8.25
2025-04-09T11:46:50.79 8.24
2025-04-09T11:46:51.79 8.23
2025-04-09T11:46:52.79 8.23
2025-04-09T11:46:53.79 8.22
2025-04-09T11:46:54.79 8.25
2025-04-09T11:46:55.79 8.23
2025-04-09T11:46:56.79 8.25
2025-04-09T11:46:57.79 8.25
2025-04-09T11:46:58.79 8.25
2025-04-09T11:46:59.79 8.23
2025-04-09T11:47:00.79 8.23
2025-04-09T11:47:01.79 8.25
2025-04-09T11:47:02.79 8.25
2025-04-09T11:47:03.79 8.23
2025-04-09T11:47:04.79 8.23
2025-04-09T11:47:05.79 8.23
2025-04-09T11:47:06.79 8.24
2025-04-09T11:47:07.79 8.24
2025-04-09T11:47:08.79 8.22
2025-04-09T11:47:09.79 8.23
2025-04-09T11:47:10.79 8.23
2025-04-09T11:47:11.79 8.23
2025-04-09T11:47:12.79 8.23
2025-04-09T11:47:13.79 8.23
2025-04-09T11:47:14.79 8.21
2025-04-09T11:47:15.79 8.21
2025-04-09T11:47:16.79 8.22
2025-04-09T11:47:17.79 8.24
2025-04-09T11:47:18.79 8.25
2025-04-09T11:47:19.79 8.23
2025-04-09T11:47:20.79 8.25
2025-04-09T11:47:21.79 8.21
2025-04-09T11:47:22.79 8.24
2025-04-09T11:47:23.79 8.23
2025-04-09T11:47:24.79 8.24
2025-04-09T11:47:25.79 8.23
2025-04-09T11:47:26.79 8.23
2025-04-09T11:47:27.79 8.24
2025-04-09T11:47:28.79 8.21
2025-04-09T11:47:29.79 8.24
2025-04-09T11:47:30.79 8.24
2025-04-09T11:47:31.79 8.23
2025-04-09T11:47:32.79 8.23
2025-04-09T11:47:33.79 8.23
2025-04-09T11:47:34.79 8.25
2025-04-09T11:47:35.79 8.23
2025-04-09T11:47:36.79 8.25
2025-04-09T11:47:37.79 8.24
2025-04-09T11:47:38.79 8.24
2025-04-09T11:47:39.79 8.22
2025-04-09T11:47:40.79 8.23
2025-04-09T11:47:41.79 8.24
2025-04-09T11:47:42.79 8.23
2025-04-09T11:47:43.79 8.23
2025-04-09T11:47:44.79 8.23
2025-04-09T11:47:45.79 8.25
2025-04-09T11:47:46.79 8.24
2025-04-09T11:47:47.79 8.24
2025-04-09T11:47:48.79 8.25
2025-04-09T11:47:49.79 8.23
2025-04-09T11:47:50.79 8.23
2025-04-09T11:47:51.79 8.23
2025-04-09T11:47:52.79 8.24
2025-04-09T11:47:53.79 8.23
2025-04-09T11:47:54.79 8.23
2025-04-09T11:47:55.79 8.24
2025-04-09T11:47:56.79 8.24
2025-04-09T11:47:57.79 8.25
2025-04-09T11:47:58.79 8.24
2025-04-09T11:47:59.79 8.23
2025-04-09T11:48:00.79 8.23
2025-04-09T11:48:01.79 8.23
2025-04-09T11:48:02.79 8.21
2025-04-09T11:48:03.79 8.21
2025-04-09T11:48:04.79 8.22
2025-04-09T11:48:05.79 8.25
2025-04-09T11:48:06.79 8.23
2025-04-09T11:48:07.79 8.23
2025-04-09T11:48:08.79 8.23
2025-04-09T11:48:09.79 8.23
2025-04-09T11:48:10.79 8.26
2025-04-09T11:48:11.79 8.23
2025-04-09T11:48:12.79 8.24
2025-04-09T11:48:13.79 8.24
2025-04-09T11:48:14.79 8.24
2025-04-09T11:48:15.79 8.23
2025-04-09T11:48:16.79 8.26
2025-04-09T11:48:17.79 8.23
2025-04-09T11:48:18.79 8.23
2025-04-09T11:48:19.79 8.23
2025-04-09T11:48:20.79 8.24
2025-04-09T11:48:21.79 8.25
2025-04-09T11:48:22.79 8.23
2025-04-09T11:48:23.79 8.24
2025-04-09T11:48:24.79 8.21
2025-04-09T11:48:25.79 8.23
2025-04-09T11:48:26.79 8.22
2025-04-09T11:48:27.79 8.23
2025-04-09T11:48:28.79 8.22
