# PBO Tiltmeter Data, format version 1.1
# http://pboweb.unavco.org/strain_data
#
# B204 marble204bwa2007
# Latitude     : +46.1360 degrees (WGS-84)
# Longitude    : -122.1690 degrees (WGS-84)
# Elevation    : 784 meters (WGS-84)
# Sensor Depth : 3.05 meters
# SEED Codes   : PB B204 TT LKD
#
# Timestamp (UTC)   Temperature (C)
2025-04-13T14:00:00.59 8.26
2025-04-13T14:00:01.59 8.30
2025-04-13T14:00:02.59 8.28
2025-04-13T14:00:03.59 8.31
2025-04-13T14:00:04.59 8.28
2025-04-13T14:00:05.59 8.29
2025-04-13T14:00:06.59 8.30
2025-04-13T14:00:07.59 8.26
2025-04-13T14:00:08.59 8.30
2025-04-13T14:00:09.60 8.30
2025-04-13T14:00:10.60 8.30
2025-04-13T14:00:11.60 8.32
2025-04-13T14:00:12.60 8.26
2025-04-13T14:00:13.60 8.30
2025-04-13T14:00:14.60 8.30
2025-04-13T14:00:15.60 8.29
2025-04-13T14:00:16.60 8.30
2025-04-13T14:00:17.60 8.30
2025-04-13T14:00:18.60 8.32
2025-04-13T14:00:19.60 8.31
2025-04-13T14:00:20.60 8.30
2025-04-13T14:00:21.60 8.32
2025-04-13T14:00:22.60 8.28
2025-04-13T14:00:23.60 8.31
2025-04-13T14:00:24.60 8.29
2025-04-13T14:00:25.60 8.32
2025-04-13T14:00:26.60 8.29
2025-04-13T14:00:27.60 8.30
2025-04-13T14:00:28.60 8.32
2025-04-13T14:00:29.60 8.30
2025-04-13T14:00:30.60 8.30
2025-04-13T14:00:31.60 8.28
2025-04-13T14:00:32.60 8.30
2025-04-13T14:00:33.60 8.31
2025-04-13T14:00:34.60 8.30
2025-04-13T14:00:35.60 8.30
2025-04-13T14:00:36.60 8.30
2025-04-13T14:00:37.60 8.31
2025-04-13T14:00:38.60 8.30
2025-04-13T14:00:39.60 8.30
2025-04-13T14:00:40.60 8.28
2025-04-13T14:00:41.60 8.31
2025-04-13T14:00:42.60 8.31
2025-04-13T14:00:43.60 8.31
2025-04-13T14:00:44.60 8.31
2025-04-13T14:00:45.60 8.31
2025-04-13T14:00:46.60 8.31
2025-04-13T14:00:47.60 8.29
2025-04-13T14:00:48.60 8.28
2025-04-13T14:00:49.60 8.32
2025-04-13T14:00:50.60 8.28
2025-04-13T14:00:51.60 8.30
2025-04-13T14:00:52.60 8.28
2025-04-13T14:00:53.60 8.29
2025-04-13T14:00:54.60 8.28
2025-04-13T14:00:55.60 8.31
2025-04-13T14:00:56.60 8.30
2025-04-13T14:00:57.60 8.30
2025-04-13T14:00:58.60 8.31
2025-04-13T14:00:59.60 8.31
2025-04-13T14:01:00.60 8.30
2025-04-13T14:01:01.60 8.30
2025-04-13T14:01:02.60 8.32
2025-04-13T14:01:03.60 8.30
2025-04-13T14:01:04.60 8.30
2025-04-13T14:01:05.60 8.28
2025-04-13T14:01:06.60 8.30
2025-04-13T14:01:07.60 8.28
2025-04-13T14:01:08.60 8.31
2025-04-13T14:01:09.60 8.30
2025-04-13T14:01:10.60 8.32
2025-04-13T14:01:11.60 8.32
2025-04-13T14:01:12.60 8.28
2025-04-13T14:01:13.60 8.28
2025-04-13T14:01:14.60 8.28
2025-04-13T14:01:15.60 8.31
2025-04-13T14:01:16.60 8.30
2025-04-13T14:01:17.60 8.28
2025-04-13T14:01:18.60 8.30
2025-04-13T14:01:19.60 8.28
2025-04-13T14:01:20.60 8.30
2025-04-13T14:01:21.60 8.30
2025-04-13T14:01:22.60 8.30
2025-04-13T14:01:23.60 8.29
2025-04-13T14:01:24.60 8.29
2025-04-13T14:01:25.60 8.26
2025-04-13T14:01:26.60 8.30
2025-04-13T14:01:27.60 8.30
2025-04-13T14:01:28.60 8.30
2025-04-13T14:01:29.60 8.31
2025-04-13T14:01:30.60 8.29
2025-04-13T14:01:31.60 8.28
2025-04-13T14:01:32.60 8.28
2025-04-13T14:01:33.60 8.28
2025-04-13T14:01:34.60 8.30
2025-04-13T14:01:35.60 8.30
2025-04-13T14:01:36.61 8.30
2025-04-13T14:01:37.61 8.31
2025-04-13T14:01:38.61 8.28
2025-04-13T14:01:39.61 8.28
2025-04-13T14:01:40.61 8.30
2025-04-13T14:01:41.61 8.28
2025-04-13T14:01:42.61 8.28
2025-04-13T14:01:43.61 8.30
2025-04-13T14:01:44.61 8.30
2025-04-13T14:01:45.61 8.30
2025-04-13T14:01:46.61 8.29
2025-04-13T14:01:47.61 8.31
2025-04-13T14:01:48.61 8.31
2025-04-13T14:01:49.61 8.30
2025-04-13T14:01:50.61 8.31
2025-04-13T14:01:51.61 8.28
2025-04-13T14:01:52.61 8.28
2025-04-13T14:01:53.61 8.30
2025-04-13T14:01:54.61 8.32
2025-04-13T14:01:55.61 8.28
2025-04-13T14:01:56.61 8.30
2025-04-13T14:01:57.61 8.30
2025-04-13T14:01:58.61 8.27
2025-04-13T14:01:59.61 8.30
2025-04-13T14:02:00.61 8.28
2025-04-13T14:02:01.61 8.29
2025-04-13T14:02:02.61 8.29
2025-04-13T14:02:03.61 8.28
2025-04-13T14:02:04.61 8.30
2025-04-13T14:02:05.61 8.28
2025-04-13T14:02:06.61 8.31
2025-04-13T14:02:07.61 8.33
2025-04-13T14:02:08.61 8.30
2025-04-13T14:02:09.61 8.28
2025-04-13T14:02:10.61 8.29
2025-04-13T14:02:11.61 8.28
2025-04-13T14:02:12.61 8.28
2025-04-13T14:02:13.61 8.30
2025-04-13T14:02:14.61 8.30
2025-04-13T14:02:15.61 8.30
2025-04-13T14:02:16.61 8.30
2025-04-13T14:02:17.61 8.29
2025-04-13T14:02:18.61 8.31
2025-04-13T14:02:19.61 8.31
2025-04-13T14:02:20.61 8.30
2025-04-13T14:02:21.61 8.28
2025-04-13T14:02:22.61 8.32
2025-04-13T14:02:23.61 8.30
2025-04-13T14:02:24.61 8.31
2025-04-13T14:02:25.61 8.28
2025-04-13T14:02:26.61 8.31
2025-04-13T14:02:27.61 8.29
2025-04-13T14:02:28.61 8.29
2025-04-13T14:02:29.61 8.30
2025-04-13T14:02:30.61 8.29
2025-04-13T14:02:31.61 8.30
2025-04-13T14:02:32.61 8.29
2025-04-13T14:02:33.61 8.29
2025-04-13T14:02:34.61 8.29
2025-04-13T14:02:35.61 8.30
2025-04-13T14:02:36.61 8.28
2025-04-13T14:02:37.61 8.30
2025-04-13T14:02:38.61 8.28
2025-04-13T14:02:39.61 8.30
2025-04-13T14:02:40.61 8.32
2025-04-13T14:02:41.61 8.28
2025-04-13T14:02:42.61 8.32
2025-04-13T14:02:43.61 8.30
2025-04-13T14:02:44.61 8.31
2025-04-13T14:02:45.61 8.30
2025-04-13T14:02:46.61 8.30
2025-04-13T14:02:47.61 8.31
2025-04-13T14:02:48.61 8.30
2025-04-13T14:02:49.61 8.31
2025-04-13T14:02:50.61 8.31
2025-04-13T14:02:51.61 8.30
2025-04-13T14:02:52.61 8.32
2025-04-13T14:02:53.61 8.32
2025-04-13T14:02:54.61 8.31
2025-04-13T14:02:55.61 8.31
2025-04-13T14:02:56.61 8.29
2025-04-13T14:02:57.61 8.30
2025-04-13T14:02:58.61 8.28
2025-04-13T14:02:59.61 8.32
2025-04-13T14:03:00.61 8.30
2025-04-13T14:03:01.61 8.29
2025-04-13T14:03:02.61 8.30
2025-04-13T14:03:03.61 8.31
2025-04-13T14:03:04.61 8.32
2025-04-13T14:03:05.61 8.29
2025-04-13T14:03:06.61 8.30
2025-04-13T14:03:07.61 8.28
2025-04-13T14:03:08.61 8.29
2025-04-13T14:03:09.61 8.31
2025-04-13T14:03:10.61 8.28
2025-04-13T14:03:11.61 8.30
2025-04-13T14:03:12.61 8.30
2025-04-13T14:03:13.61 8.30
2025-04-13T14:03:14.61 8.30
2025-04-13T14:03:15.61 8.32
2025-04-13T14:03:16.61 8.30
2025-04-13T14:03:17.61 8.30
2025-04-13T14:03:18.61 8.30
2025-04-13T14:03:19.61 8.27
2025-04-13T14:03:20.61 8.30
2025-04-13T14:03:21.61 8.29
2025-04-13T14:03:22.61 8.29
2025-04-13T14:03:23.61 8.31
2025-04-13T14:03:24.61 8.30
2025-04-13T14:03:25.61 8.32
2025-04-13T14:03:26.61 8.28
2025-04-13T14:03:27.61 8.30
2025-04-13T14:03:28.61 8.28
2025-04-13T14:03:29.61 8.32
2025-04-13T14:03:30.61 8.30
2025-04-13T14:03:31.61 8.31
2025-04-13T14:03:32.61 8.28
2025-04-13T14:03:33.61 8.28
2025-04-13T14:03:34.61 8.28
2025-04-13T14:03:35.61 8.31
2025-04-13T14:03:36.61 8.30
2025-04-13T14:03:37.61 8.29
2025-04-13T14:03:38.61 8.30
2025-04-13T14:03:39.61 8.28
2025-04-13T14:03:40.61 8.29
2025-04-13T14:03:41.61 8.32
2025-04-13T14:03:42.61 8.30
2025-04-13T14:03:43.61 8.30
2025-04-13T14:03:44.61 8.29
2025-04-13T14:03:45.61 8.29
2025-04-13T14:03:46.61 8.30
2025-04-13T14:03:47.61 8.28
2025-04-13T14:03:48.61 8.29
2025-04-13T14:03:49.61 8.28
2025-04-13T14:03:50.61 8.29
2025-04-13T14:03:51.61 8.29
2025-04-13T14:03:52.61 8.30
2025-04-13T14:03:53.61 8.31
2025-04-13T14:03:54.61 8.32
2025-04-13T14:03:55.61 8.31
2025-04-13T14:03:56.61 8.28
2025-04-13T14:03:57.61 8.27
2025-04-13T14:03:58.61 8.28
2025-04-13T14:03:59.61 8.30
2025-04-13T14:04:00.61 8.30
2025-04-13T14:04:01.61 8.30
2025-04-13T14:04:02.61 8.30
2025-04-13T14:04:03.61 8.30
2025-04-13T14:04:04.61 8.30
2025-04-13T14:04:05.61 8.32
2025-04-13T14:04:06.61 8.28
2025-04-13T14:04:07.61 8.31
2025-04-13T14:04:08.61 8.28
2025-04-13T14:04:09.61 8.30
2025-04-13T14:04:10.61 8.29
2025-04-13T14:04:11.61 8.30
2025-04-13T14:04:12.61 8.30
2025-04-13T14:04:13.61 8.30
2025-04-13T14:04:14.61 8.28
2025-04-13T14:04:15.61 8.29
2025-04-13T14:04:16.61 8.31
2025-04-13T14:04:17.61 8.30
2025-04-13T14:04:18.61 8.28
2025-04-13T14:04:19.61 8.30
2025-04-13T14:04:20.61 8.30
2025-04-13T14:04:21.61 8.30
2025-04-13T14:04:22.61 8.29
2025-04-13T14:04:23.61 8.31
2025-04-13T14:04:24.61 8.30
2025-04-13T14:04:25.61 8.30
2025-04-13T14:04:26.61 8.27
2025-04-13T14:04:27.61 8.31
2025-04-13T14:04:28.61 8.31
2025-04-13T14:04:29.61 8.32
2025-04-13T14:04:30.61 8.30
2025-04-13T14:04:31.61 8.30
2025-04-13T14:04:32.61 8.29
2025-04-13T14:04:33.61 8.28
2025-04-13T14:04:34.61 8.29
2025-04-13T14:04:35.61 8.29
2025-04-13T14:04:36.61 8.30
2025-04-13T14:04:37.61 8.29
2025-04-13T14:04:38.61 8.28
2025-04-13T14:04:39.61 8.26
2025-04-13T14:04:40.61 8.30
2025-04-13T14:04:41.61 8.30
2025-04-13T14:04:42.61 8.30
2025-04-13T14:04:43.61 8.30
2025-04-13T14:04:44.61 8.32
2025-04-13T14:04:45.61 8.30
2025-04-13T14:04:46.61 8.28
2025-04-13T14:04:47.61 8.30
2025-04-13T14:04:48.61 8.28
2025-04-13T14:04:49.61 8.30
2025-04-13T14:04:50.61 8.30
2025-04-13T14:04:51.61 8.30
2025-04-13T14:04:52.61 8.29
2025-04-13T14:04:53.61 8.30
2025-04-13T14:04:54.61 8.32
2025-04-13T14:04:55.61 8.30
2025-04-13T14:04:56.61 8.28
2025-04-13T14:04:57.61 8.29
2025-04-13T14:04:58.61 8.29
2025-04-13T14:04:59.61 8.27
2025-04-13T14:05:00.61 8.32
2025-04-13T14:05:01.61 8.30
2025-04-13T14:05:02.61 8.28
2025-04-13T14:05:03.61 8.31
2025-04-13T14:05:04.61 8.33
2025-04-13T14:05:05.62 8.30
2025-04-13T14:05:06.61 8.32
2025-04-13T14:05:07.61 8.31
2025-04-13T14:05:08.61 8.30
2025-04-13T14:05:09.61 8.29
2025-04-13T14:05:10.61 8.30
2025-04-13T14:05:11.61 8.28
2025-04-13T14:05:12.61 8.30
2025-04-13T14:05:13.61 8.29
2025-04-13T14:05:14.61 8.29
2025-04-13T14:05:15.61 8.27
2025-04-13T14:05:16.61 8.30
2025-04-13T14:05:17.61 8.32
2025-04-13T14:05:18.61 8.28
2025-04-13T14:05:19.61 8.28
2025-04-13T14:05:20.61 8.28
2025-04-13T14:05:21.61 8.28
2025-04-13T14:05:22.61 8.29
2025-04-13T14:05:23.61 8.29
2025-04-13T14:05:24.61 8.30
2025-04-13T14:05:25.61 8.28
2025-04-13T14:05:26.61 8.32
2025-04-13T14:05:27.62 8.29
2025-04-13T14:05:28.62 8.30
2025-04-13T14:05:29.62 8.30
2025-04-13T14:05:30.62 8.28
2025-04-13T14:05:31.62 8.29
2025-04-13T14:05:32.62 8.31
2025-04-13T14:05:33.62 8.31
2025-04-13T14:05:34.62 8.27
2025-04-13T14:05:35.62 8.29
2025-04-13T14:05:36.62 8.30
2025-04-13T14:05:37.62 8.30
2025-04-13T14:05:38.62 8.28
2025-04-13T14:05:39.62 8.31
2025-04-13T14:05:40.62 8.32
2025-04-13T14:05:41.62 8.30
2025-04-13T14:05:42.62 8.32
2025-04-13T14:05:43.62 8.29
2025-04-13T14:05:44.62 8.30
2025-04-13T14:05:45.62 8.30
2025-04-13T14:05:46.62 8.29
2025-04-13T14:05:47.62 8.30
2025-04-13T14:05:48.62 8.30
2025-04-13T14:05:49.62 8.30
2025-04-13T14:05:50.62 8.31
2025-04-13T14:05:51.62 8.30
2025-04-13T14:05:52.62 8.28
2025-04-13T14:05:53.62 8.29
2025-04-13T14:05:54.62 8.29
2025-04-13T14:05:55.62 8.29
2025-04-13T14:05:56.62 8.28
2025-04-13T14:05:57.62 8.30
2025-04-13T14:05:58.62 8.31
2025-04-13T14:05:59.62 8.31
2025-04-13T14:06:00.62 8.31
2025-04-13T14:06:01.62 8.29
2025-04-13T14:06:02.62 8.26
2025-04-13T14:06:03.62 8.28
2025-04-13T14:06:04.62 8.30
2025-04-13T14:06:05.62 8.28
2025-04-13T14:06:06.62 8.28
2025-04-13T14:06:07.62 8.30
2025-04-13T14:06:08.62 8.28
2025-04-13T14:06:09.62 8.28
2025-04-13T14:06:10.62 8.28
2025-04-13T14:06:11.62 8.31
2025-04-13T14:06:12.62 8.30
2025-04-13T14:06:13.62 8.28
2025-04-13T14:06:14.62 8.30
2025-04-13T14:06:15.62 8.28
2025-04-13T14:06:16.62 8.26
2025-04-13T14:06:17.62 8.29
2025-04-13T14:06:18.62 8.30
2025-04-13T14:06:19.62 8.31
2025-04-13T14:06:20.62 8.28
2025-04-13T14:06:21.62 8.30
2025-04-13T14:06:22.62 8.30
2025-04-13T14:06:23.62 8.30
2025-04-13T14:06:24.62 8.29
2025-04-13T14:06:25.62 8.29
2025-04-13T14:06:26.62 8.31
2025-04-13T14:06:27.62 8.29
2025-04-13T14:06:28.62 8.30
2025-04-13T14:06:29.62 8.30
2025-04-13T14:06:30.62 8.30
2025-04-13T14:06:31.62 8.30
2025-04-13T14:06:32.62 8.31
2025-04-13T14:06:33.62 8.28
2025-04-13T14:06:34.62 8.28