2025-04-09T11:48:29.79 8.25
2025-04-09T11:48:30.79 8.23
2025-04-09T11:48:31.79 8.23
2025-04-09T11:48:32.79 8.22
2025-04-09T11:48:33.79 8.25
2025-04-09T11:48:34.79 8.21
2025-04-09T11:48:35.79 8.24
2025-04-09T11:48:36.79 8.23
2025-04-09T11:48:37.79 8.25
2025-04-09T11:48:38.79 8.23
2025-04-09T11:48:39.79 8.21
2025-04-09T11:48:40.79 8.23
2025-04-09T11:48:41.79 8.24
2025-04-09T11:48:42.79 8.24
2025-04-09T11:48:43.79 8.24
2025-04-09T11:48:44.79 8.22
2025-04-09T11:48:45.79 8.23
2025-04-09T11:48:46.79 8.23
2025-04-09T11:48:47.79 8.21
2025-04-09T11:48:48.79 8.22
2025-04-09T11:48:49.79 8.22
2025-04-09T11:48:50.79 8.22
2025-04-09T11:48:51.79 8.24
2025-04-09T11:48:52.79 8.25
2025-04-09T11:48:53.79 8.22
2025-04-09T11:48:54.79 8.23
2025-04-09T11:48:55.79 8.21
2025-04-09T11:48:56.79 8.22
2025-04-09T11:48:57.79 8.22
2025-04-09T11:48:58.79 8.26
2025-04-09T11:48:59.79 8.24
2025-04-09T11:49:00.79 8.25
2025-04-09T11:49:01.79 8.23
2025-04-09T11:49:02.79 8.26
2025-04-09T11:49:03.79 8.24
2025-04-09T11:49:04.79 8.22
2025-04-09T11:49:05.79 8.22
2025-04-09T11:49:06.79 8.25
2025-04-09T11:49:07.79 8.23
2025-04-09T11:49:08.79 8.25
2025-04-09T11:49:09.79 8.22
2025-04-09T11:49:10.79 8.25
2025-04-09T11:49:11.79 8.21
2025-04-09T11:49:12.79 8.22
2025-04-09T11:49:13.79 8.23
2025-04-09T11:49:14.79 8.23
2025-04-09T11:49:15.79 8.23
2025-04-09T11:49:16.79 8.23
2025-04-09T11:49:17.79 8.24
2025-04-09T11:49:18.79 8.24
2025-04-09T11:49:19.79 8.25
2025-04-09T11:49:20.79 8.22
2025-04-09T11:49:21.79 8.22
2025-04-09T11:49:22.79 8.23
2025-04-09T11:49:23.79 8.23
2025-04-09T11:49:24.79 8.24
2025-04-09T11:49:25.79 8.26
2025-04-09T11:49:26.79 8.20
2025-04-09T11:49:27.79 8.23
2025-04-09T11:49:28.79 8.21
2025-04-09T11:49:29.79 8.22
2025-04-09T11:49:30.79 8.23
2025-04-09T11:49:31.79 8.22
2025-04-09T11:49:32.79 8.25
2025-04-09T11:49:33.79 8.24
2025-04-09T11:49:34.79 8.23
2025-04-09T11:49:35.79 8.23
2025-04-09T11:49:36.79 8.23
2025-04-09T11:49:37.79 8.23
2025-04-09T11:49:38.79 8.24
2025-04-09T11:49:39.79 8.21
2025-04-09T11:49:40.79 8.24
2025-04-09T11:49:41.79 8.24
2025-04-09T11:49:42.79 8.24
2025-04-09T11:49:43.79 8.23
2025-04-09T11:49:44.79 8.21
2025-04-09T11:49:45.79 8.24
2025-04-09T11:49:46.79 8.22
2025-04-09T11:49:47.79 8.22
2025-04-09T11:49:48.79 8.22
2025-04-09T11:49:49.79 8.24
2025-04-09T11:49:50.79 8.23
2025-04-09T11:49:51.79 8.25
2025-04-09T11:49:52.79 8.21
2025-04-09T11:49:53.79 8.23
2025-04-09T11:49:54.79 8.25
2025-04-09T11:49:55.79 8.23
2025-04-09T11:49:56.79 8.22
2025-04-09T11:49:57.80 8.24
2025-04-09T11:49:58.79 8.24
2025-04-09T11:49:59.79 8.22
2025-04-09T11:50:00.79 8.20
2025-04-09T11:50:01.80 8.23
2025-04-09T11:50:02.79 8.23
2025-04-09T11:50:03.80 8.24
2025-04-09T11:50:04.80 8.25
2025-04-09T11:50:05.80 8.25
2025-04-09T11:50:06.80 8.22