2025-04-13T14:06:35.62 8.31
2025-04-13T14:06:36.62 8.32
2025-04-13T14:06:37.62 8.27
2025-04-13T14:06:38.62 8.28
2025-04-13T14:06:39.62 8.32
2025-04-13T14:06:40.62 8.32
2025-04-13T14:06:41.62 8.28
2025-04-13T14:06:42.62 8.29
2025-04-13T14:06:43.62 8.29
2025-04-13T14:06:44.62 8.30
2025-04-13T14:06:45.62 8.30
2025-04-13T14:06:46.62 8.28
2025-04-13T14:06:47.62 8.30
2025-04-13T14:06:48.62 8.32
2025-04-13T14:06:49.62 8.29
2025-04-13T14:06:50.62 8.30
2025-04-13T14:06:51.62 8.26
2025-04-13T14:06:52.62 8.33
2025-04-13T14:06:53.62 8.33
2025-04-13T14:06:54.62 8.30
2025-04-13T14:06:55.62 8.32
2025-04-13T14:06:56.62 8.29
2025-04-13T14:06:57.62 8.29
2025-04-13T14:06:58.62 8.30
2025-04-13T14:06:59.62 8.28
2025-04-13T14:07:00.62 8.32
2025-04-13T14:07:01.62 8.28
2025-04-13T14:07:02.62 8.30
2025-04-13T14:07:03.62 8.29
2025-04-13T14:07:04.62 8.33
2025-04-13T14:07:05.62 8.29
2025-04-13T14:07:06.62 8.29
2025-04-13T14:07:07.62 8.28
2025-04-13T14:07:08.62 8.30
2025-04-13T14:07:09.62 8.30
2025-04-13T14:07:10.62 8.28
2025-04-13T14:07:11.62 8.28
2025-04-13T14:07:12.62 8.28
2025-04-13T14:07:13.62 8.30
2025-04-13T14:07:14.62 8.30
2025-04-13T14:07:15.62 8.28
2025-04-13T14:07:16.62 8.30
2025-04-13T14:07:17.62 8.31
2025-04-13T14:07:18.62 8.26
2025-04-13T14:07:19.62 8.29
2025-04-13T14:07:20.62 8.30
2025-04-13T14:07:21.62 8.28
2025-04-13T14:07:22.62 8.30
2025-04-13T14:07:23.62 8.29
2025-04-13T14:07:24.62 8.33
2025-04-13T14:07:25.62 8.30
2025-04-13T14:07:26.62 8.31
2025-04-13T14:07:27.62 8.30
2025-04-13T14:07:28.62 8.30
2025-04-13T14:07:29.62 8.27
2025-04-13T14:07:30.62 8.31
2025-04-13T14:07:31.62 8.27
2025-04-13T14:07:32.62 8.29
2025-04-13T14:07:33.62 8.30
2025-04-13T14:07:34.62 8.31
2025-04-13T14:07:35.62 8.31
2025-04-13T14:07:36.62 8.30
2025-04-13T14:07:37.62 8.28
2025-04-13T14:07:38.62 8.30
2025-04-13T14:07:39.62 8.29
2025-04-13T14:07:40.62 8.29
2025-04-13T14:07:41.62 8.32
2025-04-13T14:07:42.62 8.30
2025-04-13T14:07:43.62 8.29
2025-04-13T14:07:44.62 8.30
2025-04-13T14:07:45.62 8.29
2025-04-13T14:07:46.62 8.30
2025-04-13T14:07:47.62 8.30
2025-04-13T14:07:48.62 8.29
2025-04-13T14:07:49.62 8.31
2025-04-13T14:07:50.62 8.28
2025-04-13T14:07:51.62 8.28
2025-04-13T14:07:52.62 8.28
2025-04-13T14:07:53.62 8.30
2025-04-13T14:07:54.62 8.30
2025-04-13T14:07:55.62 8.31
2025-04-13T14:07:56.62 8.28
2025-04-13T14:07:57.62 8.32
2025-04-13T14:07:58.62 8.28
2025-04-13T14:07:59.62 8.30
2025-04-13T14:08:00.62 8.32
2025-04-13T14:08:01.62 8.30
2025-04-13T14:08:02.62 8.31
2025-04-13T14:08:03.62 8.28
2025-04-13T14:08:04.62 8.28
2025-04-13T14:08:05.62 8.28
2025-04-13T14:08:06.62 8.30
2025-04-13T14:08:07.62 8.32
2025-04-13T14:08:08.62 8.31
2025-04-13T14:08:09.62 8.29
2025-04-13T14:08:10.62 8.27
2025-04-13T14:08:11.62 8.27
2025-04-13T14:08:12.62 8.30
2025-04-13T14:08:13.62 8.28
2025-04-13T14:08:14.62 8.30
2025-04-13T14:08:15.62 8.30
2025-04-13T14:08:16.62 8.30
2025-04-13T14:08:17.62 8.28
2025-04-13T14:08:18.62 8.30
2025-04-13T14:08:19.62 8.30
2025-04-13T14:08:20.62 8.29
2025-04-13T14:08:21.62 8.28
2025-04-13T14:08:22.62 8.33
2025-04-13T14:08:23.62 8.28
2025-04-13T14:08:24.62 8.28
2025-04-13T14:08:25.62 8.30
2025-04-13T14:08:26.62 8.30
2025-04-13T14:08:27.62 8.30
2025-04-13T14:08:28.62 8.29
2025-04-13T14:08:29.62 8.30
2025-04-13T14:08:30.62 8.30
2025-04-13T14:08:31.62 8.29
2025-04-13T14:08:32.62 8.28
2025-04-13T14:08:33.62 8.28
2025-04-13T14:08:34.62 8.30
2025-04-13T14:08:35.62 8.29
2025-04-13T14:08:36.62 8.31
2025-04-13T14:08:37.62 8.29
2025-04-13T14:08:38.62 8.29
2025-04-13T14:08:39.62 8.31
2025-04-13T14:08:40.62 8.31
2025-04-13T14:08:41.62 8.30
2025-04-13T14:08:42.62 8.29
2025-04-13T14:08:43.62 8.28
2025-04-13T14:08:44.62 8.29
2025-04-13T14:08:45.62 8.29
2025-04-13T14:08:46.62 8.32
2025-04-13T14:08:47.62 8.29
2025-04-13T14:08:48.62 8.29
2025-04-13T14:08:49.62 8.29
2025-04-13T14:08:50.62 8.30
2025-04-13T14:08:51.62 8.29
2025-04-13T14:08:52.62 8.29
2025-04-13T14:08:53.62 8.27
2025-04-13T14:08:54.62 8.30
2025-04-13T14:08:55.62 8.32
2025-04-13T14:08:56.62 8.30
2025-04-13T14:08:57.62 8.31
2025-04-13T14:08:58.62 8.30
2025-04-13T14:08:59.62 8.29
2025-04-13T14:09:00.62 8.30
2025-04-13T14:09:01.62 8.32
2025-04-13T14:09:02.62 8.30
2025-04-13T14:09:03.62 8.29
2025-04-13T14:09:04.62 8.31
2025-04-13T14:09:05.62 8.30
2025-04-13T14:09:06.62 8.30
2025-04-13T14:09:07.62 8.30
2025-04-13T14:09:08.62 8.29
2025-04-13T14:09:09.62 8.32
2025-04-13T14:09:10.62 8.28
2025-04-13T14:09:11.62 8.30
2025-04-13T14:09:12.62 8.29
2025-04-13T14:09:13.62 8.30
2025-04-13T14:09:14.62 8.29
2025-04-13T14:09:15.62 8.29
2025-04-13T14:09:16.62 8.30
2025-04-13T14:09:17.62 8.30
2025-04-13T14:09:18.62 8.30
2025-04-13T14:09:19.62 8.30
2025-04-13T14:09:20.62 8.28
2025-04-13T14:09:21.62 8.30
2025-04-13T14:09:22.62 8.31
2025-04-13T14:09:23.62 8.31
2025-04-13T14:09:24.62 8.30
2025-04-13T14:09:25.63 8.30
2025-04-13T14:09:26.61 8.30
2025-04-13T14:09:27.61 8.30
2025-04-13T14:09:28.61 8.31
2025-04-13T14:09:29.61 8.30
2025-04-13T14:09:30.61 8.29
2025-04-13T14:09:31.61 8.30
2025-04-13T14:09:32.61 8.26
2025-04-13T14:09:33.61 8.30
2025-04-13T14:09:34.61 8.30
2025-04-13T14:09:35.61 8.28
2025-04-13T14:09:36.61 8.30
2025-04-13T14:09:37.61 8.30
2025-04-13T14:09:38.61 8.30
2025-04-13T14:09:39.61 8.32
2025-04-13T14:09:40.61 8.28
2025-04-13T14:09:41.61 8.30
2025-04-13T14:09:42.61 8.31
2025-04-13T14:09:43.61 8.30
2025-04-13T14:09:44.61 8.32
2025-04-13T14:09:45.62 8.30
2025-04-13T14:09:46.61 8.28
2025-04-13T14:09:47.61 8.30
2025-04-13T14:09:48.61 8.32
2025-04-13T14:09:49.61 8.30
2025-04-13T14:09:50.61 8.31
2025-04-13T14:09:51.61 8.30
2025-04-13T14:09:52.61 8.31
2025-04-13T14:09:53.61 8.30
2025-04-13T14:09:54.61 8.31
2025-04-13T14:09:55.62 8.28
2025-04-13T14:09:56.61 8.30
2025-04-13T14:09:57.61 8.29
2025-04-13T14:09:58.61 8.32
2025-04-13T14:09:59.61 8.31
2025-04-13T14:10:00.61 8.30
2025-04-13T14:10:01.61 8.30
2025-04-13T14:10:02.61 8.29
2025-04-13T14:10:03.61 8.31
2025-04-13T14:10:04.61 8.29
2025-04-13T14:10:05.61 8.30
2025-04-13T14:10:06.61 8.31
2025-04-13T14:10:07.61 8.30
2025-04-13T14:10:08.61 8.30
2025-04-13T14:10:09.61 8.29
2025-04-13T14:10:10.61 8.29
2025-04-13T14:10:11.61 8.30
2025-04-13T14:10:12.61 8.29
2025-04-13T14:10:13.61 8.29
2025-04-13T14:10:14.61 8.31
2025-04-13T14:10:15.62 8.28
2025-04-13T14:10:16.61 8.32
2025-04-13T14:10:17.61 8.31
2025-04-13T14:10:18.61 8.31
2025-04-13T14:10:19.61 8.31
2025-04-13T14:10:20.61 8.30
2025-04-13T14:10:21.61 8.31
2025-04-13T14:10:22.61 8.30
2025-04-13T14:10:23.61 8.29
2025-04-13T14:10:24.61 8.32
2025-04-13T14:10:25.62 8.30
2025-04-13T14:10:26.62 8.30
2025-04-13T14:10:27.62 8.28
2025-04-13T14:10:28.62 8.30
2025-04-13T14:10:29.62 8.30
2025-04-13T14:10:30.62 8.30
2025-04-13T14:10:31.62 8.28
2025-04-13T14:10:32.62 8.30
2025-04-13T14:10:33.62 8.30
2025-04-13T14:10:34.62 8.30
2025-04-13T14:10:35.63 8.29
2025-04-13T14:10:36.62 8.31
2025-04-13T14:10:37.62 8.31
2025-04-13T14:10:38.62 8.33
2025-04-13T14:10:39.62 8.30
2025-04-13T14:10:40.63 8.31
2025-04-13T14:10:41.62 8.30
2025-04-13T14:10:42.62 8.29
2025-04-13T14:10:43.62 8.29
2025-04-13T14:10:44.62 8.28
2025-04-13T14:10:45.63 8.29
2025-04-13T14:10:46.63 8.31
2025-04-13T14:10:47.63 8.31
2025-04-13T14:10:48.63 8.30
2025-04-13T14:10:49.63 8.28
2025-04-13T14:10:50.63 8.30
2025-04-13T14:10:51.63 8.30
2025-04-13T14:10:52.63 8.31
2025-04-13T14:10:53.63 8.30
2025-04-13T14:10:54.63 8.32
2025-04-13T14:10:55.63 8.28
2025-04-13T14:10:56.63 8.30
2025-04-13T14:10:57.63 8.30
2025-04-13T14:10:58.63 8.30
2025-04-13T14:10:59.63 8.30
2025-04-13T14:11:00.63 8.32
2025-04-13T14:11:01.63 8.30
2025-04-13T14:11:02.63 8.30
2025-04-13T14:11:03.63 8.30
2025-04-13T14:11:04.63 8.30
2025-04-13T14:11:05.63 8.30
2025-04-13T14:11:06.63 8.30
2025-04-13T14:11:07.63 8.32
2025-04-13T14:11:08.63 8.30
2025-04-13T14:11:09.63 8.32
2025-04-13T14:11:10.63 8.30
2025-04-13T14:11:11.63 8.30
2025-04-13T14:11:12.63 8.32
2025-04-13T14:11:13.63 8.30
2025-04-13T14:11:14.63 8.27
2025-04-13T14:11:15.63 8.30
2025-04-13T14:11:16.63 8.29
2025-04-13T14:11:17.63 8.32
2025-04-13T14:11:18.63 8.29
2025-04-13T14:11:19.63 8.30
2025-04-13T14:11:20.63 8.29
2025-04-13T14:11:21.63 8.30
2025-04-13T14:11:22.63 8.28
2025-04-13T14:11:23.63 8.28
2025-04-13T14:11:24.63 8.30
2025-04-13T14:11:25.63 8.30
2025-04-13T14:11:26.63 8.28
2025-04-13T14:11:27.63 8.31
2025-04-13T14:11:28.63 8.30
2025-04-13T14:11:29.63 8.31
2025-04-13T14:11:30.63 8.30
2025-04-13T14:11:31.64 8.31
2025-04-13T14:11:32.62 8.29
2025-04-13T14:11:33.62 8.28
2025-04-13T14:11:34.62 8.31
2025-04-13T14:11:35.62 8.30
2025-04-13T14:11:36.62 8.31
2025-04-13T14:11:37.62 8.31
2025-04-13T14:11:38.62 8.30
2025-04-13T14:11:39.62 8.31
2025-04-13T14:11:40.62 8.29
2025-04-13T14:11:41.62 8.30
2025-04-13T14:11:42.62 8.32
2025-04-13T14:11:43.62 8.31
2025-04-13T14:11:44.62 8.30
2025-04-13T14:11:45.63 8.30
2025-04-13T14:11:46.63 8.30
2025-04-13T14:11:47.63 8.30
2025-04-13T14:11:48.63 8.29
2025-04-13T14:11:49.63 8.29
2025-04-13T14:11:50.63 8.30
2025-04-13T14:11:51.63 8.30
2025-04-13T14:11:52.63 8.29
2025-04-13T14:11:53.63 8.28
2025-04-13T14:11:54.63 8.29
2025-04-13T14:11:55.63 8.30
2025-04-13T14:11:56.63 8.28
2025-04-13T14:11:57.63 8.28
2025-04-13T14:11:58.63 8.31
2025-04-13T14:11:59.63 8.28
2025-04-13T14:12:00.63 8.30
2025-04-13T14:12:01.63 8.32
2025-04-13T14:12:02.63 8.30
2025-04-13T14:12:03.63 8.28
2025-04-13T14:12:04.63 8.28
2025-04-13T14:12:05.63 8.29
2025-04-13T14:12:06.63 8.31
2025-04-13T14:12:07.63 8.28
2025-04-13T14:12:08.63 8.29
2025-04-13T14:12:09.63 8.28
2025-04-13T14:12:10.63 8.29
2025-04-13T14:12:11.63 8.28
2025-04-13T14:12:12.63 8.30
2025-04-13T14:12:13.63 8.30
2025-04-13T14:12:14.63 8.30
2025-04-13T14:12:15.63 8.30
2025-04-13T14:12:16.63 8.30
2025-04-13T14:12:17.63 8.29
2025-04-13T14:12:18.63 8.32
2025-04-13T14:12:19.63 8.31
2025-04-13T14:12:20.63 8.30
2025-04-13T14:12:21.63 8.32
2025-04-13T14:12:22.63 8.32
2025-04-13T14:12:23.63 8.30
2025-04-13T14:12:24.63 8.29
2025-04-13T14:12:25.63 8.30
2025-04-13T14:12:26.63 8.30
2025-04-13T14:12:27.63 8.28
2025-04-13T14:12:28.63 8.29
2025-04-13T14:12:29.63 8.30
2025-04-13T14:12:30.63 8.26
2025-04-13T14:12:31.63 8.30
2025-04-13T14:12:32.63 8.30
2025-04-13T14:12:33.63 8.28
2025-04-13T14:12:34.63 8.30
2025-04-13T14:12:35.63 8.30
2025-04-13T14:12:36.63 8.32
2025-04-13T14:12:37.63 8.30
2025-04-13T14:12:38.63 8.30
2025-04-13T14:12:39.63 8.31
2025-04-13T14:12:40.63 8.31
2025-04-13T14:12:41.63 8.30
2025-04-13T14:12:42.63 8.32
2025-04-13T14:12:43.63 8.32
2025-04-13T14:12:44.63 8.30
2025-04-13T14:12:45.63 8.28
2025-04-13T14:12:46.63 8.29
2025-04-13T14:12:47.63 8.30
2025-04-13T14:12:48.63 8.32
2025-04-13T14:12:49.63 8.29
2025-04-13T14:12:50.63 8.30
2025-04-13T14:12:51.63 8.30
2025-04-13T14:12:52.63 8.29
2025-04-13T14:12:53.63 8.30
2025-04-13T14:12:54.63 8.30
2025-04-13T14:12:55.63 8.32
2025-04-13T14:12:56.63 8.32
2025-04-13T14:12:57.63 8.30
2025-04-13T14:12:58.63 8.30
2025-04-13T14:12:59.63 8.29
2025-04-13T14:13:00.63 8.30
2025-04-13T14:13:01.63 8.30
2025-04-13T14:13:02.63 8.28
2025-04-13T14:13:03.63 8.30
2025-04-13T14:13:04.63 8.29
2025-04-13T14:13:05.63 8.30
2025-04-13T14:13:06.63 8.28
2025-04-13T14:13:07.63 8.32
2025-04-13T14:13:08.63 8.29
2025-04-13T14:13:09.63 8.31
2025-04-13T14:13:10.63 8.29
2025-04-13T14:13:11.63 8.29
2025-04-13T14:13:12.63 8.30
2025-04-13T14:13:13.63 8.29
2025-04-13T14:13:14.63 8.32
2025-04-13T14:13:15.63 8.31
2025-04-13T14:13:16.63 8.32
2025-04-13T14:13:17.63 8.27
2025-04-13T14:13:18.63 8.30
2025-04-13T14:13:19.63 8.27
2025-04-13T14:13:20.63 8.29