2025-04-09T11:50:07.80 8.22
2025-04-09T11:50:08.80 8.23
2025-04-09T11:50:09.80 8.20
2025-04-09T11:50:10.80 8.24
2025-04-09T11:50:11.80 8.23
2025-04-09T11:50:12.80 8.23
2025-04-09T11:50:13.80 8.23
2025-04-09T11:50:14.80 8.24
2025-04-09T11:50:15.80 8.22
2025-04-09T11:50:16.80 8.22
2025-04-09T11:50:17.80 8.23
2025-04-09T11:50:18.80 8.22
2025-04-09T11:50:19.80 8.25
2025-04-09T11:50:20.80 8.25
2025-04-09T11:50:21.80 8.23
2025-04-09T11:50:22.80 8.21
2025-04-09T11:50:23.80 8.22
2025-04-09T11:50:24.80 8.24
2025-04-09T11:50:25.80 8.21
2025-04-09T11:50:26.80 8.23
2025-04-09T11:50:27.80 8.21
2025-04-09T11:50:28.80 8.21
2025-04-09T11:50:29.80 8.23
2025-04-09T11:50:30.80 8.23
2025-04-09T11:50:31.80 8.21
2025-04-09T11:50:32.80 8.25
2025-04-09T11:50:33.80 8.23
2025-04-09T11:50:34.80 8.21
2025-04-09T11:50:35.80 8.21
2025-04-09T11:50:36.80 8.19
2025-04-09T11:50:37.80 8.24
2025-04-09T11:50:38.81 8.23
2025-04-09T11:50:39.79 8.23
2025-04-09T11:50:40.79 8.24
2025-04-09T11:50:41.79 8.23
2025-04-09T11:50:42.79 8.23
2025-04-09T11:50:43.79 8.25
2025-04-09T11:50:44.79 8.23
2025-04-09T11:50:45.79 8.23
2025-04-09T11:50:46.79 8.23
2025-04-09T11:50:47.79 8.24
2025-04-09T11:50:48.79 8.24
2025-04-09T11:50:49.79 8.24
2025-04-09T11:50:50.79 8.23
2025-04-09T11:50:51.79 8.23
2025-04-09T11:50:52.79 8.24
2025-04-09T11:50:53.79 8.25
2025-04-09T11:50:54.79 8.23
2025-04-09T11:50:55.79 8.22
2025-04-09T11:50:56.79 8.24
2025-04-09T11:50:57.79 8.23
2025-04-09T11:50:58.79 8.23
2025-04-09T11:50:59.80 8.22
2025-04-09T11:51:00.80 8.22
2025-04-09T11:51:01.80 8.23
2025-04-09T11:51:02.80 8.23
2025-04-09T11:51:03.80 8.23
2025-04-09T11:51:04.80 8.23
2025-04-09T11:51:05.80 8.25
2025-04-09T11:51:06.80 8.24
2025-04-09T11:51:07.80 8.23
2025-04-09T11:51:08.80 8.24
2025-04-09T11:51:09.80 8.23
2025-04-09T11:51:10.80 8.26
2025-04-09T11:51:11.80 8.23
2025-04-09T11:51:12.80 8.25
2025-04-09T11:51:13.80 8.23
2025-04-09T11:51:14.80 8.23
2025-04-09T11:51:15.80 8.23
2025-04-09T11:51:16.80 8.24
2025-04-09T11:51:17.80 8.22
2025-04-09T11:51:18.80 8.25
2025-04-09T11:51:19.80 8.25
2025-04-09T11:51:20.80 8.23
2025-04-09T11:51:21.80 8.22
2025-04-09T11:51:22.80 8.21
2025-04-09T11:51:23.80 8.23
2025-04-09T11:51:24.80 8.26
2025-04-09T11:51:25.80 8.23
2025-04-09T11:51:26.80 8.22
2025-04-09T11:51:27.80 8.26
2025-04-09T11:51:28.80 8.23
2025-04-09T11:51:29.80 8.23
2025-04-09T11:51:30.80 8.24
2025-04-09T11:51:31.80 8.24
2025-04-09T11:51:32.80 8.23
2025-04-09T11:51:33.80 8.21
2025-04-09T11:51:34.80 8.23
2025-04-09T11:51:35.80 8.25
2025-04-09T11:51:36.80 8.24
2025-04-09T11:51:37.80 8.24
2025-04-09T11:51:38.80 8.25
2025-04-09T11:51:39.80 8.25
2025-04-09T11:51:40.80 8.22
2025-04-09T11:51:41.80 8.25
2025-04-09T11:51:42.80 8.25
2025-04-09T11:51:43.80 8.24
2025-04-09T11:51:44.80 8.23
2025-04-09T11:51:45.80 8.23