2025-04-13T14:13:21.63 8.31
2025-04-13T14:13:22.63 8.29
2025-04-13T14:13:23.63 8.27
2025-04-13T14:13:24.63 8.30
2025-04-13T14:13:25.63 8.28
2025-04-13T14:13:26.63 8.30
2025-04-13T14:13:27.63 8.29
2025-04-13T14:13:28.63 8.30
2025-04-13T14:13:29.63 8.28
2025-04-13T14:13:30.63 8.30
2025-04-13T14:13:31.63 8.30
2025-04-13T14:13:32.63 8.30
2025-04-13T14:13:33.63 8.30
2025-04-13T14:13:34.63 8.31
2025-04-13T14:13:35.63 8.30
2025-04-13T14:13:36.63 8.29
2025-04-13T14:13:37.63 8.29
2025-04-13T14:13:38.63 8.31
2025-04-13T14:13:39.63 8.28
2025-04-13T14:13:40.63 8.29
2025-04-13T14:13:41.63 8.31
2025-04-13T14:13:42.63 8.29
2025-04-13T14:13:43.63 8.29
2025-04-13T14:13:44.63 8.30
2025-04-13T14:13:45.63 8.30
2025-04-13T14:13:46.63 8.31
2025-04-13T14:13:47.63 8.30
2025-04-13T14:13:48.63 8.28
2025-04-13T14:13:49.63 8.31
2025-04-13T14:13:50.63 8.30
2025-04-13T14:13:51.63 8.33
2025-04-13T14:13:52.63 8.30
2025-04-13T14:13:53.63 8.28
2025-04-13T14:13:54.63 8.30
2025-04-13T14:13:55.63 8.28
2025-04-13T14:13:56.63 8.30
2025-04-13T14:13:57.63 8.30
2025-04-13T14:13:58.63 8.30
2025-04-13T14:13:59.63 8.30
2025-04-13T14:14:00.63 8.32
2025-04-13T14:14:01.63 8.30
2025-04-13T14:14:02.63 8.29
2025-04-13T14:14:03.63 8.31
2025-04-13T14:14:04.63 8.31
2025-04-13T14:14:05.63 8.30
2025-04-13T14:14:06.63 8.27
2025-04-13T14:14:07.63 8.31
2025-04-13T14:14:08.63 8.30
2025-04-13T14:14:09.63 8.29
2025-04-13T14:14:10.63 8.30
2025-04-13T14:14:11.63 8.32
2025-04-13T14:14:12.63 8.30
2025-04-13T14:14:13.63 8.29
2025-04-13T14:14:14.63 8.28
2025-04-13T14:14:15.63 8.30
2025-04-13T14:14:16.63 8.30
2025-04-13T14:14:17.63 8.30
2025-04-13T14:14:18.63 8.30
2025-04-13T14:14:19.63 8.29
2025-04-13T14:14:20.63 8.28
2025-04-13T14:14:21.63 8.29
2025-04-13T14:14:22.63 8.31
2025-04-13T14:14:23.63 8.30
2025-04-13T14:14:24.63 8.29
2025-04-13T14:14:25.63 8.31
2025-04-13T14:14:26.63 8.29
2025-04-13T14:14:27.63 8.28
2025-04-13T14:14:28.63 8.29
2025-04-13T14:14:29.63 8.30
2025-04-13T14:14:30.63 8.33
2025-04-13T14:14:31.64 8.29
2025-04-13T14:14:32.64 8.29
2025-04-13T14:14:33.64 8.32
2025-04-13T14:14:34.64 8.29
2025-04-13T14:14:35.64 8.29
2025-04-13T14:14:36.64 8.31
2025-04-13T14:14:37.64 8.30
2025-04-13T14:14:38.64 8.31
2025-04-13T14:14:39.64 8.30
2025-04-13T14:14:40.64 8.32
2025-04-13T14:14:41.64 8.29
2025-04-13T14:14:42.64 8.30
2025-04-13T14:14:43.64 8.29
2025-04-13T14:14:44.64 8.29
2025-04-13T14:14:45.64 8.31
2025-04-13T14:14:46.64 8.29
2025-04-13T14:14:47.64 8.30
2025-04-13T14:14:48.64 8.30
2025-04-13T14:14:49.64 8.31
2025-04-13T14:14:50.64 8.29
2025-04-13T14:14:51.64 8.28
2025-04-13T14:14:52.64 8.30
2025-04-13T14:14:53.64 8.31
2025-04-13T14:14:54.64 8.30
2025-04-13T14:14:55.64 8.32
2025-04-13T14:14:56.64 8.30
2025-04-13T14:14:57.64 8.29
2025-04-13T14:14:58.64 8.32
2025-04-13T14:14:59.64 8.29
2025-04-13T14:15:00.64 8.30
2025-04-13T14:15:01.64 8.30
2025-04-13T14:15:02.64 8.28
2025-04-13T14:15:03.64 8.30
2025-04-13T14:15:04.64 8.30
2025-04-13T14:15:05.64 8.28
2025-04-13T14:15:06.64 8.31
2025-04-13T14:15:07.64 8.28
2025-04-13T14:15:08.64 8.30
2025-04-13T14:15:09.64 8.32
2025-04-13T14:15:10.64 8.30
2025-04-13T14:15:11.64 8.28
2025-04-13T14:15:12.64 8.28
2025-04-13T14:15:13.64 8.30
2025-04-13T14:15:14.64 8.30
2025-04-13T14:15:15.64 8.28
2025-04-13T14:15:16.64 8.27
2025-04-13T14:15:17.64 8.29
2025-04-13T14:15:18.64 8.30
2025-04-13T14:15:19.64 8.29
2025-04-13T14:15:20.64 8.27
2025-04-13T14:15:21.64 8.32
2025-04-13T14:15:22.64 8.30
2025-04-13T14:15:23.64 8.29
2025-04-13T14:15:24.64 8.28
2025-04-13T14:15:25.64 8.29
2025-04-13T14:15:26.64 8.32
2025-04-13T14:15:27.64 8.28
2025-04-13T14:15:28.64 8.28
2025-04-13T14:15:29.64 8.30
2025-04-13T14:15:30.64 8.29
2025-04-13T14:15:31.64 8.30
2025-04-13T14:15:32.64 8.28
2025-04-13T14:15:33.64 8.28
2025-04-13T14:15:34.64 8.28
2025-04-13T14:15:35.64 8.31
2025-04-13T14:15:36.64 8.29
2025-04-13T14:15:37.64 8.26
2025-04-13T14:15:38.64 8.28
2025-04-13T14:15:39.64 8.30
2025-04-13T14:15:40.64 8.30
2025-04-13T14:15:41.64 8.29
2025-04-13T14:15:42.64 8.31
2025-04-13T14:15:43.64 8.28
2025-04-13T14:15:44.64 8.32
2025-04-13T14:15:45.64 8.31
2025-04-13T14:15:46.64 8.30
2025-04-13T14:15:47.64 8.28
2025-04-13T14:15:48.64 8.30
2025-04-13T14:15:49.64 8.29
2025-04-13T14:15:50.64 8.28
2025-04-13T14:15:51.64 8.31
2025-04-13T14:15:52.64 8.31
2025-04-13T14:15:53.64 8.32
2025-04-13T14:15:54.64 8.28
2025-04-13T14:15:55.64 8.29
2025-04-13T14:15:56.64 8.30
2025-04-13T14:15:57.64 8.30
2025-04-13T14:15:58.64 8.29
2025-04-13T14:15:59.64 8.29
2025-04-13T14:16:00.65 8.28
2025-04-13T14:16:01.64 8.30
2025-04-13T14:16:02.64 8.31
2025-04-13T14:16:03.64 8.30
2025-04-13T14:16:04.64 8.30
2025-04-13T14:16:05.65 8.28
2025-04-13T14:16:06.65 8.30
2025-04-13T14:16:07.65 8.29
2025-04-13T14:16:08.65 8.30
2025-04-13T14:16:09.65 8.30
2025-04-13T14:16:10.65 8.30
2025-04-13T14:16:11.65 8.30
2025-04-13T14:16:12.65 8.30
2025-04-13T14:16:13.65 8.29
2025-04-13T14:16:14.65 8.28
2025-04-13T14:16:15.65 8.30
2025-04-13T14:16:16.65 8.32
2025-04-13T14:16:17.65 8.30
2025-04-13T14:16:18.65 8.29
2025-04-13T14:16:19.65 8.30
2025-04-13T14:16:20.65 8.30
2025-04-13T14:16:21.65 8.30
2025-04-13T14:16:22.65 8.28
2025-04-13T14:16:23.65 8.30
2025-04-13T14:16:24.65 8.29
2025-04-13T14:16:25.65 8.29
2025-04-13T14:16:26.65 8.28
2025-04-13T14:16:27.65 8.28
2025-04-13T14:16:28.65 8.28
2025-04-13T14:16:29.65 8.30
2025-04-13T14:16:30.65 8.32
2025-04-13T14:16:31.65 8.30
2025-04-13T14:16:32.65 8.30
2025-04-13T14:16:33.65 8.30
2025-04-13T14:16:34.65 8.30
2025-04-13T14:16:35.65 8.32
2025-04-13T14:16:36.65 8.28
2025-04-13T14:16:37.65 8.30
2025-04-13T14:16:38.65 8.31
2025-04-13T14:16:39.65 8.30
2025-04-13T14:16:40.65 8.28
2025-04-13T14:16:41.65 8.29
2025-04-13T14:16:42.65 8.28
2025-04-13T14:16:43.65 8.29
2025-04-13T14:16:44.65 8.30
2025-04-13T14:16:45.65 8.30
2025-04-13T14:16:46.65 8.29
2025-04-13T14:16:47.65 8.28
2025-04-13T14:16:48.65 8.28
2025-04-13T14:16:49.65 8.28
2025-04-13T14:16:50.65 8.28
2025-04-13T14:16:51.65 8.28
2025-04-13T14:16:52.65 8.30
2025-04-13T14:16:53.65 8.28
2025-04-13T14:16:54.65 8.30
2025-04-13T14:16:55.65 8.32
2025-04-13T14:16:56.65 8.31
2025-04-13T14:16:57.65 8.31
2025-04-13T14:16:58.65 8.28
2025-04-13T14:16:59.65 8.29
2025-04-13T14:17:00.65 8.31
2025-04-13T14:17:01.65 8.31
2025-04-13T14:17:02.65 8.30
2025-04-13T14:17:03.65 8.30
2025-04-13T14:17:04.65 8.30
2025-04-13T14:17:05.65 8.32
2025-04-13T14:17:06.65 8.30
2025-04-13T14:17:07.65 8.28
2025-04-13T14:17:08.65 8.29
2025-04-13T14:17:09.65 8.29
2025-04-13T14:17:10.65 8.32
2025-04-13T14:17:11.65 8.28
2025-04-13T14:17:12.65 8.30
2025-04-13T14:17:13.65 8.30
2025-04-13T14:17:14.65 8.28
2025-04-13T14:17:15.65 8.30
2025-04-13T14:17:16.65 8.30
2025-04-13T14:17:17.65 8.30
2025-04-13T14:17:18.65 8.30
2025-04-13T14:17:19.65 8.28
2025-04-13T14:17:20.65 8.30
2025-04-13T14:17:21.65 8.29
2025-04-13T14:17:22.65 8.30
2025-04-13T14:17:23.65 8.29
2025-04-13T14:17:24.65 8.28
2025-04-13T14:17:25.65 8.31
2025-04-13T14:17:26.65 8.28
2025-04-13T14:17:27.65 8.30
2025-04-13T14:17:28.65 8.32
2025-04-13T14:17:29.65 8.28
2025-04-13T14:17:30.65 8.30
2025-04-13T14:17:31.65 8.31
2025-04-13T14:17:32.65 8.29
2025-04-13T14:17:33.65 8.32
2025-04-13T14:17:34.65 8.30
2025-04-13T14:17:35.65 8.32
2025-04-13T14:17:36.65 8.30
2025-04-13T14:17:37.65 8.32
2025-04-13T14:17:38.65 8.29
2025-04-13T14:17:39.65 8.33
2025-04-13T14:17:40.65 8.31
2025-04-13T14:17:41.65 8.30
2025-04-13T14:17:42.65 8.32
2025-04-13T14:17:43.65 8.30
2025-04-13T14:17:44.65 8.32
2025-04-13T14:17:45.65 8.30
2025-04-13T14:17:46.65 8.32
2025-04-13T14:17:47.65 8.30
2025-04-13T14:17:48.65 8.30
2025-04-13T14:17:49.65 8.26
2025-04-13T14:17:50.65 8.32
2025-04-13T14:17:51.65 8.30
2025-04-13T14:17:52.65 8.28
2025-04-13T14:17:53.65 8.30
2025-04-13T14:17:54.65 8.32
2025-04-13T14:17:55.65 8.31
2025-04-13T14:17:56.65 8.30
2025-04-13T14:17:57.65 8.30
2025-04-13T14:17:58.65 8.31
2025-04-13T14:17:59.65 8.30
2025-04-13T14:18:00.65 8.32
2025-04-13T14:18:01.65 8.31
2025-04-13T14:18:02.65 8.31
2025-04-13T14:18:03.65 8.32
2025-04-13T14:18:04.65 8.29
2025-04-13T14:18:05.65 8.31
2025-04-13T14:18:06.65 8.29
2025-04-13T14:18:07.65 8.28
2025-04-13T14:18:08.65 8.30
2025-04-13T14:18:09.65 8.30
2025-04-13T14:18:10.65 8.29
2025-04-13T14:18:11.65 8.27
2025-04-13T14:18:12.65 8.29
2025-04-13T14:18:13.65 8.28
2025-04-13T14:18:14.65 8.27
2025-04-13T14:18:15.65 8.32
2025-04-13T14:18:16.65 8.29
2025-04-13T14:18:17.65 8.29
2025-04-13T14:18:18.65 8.30
2025-04-13T14:18:19.65 8.28
2025-04-13T14:18:20.65 8.28
2025-04-13T14:18:21.65 8.28
2025-04-13T14:18:22.65 8.30
2025-04-13T14:18:23.66 8.30
2025-04-13T14:18:24.64 8.30
2025-04-13T14:18:25.64 8.28
2025-04-13T14:18:26.64 8.30
2025-04-13T14:18:27.64 8.30
2025-04-13T14:18:28.64 8.30
2025-04-13T14:18:29.64 8.29
2025-04-13T14:18:30.64 8.28
2025-04-13T14:18:31.64 8.30
2025-04-13T14:18:32.64 8.33
2025-04-13T14:18:33.64 8.30
2025-04-13T14:18:34.64 8.30
2025-04-13T14:18:35.65 8.29
2025-04-13T14:18:36.65 8.28
2025-04-13T14:18:37.65 8.28
2025-04-13T14:18:38.65 8.30
2025-04-13T14:18:39.65 8.28
2025-04-13T14:18:40.65 8.27
2025-04-13T14:18:41.65 8.28
2025-04-13T14:18:42.65 8.30
2025-04-13T14:18:43.65 8.32
2025-04-13T14:18:44.65 8.28
2025-04-13T14:18:45.65 8.30
2025-04-13T14:18:46.65 8.29
2025-04-13T14:18:47.65 8.29
2025-04-13T14:18:48.65 8.28
2025-04-13T14:18:49.65 8.31
2025-04-13T14:18:50.65 8.29
2025-04-13T14:18:51.65 8.30
2025-04-13T14:18:52.65 8.30
2025-04-13T14:18:53.65 8.30
2025-04-13T14:18:54.65 8.30
2025-04-13T14:18:55.65 8.31
2025-04-13T14:18:56.65 8.30
2025-04-13T14:18:57.65 8.28
2025-04-13T14:18:58.65 8.32
2025-04-13T14:18:59.65 8.29
2025-04-13T14:19:00.65 8.27
2025-04-13T14:19:01.65 8.30
2025-04-13T14:19:02.65 8.29
2025-04-13T14:19:03.65 8.31
2025-04-13T14:19:04.65 8.29
2025-04-13T14:19:05.65 8.28
2025-04-13T14:19:06.65 8.30
2025-04-13T14:19:07.65 8.29
2025-04-13T14:19:08.65 8.30
2025-04-13T14:19:09.65 8.28
2025-04-13T14:19:10.65 8.28
2025-04-13T14:19:11.65 8.30
2025-04-13T14:19:12.65 8.29
2025-04-13T14:19:13.65 8.26
2025-04-13T14:19:14.65 8.28
2025-04-13T14:19:15.65 8.30
2025-04-13T14:19:16.65 8.32
2025-04-13T14:19:17.65 8.30
2025-04-13T14:19:18.65 8.30
2025-04-13T14:19:19.65 8.30
2025-04-13T14:19:20.65 8.31
2025-04-13T14:19:21.65 8.28
2025-04-13T14:19:22.65 8.30
2025-04-13T14:19:23.65 8.30
2025-04-13T14:19:24.65 8.28
2025-04-13T14:19:25.65 8.29
2025-04-13T14:19:26.65 8.29
2025-04-13T14:19:27.65 8.28
2025-04-13T14:19:28.65 8.30
2025-04-13T14:19:29.65 8.28
2025-04-13T14:19:30.65 8.28
2025-04-13T14:19:31.65 8.30
2025-04-13T14:19:32.65 8.28
2025-04-13T14:19:33.65 8.28
2025-04-13T14:19:34.65 8.30
2025-04-13T14:19:35.66 8.31
2025-04-13T14:19:36.66 8.30
2025-04-13T14:19:37.66 8.28
2025-04-13T14:19:38.66 8.28
2025-04-13T14:19:39.66 8.28
2025-04-13T14:19:40.66 8.29
2025-04-13T14:19:41.66 8.30
2025-04-13T14:19:42.66 8.32
2025-04-13T14:19:43.66 8.27
2025-04-13T14:19:44.66 8.29
2025-04-13T14:19:45.66 8.30
2025-04-13T14:19:46.66 8.29
2025-04-13T14:19:47.66 8.30
2025-04-13T14:19:48.66 8.28
2025-04-13T14:19:49.66 8.28
2025-04-13T14:19:50.66 8.29
2025-04-13T14:19:51.66 8.29
2025-04-13T14:19:52.66 8.32
2025-04-13T14:19:53.66 8.26
2025-04-13T14:19:54.66 8.28
2025-04-13T14:19:55.66 8.28
2025-04-13T14:19:56.66 8.29
2025-04-13T14:19:57.66 8.29
2025-04-13T14:19:58.66 8.30
2025-04-13T14:19:59.66 8.31
2025-04-13T14:20:00.66 8.32
2025-04-13T14:20:01.66 8.30
2025-04-13T14:20:02.66 8.30
2025-04-13T14:20:03.66 8.30
2025-04-13T14:20:04.66 8.30
2025-04-13T14:20:05.66 8.30
2025-04-13T14:20:06.66 8.29
2025-04-13T14:20:07.66 8.32