2025-04-09T11:51:46.80 8.23
2025-04-09T11:51:47.80 8.24
2025-04-09T11:51:48.80 8.26
2025-04-09T11:51:49.80 8.23
2025-04-09T11:51:50.80 8.23
2025-04-09T11:51:51.80 8.23
2025-04-09T11:51:52.80 8.21
2025-04-09T11:51:53.80 8.21
2025-04-09T11:51:54.80 8.22
2025-04-09T11:51:55.80 8.25
2025-04-09T11:51:56.80 8.24
2025-04-09T11:51:57.80 8.21
2025-04-09T11:51:58.80 8.22
2025-04-09T11:51:59.80 8.23
2025-04-09T11:52:00.80 8.22
2025-04-09T11:52:01.80 8.22
2025-04-09T11:52:02.80 8.23
2025-04-09T11:52:03.80 8.25
2025-04-09T11:52:04.80 8.21
2025-04-09T11:52:05.80 8.22
2025-04-09T11:52:06.80 8.23
2025-04-09T11:52:07.80 8.24
2025-04-09T11:52:08.80 8.24
2025-04-09T11:52:09.80 8.22
2025-04-09T11:52:10.80 8.23
2025-04-09T11:52:11.80 8.21
2025-04-09T11:52:12.80 8.23
2025-04-09T11:52:13.80 8.23
2025-04-09T11:52:14.80 8.22
2025-04-09T11:52:15.80 8.21
2025-04-09T11:52:16.80 8.23
2025-04-09T11:52:17.80 8.22
2025-04-09T11:52:18.80 8.24
2025-04-09T11:52:19.80 8.25
2025-04-09T11:52:20.80 8.23
2025-04-09T11:52:21.80 8.25
2025-04-09T11:52:22.80 8.21
2025-04-09T11:52:23.80 8.21
2025-04-09T11:52:24.80 8.24
2025-04-09T11:52:25.80 8.21
2025-04-09T11:52:26.80 8.25
2025-04-09T11:52:27.80 8.25
2025-04-09T11:52:28.80 8.24
2025-04-09T11:52:29.80 8.22
2025-04-09T11:52:30.80 8.24
2025-04-09T11:52:31.80 8.22
2025-04-09T11:52:32.80 8.21
2025-04-09T11:52:33.80 8.25
2025-04-09T11:52:34.80 8.23
2025-04-09T11:52:35.80 8.23
2025-04-09T11:52:36.80 8.24
2025-04-09T11:52:37.80 8.23
2025-04-09T11:52:38.80 8.24
2025-04-09T11:52:39.80 8.22
2025-04-09T11:52:40.80 8.22
2025-04-09T11:52:41.80 8.24
2025-04-09T11:52:42.80 8.22
2025-04-09T11:52:43.80 8.25
2025-04-09T11:52:44.80 8.24
2025-04-09T11:52:45.80 8.24
2025-04-09T11:52:46.80 8.22
2025-04-09T11:52:47.80 8.25
2025-04-09T11:52:48.80 8.25
2025-04-09T11:52:49.80 8.21
2025-04-09T11:52:50.80 8.23
2025-04-09T11:52:51.80 8.24
2025-04-09T11:52:52.80 8.24
2025-04-09T11:52:53.80 8.23
2025-04-09T11:52:54.80 8.25
2025-04-09T11:52:55.80 8.23
2025-04-09T11:52:56.80 8.21
2025-04-09T11:52:57.80 8.27
2025-04-09T11:52:58.80 8.22
2025-04-09T11:52:59.80 8.22
2025-04-09T11:53:00.80 8.23
2025-04-09T11:53:01.80 8.23
2025-04-09T11:53:02.80 8.26
2025-04-09T11:53:03.80 8.24
2025-04-09T11:53:04.80 8.21
2025-04-09T11:53:05.80 8.24
2025-04-09T11:53:06.80 8.25
2025-04-09T11:53:07.80 8.23
2025-04-09T11:53:08.80 8.21
2025-04-09T11:53:09.80 8.25
2025-04-09T11:53:10.80 8.21
2025-04-09T11:53:11.80 8.22
2025-04-09T11:53:12.80 8.23
2025-04-09T11:53:13.80 8.23
2025-04-09T11:53:14.80 8.26
2025-04-09T11:53:15.80 8.25
2025-04-09T11:53:16.80 8.25
2025-04-09T11:53:17.80 8.23
2025-04-09T11:53:18.80 8.25
2025-04-09T11:53:19.80 8.24
2025-04-09T11:53:20.80 8.21
2025-04-09T11:53:21.80 8.23
2025-04-09T11:53:22.80 8.23
2025-04-09T11:53:23.80 8.22
2025-04-09T11:53:24.80 8.23
2025-04-09T11:53:25.80 8.23
2025-04-09T11:53:26.80 8.21
2025-04-09T11:53:27.80 8.21
2025-04-09T11:53:28.80 8.23
2025-04-09T11:53:29.80 8.21
2025-04-09T11:53:30.80 8.23
2025-04-09T11:53:31.80 8.23
2025-04-09T11:53:32.80 8.21
2025-04-09T11:53:33.80 8.25
2025-04-09T11:53:34.80 8.21
2025-04-09T11:53:35.80 8.21
2025-04-09T11:53:36.80 8.23
2025-04-09T11:53:37.80 8.22
2025-04-09T11:53:38.80 8.24
2025-04-09T11:53:39.80 8.23
2025-04-09T11:53:40.80 8.23
2025-04-09T11:53:41.80 8.23
2025-04-09T11:53:42.80 8.22
2025-04-09T11:53:43.80 8.24
2025-04-09T11:53:44.80 8.23
2025-04-09T11:53:45.80 8.23
2025-04-09T11:53:46.80 8.24
2025-04-09T11:53:47.80 8.21
2025-04-09T11:53:48.80 8.24
2025-04-09T11:53:49.80 8.24
2025-04-09T11:53:50.80 8.22
2025-04-09T11:53:51.80 8.23
2025-04-09T11:53:52.80 8.21
2025-04-09T11:53:53.80 8.24
2025-04-09T11:53:54.80 8.21
2025-04-09T11:53:55.80 8.25
2025-04-09T11:53:56.80 8.22
2025-04-09T11:53:57.80 8.22
2025-04-09T11:53:58.80 8.21
2025-04-09T11:53:59.80 8.22
2025-04-09T11:54:00.80 8.23
2025-04-09T11:54:01.80 8.24
2025-04-09T11:54:02.80 8.22
2025-04-09T11:54:03.80 8.23
2025-04-09T11:54:04.80 8.25
2025-04-09T11:54:05.80 8.23
2025-04-09T11:54:06.80 8.25
2025-04-09T11:54:07.80 8.22
2025-04-09T11:54:08.80 8.22
2025-04-09T11:54:09.80 8.22
2025-04-09T11:54:10.80 8.24
2025-04-09T11:54:11.80 8.22
2025-04-09T11:54:12.80 8.25
2025-04-09T11:54:13.80 8.25
2025-04-09T11:54:14.80 8.23
2025-04-09T11:54:15.80 8.23
2025-04-09T11:54:16.80 8.23
2025-04-09T11:54:17.80 8.21
2025-04-09T11:54:18.80 8.22
2025-04-09T11:54:19.80 8.22
2025-04-09T11:54:20.80 8.23
2025-04-09T11:54:21.80 8.22
2025-04-09T11:54:22.80 8.23
2025-04-09T11:54:23.80 8.23
2025-04-09T11:54:24.80 8.23
2025-04-09T11:54:25.80 8.23
2025-04-09T11:54:26.80 8.24
2025-04-09T11:54:27.80 8.25
2025-04-09T11:54:28.80 8.25
2025-04-09T11:54:29.80 8.23
2025-04-09T11:54:30.80 8.24
2025-04-09T11:54:31.80 8.22
2025-04-09T11:54:32.80 8.23
2025-04-09T11:54:33.80 8.23
2025-04-09T11:54:34.80 8.23
2025-04-09T11:54:35.80 8.24
2025-04-09T11:54:36.80 8.23
2025-04-09T11:54:37.80 8.20
2025-04-09T11:54:38.80 8.24
2025-04-09T11:54:39.80 8.22
2025-04-09T11:54:40.80 8.23
2025-04-09T11:54:41.80 8.22
2025-04-09T11:54:42.80 8.24
2025-04-09T11:54:43.80 8.21
2025-04-09T11:54:44.80 8.23
2025-04-09T11:54:45.80 8.21
2025-04-09T11:54:46.80 8.23
2025-04-09T11:54:47.80 8.23
2025-04-09T11:54:48.80 8.21
2025-04-09T11:54:49.80 8.24
2025-04-09T11:54:50.80 8.24
2025-04-09T11:54:51.80 8.24
2025-04-09T11:54:52.80 8.23
2025-04-09T11:54:53.80 8.25
2025-04-09T11:54:54.80 8.21
2025-04-09T11:54:55.80 8.21
2025-04-09T11:54:56.80 8.23
2025-04-09T11:54:57.80 8.23
2025-04-09T11:54:58.80 8.22
2025-04-09T11:54:59.80 8.25
2025-04-09T11:55:00.80 8.23
2025-04-09T11:55:01.80 8.25
2025-04-09T11:55:02.80 8.24
2025-04-09T11:55:03.80 8.23