2025-04-13T14:20:08.66 8.30
2025-04-13T14:20:09.66 8.32
2025-04-13T14:20:10.66 8.26
2025-04-13T14:20:11.66 8.30
2025-04-13T14:20:12.66 8.31
2025-04-13T14:20:13.66 8.28
2025-04-13T14:20:14.66 8.28
2025-04-13T14:20:15.66 8.28
2025-04-13T14:20:16.66 8.30
2025-04-13T14:20:17.66 8.31
2025-04-13T14:20:18.66 8.29
2025-04-13T14:20:19.66 8.28
2025-04-13T14:20:20.66 8.31
2025-04-13T14:20:21.66 8.29
2025-04-13T14:20:22.66 8.28
2025-04-13T14:20:23.66 8.30
2025-04-13T14:20:24.66 8.28
2025-04-13T14:20:25.66 8.28
2025-04-13T14:20:26.66 8.30
2025-04-13T14:20:27.66 8.30
2025-04-13T14:20:28.66 8.28
2025-04-13T14:20:29.66 8.29
2025-04-13T14:20:30.66 8.29
2025-04-13T14:20:31.66 8.30
2025-04-13T14:20:32.66 8.29
2025-04-13T14:20:33.66 8.30
2025-04-13T14:20:34.66 8.30
2025-04-13T14:20:35.66 8.30
2025-04-13T14:20:36.66 8.29
2025-04-13T14:20:37.66 8.30
2025-04-13T14:20:38.66 8.32
2025-04-13T14:20:39.66 8.31
2025-04-13T14:20:40.66 8.30
2025-04-13T14:20:41.66 8.30
2025-04-13T14:20:42.66 8.30
2025-04-13T14:20:43.66 8.31
2025-04-13T14:20:44.66 8.28
2025-04-13T14:20:45.66 8.30
2025-04-13T14:20:46.66 8.30
2025-04-13T14:20:47.66 8.30
2025-04-13T14:20:48.66 8.32
2025-04-13T14:20:49.66 8.30
2025-04-13T14:20:50.66 8.30
2025-04-13T14:20:51.66 8.31
2025-04-13T14:20:52.66 8.28
2025-04-13T14:20:53.66 8.31
2025-04-13T14:20:54.66 8.33
2025-04-13T14:20:55.66 8.30
2025-04-13T14:20:56.66 8.30
2025-04-13T14:20:57.66 8.30
2025-04-13T14:20:58.66 8.31
2025-04-13T14:20:59.66 8.30
2025-04-13T14:21:00.66 8.31
2025-04-13T14:21:01.66 8.30
2025-04-13T14:21:02.66 8.32
2025-04-13T14:21:03.66 8.29
2025-04-13T14:21:04.66 8.28
2025-04-13T14:21:05.66 8.29
2025-04-13T14:21:06.66 8.31
2025-04-13T14:21:07.66 8.32
2025-04-13T14:21:08.66 8.29
2025-04-13T14:21:09.66 8.28
2025-04-13T14:21:10.66 8.30
2025-04-13T14:21:11.66 8.31
2025-04-13T14:21:12.66 8.30
2025-04-13T14:21:13.66 8.30
2025-04-13T14:21:14.66 8.29
2025-04-13T14:21:15.66 8.29
2025-04-13T14:21:16.66 8.28
2025-04-13T14:21:17.66 8.27
2025-04-13T14:21:18.66 8.30
2025-04-13T14:21:19.66 8.30
2025-04-13T14:21:20.66 8.29
2025-04-13T14:21:21.66 8.30
2025-04-13T14:21:22.66 8.32
2025-04-13T14:21:23.67 8.30
2025-04-13T14:21:24.67 8.28
2025-04-13T14:21:25.67 8.31
2025-04-13T14:21:26.69 8.30
2025-04-13T14:21:27.67 8.30
2025-04-13T14:21:28.67 8.30
2025-04-13T14:21:29.67 8.30
2025-04-13T14:21:30.67 8.29
2025-04-13T14:21:31.67 8.30
2025-04-13T14:21:32.67 8.26
2025-04-13T14:21:33.67 8.28
2025-04-13T14:21:34.67 8.32
2025-04-13T14:21:35.67 8.25
2025-04-13T14:21:36.67 8.30
2025-04-13T14:21:37.67 8.30
2025-04-13T14:21:38.67 8.29
2025-04-13T14:21:39.67 8.29
2025-04-13T14:21:40.67 8.26
2025-04-13T14:21:41.67 8.30
2025-04-13T14:21:42.67 8.29
2025-04-13T14:21:43.67 8.29
2025-04-13T14:21:44.67 8.30
2025-04-13T14:21:45.67 8.30
2025-04-13T14:21:46.67 8.29
2025-04-13T14:21:47.67 8.32
2025-04-13T14:21:48.67 8.28
2025-04-13T14:21:49.67 8.30
2025-04-13T14:21:50.67 8.27
2025-04-13T14:21:51.67 8.30
2025-04-13T14:21:52.67 8.28
2025-04-13T14:21:53.67 8.30
2025-04-13T14:21:54.67 8.30
2025-04-13T14:21:55.67 8.29
2025-04-13T14:21:56.67 8.30
2025-04-13T14:21:57.67 8.29
2025-04-13T14:21:58.67 8.30
2025-04-13T14:21:59.67 8.31
2025-04-13T14:22:00.67 8.30
2025-04-13T14:22:01.67 8.28
2025-04-13T14:22:02.67 8.30
2025-04-13T14:22:03.67 8.30
2025-04-13T14:22:04.67 8.27
2025-04-13T14:22:05.67 8.29
2025-04-13T14:22:06.67 8.29
2025-04-13T14:22:07.67 8.30
2025-04-13T14:22:08.67 8.29
2025-04-13T14:22:09.67 8.31
2025-04-13T14:22:10.67 8.30
2025-04-13T14:22:11.67 8.29
2025-04-13T14:22:12.67 8.28
2025-04-13T14:22:13.67 8.31
2025-04-13T14:22:14.67 8.30
2025-04-13T14:22:15.68 8.30
2025-04-13T14:22:16.66 8.30
2025-04-13T14:22:17.66 8.30
2025-04-13T14:22:18.66 8.32
2025-04-13T14:22:19.66 8.30
2025-04-13T14:22:20.66 8.30
2025-04-13T14:22:21.66 8.32
2025-04-13T14:22:22.66 8.30
2025-04-13T14:22:23.66 8.32
2025-04-13T14:22:24.66 8.28
2025-04-13T14:22:25.66 8.29
2025-04-13T14:22:26.66 8.32
2025-04-13T14:22:27.66 8.30
2025-04-13T14:22:28.66 8.29
2025-04-13T14:22:29.66 8.28
2025-04-13T14:22:30.66 8.31
2025-04-13T14:22:31.66 8.29
2025-04-13T14:22:32.66 8.29
2025-04-13T14:22:33.66 8.32
2025-04-13T14:22:34.66 8.29
2025-04-13T14:22:35.66 8.30
2025-04-13T14:22:36.66 8.29
2025-04-13T14:22:37.66 8.31
2025-04-13T14:22:38.66 8.29
2025-04-13T14:22:39.66 8.32
2025-04-13T14:22:40.66 8.33
2025-04-13T14:22:41.66 8.31
2025-04-13T14:22:42.66 8.30
2025-04-13T14:22:43.66 8.30
2025-04-13T14:22:44.66 8.28
2025-04-13T14:22:45.66 8.31
2025-04-13T14:22:46.66 8.30
2025-04-13T14:22:47.66 8.29
2025-04-13T14:22:48.66 8.30
2025-04-13T14:22:49.66 8.31
2025-04-13T14:22:50.66 8.31
2025-04-13T14:22:51.66 8.29
2025-04-13T14:22:52.66 8.30
2025-04-13T14:22:53.66 8.29
2025-04-13T14:22:54.66 8.30
2025-04-13T14:22:55.66 8.28
2025-04-13T14:22:56.66 8.30
2025-04-13T14:22:57.66 8.30
2025-04-13T14:22:58.66 8.30
2025-04-13T14:22:59.66 8.28
2025-04-13T14:23:00.66 8.30
2025-04-13T14:23:01.66 8.28
2025-04-13T14:23:02.66 8.28
2025-04-13T14:23:03.66 8.30
2025-04-13T14:23:04.66 8.29
2025-04-13T14:23:05.66 8.30
2025-04-13T14:23:06.66 8.31
2025-04-13T14:23:07.66 8.30
2025-04-13T14:23:08.66 8.32
2025-04-13T14:23:09.66 8.30
2025-04-13T14:23:10.66 8.30
2025-04-13T14:23:11.66 8.30
2025-04-13T14:23:12.66 8.30
2025-04-13T14:23:13.66 8.32
2025-04-13T14:23:14.66 8.30
2025-04-13T14:23:15.66 8.30
2025-04-13T14:23:16.66 8.30
2025-04-13T14:23:17.66 8.31
2025-04-13T14:23:18.66 8.30
2025-04-13T14:23:19.66 8.29
2025-04-13T14:23:20.66 8.28
2025-04-13T14:23:21.66 8.29
2025-04-13T14:23:22.66 8.29
2025-04-13T14:23:23.66 8.30
2025-04-13T14:23:24.66 8.30
2025-04-13T14:23:25.66 8.32
2025-04-13T14:23:26.66 8.29
2025-04-13T14:23:27.66 8.27
2025-04-13T14:23:28.66 8.30
2025-04-13T14:23:29.66 8.32
2025-04-13T14:23:30.66 8.30