2025-04-09T11:55:04.80 8.25
2025-04-09T11:55:05.80 8.22
2025-04-09T11:55:06.80 8.24
2025-04-09T11:55:07.80 8.25
2025-04-09T11:55:08.80 8.23
2025-04-09T11:55:09.80 8.22
2025-04-09T11:55:10.80 8.21
2025-04-09T11:55:11.80 8.23
2025-04-09T11:55:12.80 8.24
2025-04-09T11:55:13.80 8.22
2025-04-09T11:55:14.80 8.23
2025-04-09T11:55:15.80 8.24
2025-04-09T11:55:16.80 8.24
2025-04-09T11:55:17.80 8.23
2025-04-09T11:55:18.80 8.21
2025-04-09T11:55:19.80 8.23
2025-04-09T11:55:20.80 8.21
2025-04-09T11:55:21.81 8.22
2025-04-09T11:55:22.81 8.23
2025-04-09T11:55:23.81 8.23
2025-04-09T11:55:24.81 8.23
2025-04-09T11:55:25.81 8.25
2025-04-09T11:55:26.81 8.25
2025-04-09T11:55:27.81 8.25
2025-04-09T11:55:28.81 8.21
2025-04-09T11:55:29.81 8.22
2025-04-09T11:55:30.81 8.23
2025-04-09T11:55:31.81 8.25
2025-04-09T11:55:32.81 8.22
2025-04-09T11:55:33.81 8.23
2025-04-09T11:55:34.81 8.23
2025-04-09T11:55:35.81 8.23
2025-04-09T11:55:36.81 8.22
2025-04-09T11:55:37.81 8.21
2025-04-09T11:55:38.81 8.25
2025-04-09T11:55:39.81 8.21
2025-04-09T11:55:40.81 8.24
2025-04-09T11:55:41.81 8.23
2025-04-09T11:55:42.81 8.23
2025-04-09T11:55:43.81 8.20
2025-04-09T11:55:44.81 8.23
2025-04-09T11:55:45.81 8.25
2025-04-09T11:55:46.81 8.23
2025-04-09T11:55:47.81 8.23
2025-04-09T11:55:48.81 8.25
2025-04-09T11:55:49.81 8.24
2025-04-09T11:55:50.81 8.24
2025-04-09T11:55:51.81 8.23
2025-04-09T11:55:52.81 8.23
2025-04-09T11:55:53.81 8.21
2025-04-09T11:55:54.81 8.24
2025-04-09T11:55:55.81 8.25
2025-04-09T11:55:56.81 8.22
2025-04-09T11:55:57.81 8.23
2025-04-09T11:55:58.81 8.24
2025-04-09T11:55:59.81 8.23
2025-04-09T11:56:00.81 8.24
2025-04-09T11:56:01.81 8.21
2025-04-09T11:56:02.81 8.23
2025-04-09T11:56:03.81 8.23
2025-04-09T11:56:04.81 8.25
2025-04-09T11:56:05.81 8.24
2025-04-09T11:56:06.81 8.23
2025-04-09T11:56:07.81 8.24
2025-04-09T11:56:08.81 8.23
2025-04-09T11:56:09.81 8.23
2025-04-09T11:56:10.81 8.23
2025-04-09T11:56:11.81 8.24
2025-04-09T11:56:12.81 8.24
2025-04-09T11:56:13.81 8.23
2025-04-09T11:56:14.81 8.21
2025-04-09T11:56:15.81 8.23
2025-04-09T11:56:16.81 8.23
2025-04-09T11:56:17.81 8.24
2025-04-09T11:56:18.81 8.21
2025-04-09T11:56:19.81 8.25
2025-04-09T11:56:20.81 8.25
2025-04-09T11:56:21.81 8.25
2025-04-09T11:56:22.81 8.26
2025-04-09T11:56:23.81 8.23
2025-04-09T11:56:24.81 8.25
2025-04-09T11:56:25.81 8.25
2025-04-09T11:56:26.81 8.20
2025-04-09T11:56:27.81 8.23
2025-04-09T11:56:28.81 8.21
2025-04-09T11:56:29.81 8.24
2025-04-09T11:56:30.81 8.23
2025-04-09T11:56:31.81 8.23
2025-04-09T11:56:32.81 8.24
2025-04-09T11:56:33.81 8.23
2025-04-09T11:56:34.81 8.23
2025-04-09T11:56:35.81 8.25
2025-04-09T11:56:36.81 8.23
2025-04-09T11:56:37.81 8.21
2025-04-09T11:56:38.81 8.24
2025-04-09T11:56:39.81 8.24
2025-04-09T11:56:40.81 8.21
2025-04-09T11:56:41.81 8.23
2025-04-09T11:56:42.81 8.23
2025-04-09T11:56:43.81 8.25
2025-04-09T11:56:44.81 8.25
2025-04-09T11:56:45.81 8.21
2025-04-09T11:56:46.81 8.23
2025-04-09T11:56:47.81 8.22
2025-04-09T11:56:48.81 8.23
2025-04-09T11:56:49.81 8.23
2025-04-09T11:56:50.81 8.24
2025-04-09T11:56:51.81 8.24
2025-04-09T11:56:52.81 8.23
2025-04-09T11:56:53.81 8.21
2025-04-09T11:56:54.81 8.23
2025-04-09T11:56:55.81 8.21
2025-04-09T11:56:56.81 8.22
2025-04-09T11:56:57.81 8.25
2025-04-09T11:56:58.81 8.20
2025-04-09T11:56:59.81 8.21
2025-04-09T11:57:00.81 8.23
2025-04-09T11:57:01.81 8.21
2025-04-09T11:57:02.81 8.23
2025-04-09T11:57:03.81 8.21
2025-04-09T11:57:04.81 8.24
2025-04-09T11:57:05.81 8.23
2025-04-09T11:57:06.81 8.23
2025-04-09T11:57:07.81 8.25
2025-04-09T11:57:08.81 8.25
2025-04-09T11:57:09.81 8.22
2025-04-09T11:57:10.81 8.22
2025-04-09T11:57:11.81 8.24
2025-04-09T11:57:12.81 8.23
2025-04-09T11:57:13.81 8.21
2025-04-09T11:57:14.81 8.23
2025-04-09T11:57:15.81 8.22
2025-04-09T11:57:16.81 8.21
2025-04-09T11:57:17.81 8.22
2025-04-09T11:57:18.81 8.24
2025-04-09T11:57:19.81 8.23
2025-04-09T11:57:20.81 8.23
2025-04-09T11:57:21.81 8.24
2025-04-09T11:57:22.81 8.21
2025-04-09T11:57:23.81 8.24
2025-04-09T11:57:24.81 8.22
2025-04-09T11:57:25.81 8.21
2025-04-09T11:57:26.81 8.23
2025-04-09T11:57:27.81 8.24
2025-04-09T11:57:28.81 8.23
2025-04-09T11:57:29.81 8.22
2025-04-09T11:57:30.81 8.23
2025-04-09T11:57:31.81 8.21
2025-04-09T11:57:32.81 8.24
2025-04-09T11:57:33.81 8.22
2025-04-09T11:57:34.81 8.25
2025-04-09T11:57:35.81 8.22
2025-04-09T11:57:36.81 8.25
2025-04-09T11:57:37.81 8.23
2025-04-09T11:57:38.81 8.25
2025-04-09T11:57:39.81 8.24
2025-04-09T11:57:40.81 8.23
2025-04-09T11:57:41.81 8.22
2025-04-09T11:57:42.81 8.23
2025-04-09T11:57:43.81 8.21
2025-04-09T11:57:44.81 8.22
2025-04-09T11:57:45.81 8.21
2025-04-09T11:57:46.81 8.23
2025-04-09T11:57:47.81 8.23
2025-04-09T11:57:48.81 8.23
2025-04-09T11:57:49.81 8.25
2025-04-09T11:57:50.81 8.22
2025-04-09T11:57:51.81 8.23
2025-04-09T11:57:52.81 8.23
2025-04-09T11:57:53.81 8.22
2025-04-09T11:57:54.81 8.23
2025-04-09T11:57:55.81 8.21
2025-04-09T11:57:56.81 8.23
2025-04-09T11:57:57.81 8.21
2025-04-09T11:57:58.81 8.24
2025-04-09T11:57:59.81 8.22
2025-04-09T11:58:00.81 8.25
2025-04-09T11:58:01.81 8.24
2025-04-09T11:58:02.81 8.21
2025-04-09T11:58:03.81 8.25
2025-04-09T11:58:04.81 8.21
2025-04-09T11:58:05.81 8.25
2025-04-09T11:58:06.81 8.24
2025-04-09T11:58:07.81 8.22
2025-04-09T11:58:08.81 8.22
2025-04-09T11:58:09.81 8.23
2025-04-09T11:58:10.81 8.23
2025-04-09T11:58:11.81 8.21
2025-04-09T11:58:12.81 8.22
2025-04-09T11:58:13.81 8.23
2025-04-09T11:58:14.81 8.22
2025-04-09T11:58:15.81 8.23
2025-04-09T11:58:16.81 8.26
2025-04-09T11:58:17.81 8.24
2025-04-09T11:58:18.81 8.23
2025-04-09T11:58:19.81 8.23
2025-04-09T11:58:20.81 8.23
2025-04-09T11:58:21.81 8.23
2025-04-09T11:58:22.81 8.23
2025-04-09T11:58:23.81 8.22
2025-04-09T11:58:24.81 8.23
2025-04-09T11:58:25.81 8.21
2025-04-09T11:58:26.81 8.21
2025-04-09T11:58:27.81 8.22
2025-04-09T11:58:28.81 8.22
2025-04-09T11:58:29.81 8.21
2025-04-09T11:58:30.81 8.22
2025-04-09T11:58:31.81 8.25
2025-04-09T11:58:32.81 8.23
2025-04-09T11:58:33.81 8.25
2025-04-09T11:58:34.81 8.21
2025-04-09T11:58:35.81 8.24
2025-04-09T11:58:36.81 8.22
2025-04-09T11:58:37.81 8.24
2025-04-09T11:58:38.81 8.23
2025-04-09T11:58:39.81 8.21
2025-04-09T11:58:40.81 8.24
2025-04-09T11:58:41.81 8.23
2025-04-09T11:58:42.81 8.24
2025-04-09T11:58:43.81 8.24
2025-04-09T11:58:44.81 8.22
2025-04-09T11:58:45.81 8.24
2025-04-09T11:58:46.81 8.22
2025-04-09T11:58:47.81 8.24
2025-04-09T11:58:48.81 8.21
2025-04-09T11:58:49.81 8.23
2025-04-09T11:58:50.81 8.21
2025-04-09T11:58:51.81 8.22
2025-04-09T11:58:52.81 8.23
2025-04-09T11:58:53.81 8.23
2025-04-09T11:58:54.81 8.25
2025-04-09T11:58:55.81 8.24
2025-04-09T11:58:56.81 8.21
2025-04-09T11:58:57.81 8.21
2025-04-09T11:58:58.81 8.22
2025-04-09T11:58:59.81 8.23
2025-04-09T11:59:00.81 8.24
2025-04-09T11:59:01.81 8.24
2025-04-09T11:59:02.81 8.24
2025-04-09T11:59:03.81 8.23
2025-04-09T11:59:04.81 8.23
2025-04-09T11:59:05.81 8.24
2025-04-09T11:59:06.81 8.25
2025-04-09T11:59:07.81 8.21
2025-04-09T11:59:08.81 8.23
2025-04-09T11:59:09.81 8.24
2025-04-09T11:59:10.81 8.22
2025-04-09T11:59:11.81 8.23
2025-04-09T11:59:12.81 8.23
2025-04-09T11:59:13.81 8.21
2025-04-09T11:59:14.81 8.19
2025-04-09T11:59:15.81 8.24
2025-04-09T11:59:16.81 8.23
2025-04-09T11:59:17.81 8.23
2025-04-09T11:59:18.81 8.22
2025-04-09T11:59:19.81 8.23
2025-04-09T11:59:20.81 8.21
2025-04-09T11:59:21.81 8.26
2025-04-09T11:59:22.81 8.24
2025-04-09T11:59:23.81 8.24
2025-04-09T11:59:24.81 8.23
2025-04-09T11:59:25.81 8.25
2025-04-09T11:59:26.81 8.23
2025-04-09T11:59:27.81 8.22
2025-04-09T11:59:28.81 8.23
2025-04-09T11:59:29.81 8.25
2025-04-09T11:59:30.81 8.21
2025-04-09T11:59:31.81 8.25
2025-04-09T11:59:32.81 8.24
2025-04-09T11:59:33.81 8.21
2025-04-09T11:59:34.81 8.23
2025-04-09T11:59:35.81 8.23
2025-04-09T11:59:36.81 8.25
2025-04-09T11:59:37.81 8.23
2025-04-09T11:59:38.81 8.23
2025-04-09T11:59:39.81 8.24
2025-04-09T11:59:40.81 8.23
2025-04-09T11:59:41.81 8.22
2025-04-09T11:59:42.81 8.22
2025-04-09T11:59:43.81 8.25
2025-04-09T11:59:44.81 8.23
2025-04-09T11:59:45.81 8.24
2025-04-09T11:59:46.81 8.23
2025-04-09T11:59:47.81 8.23
2025-04-09T11:59:48.81 8.23
2025-04-09T11:59:49.81 8.22
2025-04-09T11:59:50.81 8.22
2025-04-09T11:59:51.81 8.22
2025-04-09T11:59:52.81 8.22
2025-04-09T11:59:53.81 8.21
2025-04-09T11:59:54.81 8.22
2025-04-09T11:59:55.81 8.23
2025-04-09T11:59:56.81 8.25
2025-04-09T11:59:57.81 8.24
2025-04-09T11:59:58.81 8.23
2025-04-09T11:59:59.81 8.23