2025-04-13T14:23:31.66 8.30
2025-04-13T14:23:32.66 8.28
2025-04-13T14:23:33.66 8.28
2025-04-13T14:23:34.66 8.32
2025-04-13T14:23:35.66 8.30
2025-04-13T14:23:36.66 8.26
2025-04-13T14:23:37.66 8.30
2025-04-13T14:23:38.66 8.30
2025-04-13T14:23:39.66 8.28
2025-04-13T14:23:40.66 8.31
2025-04-13T14:23:41.66 8.30
2025-04-13T14:23:42.66 8.30
2025-04-13T14:23:43.66 8.28
2025-04-13T14:23:44.66 8.30
2025-04-13T14:23:45.66 8.31
2025-04-13T14:23:46.66 8.31
2025-04-13T14:23:47.66 8.30
2025-04-13T14:23:48.66 8.32
2025-04-13T14:23:49.66 8.33
2025-04-13T14:23:50.66 8.30
2025-04-13T14:23:51.66 8.29
2025-04-13T14:23:52.66 8.30
2025-04-13T14:23:53.66 8.28
2025-04-13T14:23:54.66 8.30
2025-04-13T14:23:55.66 8.32
2025-04-13T14:23:56.66 8.32
2025-04-13T14:23:57.66 8.30
2025-04-13T14:23:58.66 8.29
2025-04-13T14:23:59.66 8.31
2025-04-13T14:24:00.66 8.30
2025-04-13T14:24:01.66 8.32
2025-04-13T14:24:02.66 8.31
2025-04-13T14:24:03.66 8.28
2025-04-13T14:24:04.66 8.29
2025-04-13T14:24:05.66 8.28
2025-04-13T14:24:06.66 8.30
2025-04-13T14:24:07.66 8.30
2025-04-13T14:24:08.66 8.32
2025-04-13T14:24:09.66 8.28
2025-04-13T14:24:10.66 8.31
2025-04-13T14:24:11.66 8.28
2025-04-13T14:24:12.66 8.30
2025-04-13T14:24:13.66 8.31
2025-04-13T14:24:14.66 8.30
2025-04-13T14:24:15.66 8.30
2025-04-13T14:24:16.66 8.30
2025-04-13T14:24:17.66 8.26
2025-04-13T14:24:18.66 8.31
2025-04-13T14:24:19.66 8.30
2025-04-13T14:24:20.66 8.32
2025-04-13T14:24:21.66 8.30
2025-04-13T14:24:22.66 8.33
2025-04-13T14:24:23.66 8.30
2025-04-13T14:24:24.66 8.30
2025-04-13T14:24:25.66 8.30
2025-04-13T14:24:26.66 8.32
2025-04-13T14:24:27.66 8.30
2025-04-13T14:24:28.66 8.31
2025-04-13T14:24:29.66 8.29
2025-04-13T14:24:30.66 8.28
2025-04-13T14:24:31.66 8.30
2025-04-13T14:24:32.66 8.28
2025-04-13T14:24:33.66 8.28
2025-04-13T14:24:34.66 8.30
2025-04-13T14:24:35.66 8.28
2025-04-13T14:24:36.66 8.29
2025-04-13T14:24:37.66 8.28
2025-04-13T14:24:38.66 8.31
2025-04-13T14:24:39.66 8.31
2025-04-13T14:24:40.66 8.30
2025-04-13T14:24:41.66 8.30
2025-04-13T14:24:42.66 8.28
2025-04-13T14:24:43.66 8.33
2025-04-13T14:24:44.66 8.31
2025-04-13T14:24:45.66 8.30
2025-04-13T14:24:46.66 8.28
2025-04-13T14:24:47.66 8.28
2025-04-13T14:24:48.66 8.31
2025-04-13T14:24:49.66 8.31
2025-04-13T14:24:50.66 8.31
2025-04-13T14:24:51.66 8.31
2025-04-13T14:24:52.66 8.32
2025-04-13T14:24:53.66 8.30
2025-04-13T14:24:54.66 8.30
2025-04-13T14:24:55.66 8.32
2025-04-13T14:24:56.66 8.30
2025-04-13T14:24:57.66 8.30
2025-04-13T14:24:58.66 8.31
2025-04-13T14:24:59.66 8.30
2025-04-13T14:25:00.66 8.30
2025-04-13T14:25:01.66 8.31
2025-04-13T14:25:02.66 8.32
2025-04-13T14:25:03.66 8.28
2025-04-13T14:25:04.66 8.30
2025-04-13T14:25:05.66 8.29
2025-04-13T14:25:06.66 8.30
2025-04-13T14:25:07.66 8.31
2025-04-13T14:25:08.66 8.30
2025-04-13T14:25:09.66 8.30
2025-04-13T14:25:10.66 8.30
2025-04-13T14:25:11.66 8.32
2025-04-13T14:25:12.66 8.29
2025-04-13T14:25:13.66 8.26
2025-04-13T14:25:14.66 8.32
2025-04-13T14:25:15.66 8.32
2025-04-13T14:25:16.66 8.32
2025-04-13T14:25:17.66 8.30
2025-04-13T14:25:18.66 8.30
2025-04-13T14:25:19.66 8.31
2025-04-13T14:25:20.66 8.26
2025-04-13T14:25:21.66 8.28
2025-04-13T14:25:22.66 8.32
2025-04-13T14:25:23.66 8.29
2025-04-13T14:25:24.66 8.32
2025-04-13T14:25:25.66 8.29
2025-04-13T14:25:26.66 8.30
2025-04-13T14:25:27.66 8.30
2025-04-13T14:25:28.66 8.30
2025-04-13T14:25:29.66 8.29
2025-04-13T14:25:30.66 8.28
2025-04-13T14:25:31.66 8.29
2025-04-13T14:25:32.66 8.33
2025-04-13T14:25:33.66 8.28
2025-04-13T14:25:34.66 8.28
2025-04-13T14:25:35.66 8.29
2025-04-13T14:25:36.66 8.28
2025-04-13T14:25:37.66 8.29
2025-04-13T14:25:38.66 8.32
2025-04-13T14:25:39.66 8.30
2025-04-13T14:25:40.66 8.30
2025-04-13T14:25:41.66 8.30
2025-04-13T14:25:42.66 8.30
2025-04-13T14:25:43.66 8.28
2025-04-13T14:25:44.66 8.30
2025-04-13T14:25:45.66 8.32
2025-04-13T14:25:46.66 8.31
2025-04-13T14:25:47.66 8.30
2025-04-13T14:25:48.66 8.31
2025-04-13T14:25:49.66 8.31
2025-04-13T14:25:50.66 8.30
2025-04-13T14:25:51.66 8.30
2025-04-13T14:25:52.66 8.31
2025-04-13T14:25:53.66 8.28
2025-04-13T14:25:54.66 8.30
2025-04-13T14:25:55.66 8.30
2025-04-13T14:25:56.66 8.30
2025-04-13T14:25:57.66 8.29
2025-04-13T14:25:58.66 8.26
2025-04-13T14:25:59.66 8.30
2025-04-13T14:26:00.66 8.30
2025-04-13T14:26:01.66 8.30
2025-04-13T14:26:02.66 8.29
2025-04-13T14:26:03.66 8.30
2025-04-13T14:26:04.66 8.30
2025-04-13T14:26:05.66 8.30
2025-04-13T14:26:06.66 8.30
2025-04-13T14:26:07.67 8.32
2025-04-13T14:26:08.65 8.29
2025-04-13T14:26:09.65 8.30
2025-04-13T14:26:10.65 8.30
2025-04-13T14:26:11.65 8.31
2025-04-13T14:26:12.65 8.29
2025-04-13T14:26:13.65 8.30
2025-04-13T14:26:14.65 8.31
2025-04-13T14:26:15.65 8.29
2025-04-13T14:26:16.65 8.31
2025-04-13T14:26:17.65 8.28
2025-04-13T14:26:18.65 8.28
2025-04-13T14:26:19.65 8.28
2025-04-13T14:26:20.65 8.31
2025-04-13T14:26:21.65 8.28
2025-04-13T14:26:22.65 8.28
2025-04-13T14:26:23.65 8.31
2025-04-13T14:26:24.65 8.28
2025-04-13T14:26:25.65 8.28
2025-04-13T14:26:26.65 8.32
2025-04-13T14:26:27.65 8.30
2025-04-13T14:26:28.65 8.28
2025-04-13T14:26:29.65 8.29
2025-04-13T14:26:30.65 8.31
2025-04-13T14:26:31.65 8.30
2025-04-13T14:26:32.65 8.30
2025-04-13T14:26:33.65 8.28
2025-04-13T14:26:34.65 8.28
2025-04-13T14:26:35.65 8.31
2025-04-13T14:26:36.65 8.29
2025-04-13T14:26:37.65 8.29
2025-04-13T14:26:38.65 8.30
2025-04-13T14:26:39.65 8.28
2025-04-13T14:26:40.65 8.28
2025-04-13T14:26:41.66 8.29
2025-04-13T14:26:42.66 8.29
2025-04-13T14:26:43.66 8.29
2025-04-13T14:26:44.66 8.30
2025-04-13T14:26:45.66 8.30
2025-04-13T14:26:46.66 8.30
2025-04-13T14:26:47.66 8.30
2025-04-13T14:26:48.66 8.30
2025-04-13T14:26:49.66 8.26
2025-04-13T14:26:50.66 8.30
2025-04-13T14:26:51.66 8.30
2025-04-13T14:26:52.66 8.30
2025-04-13T14:26:53.66 8.28
2025-04-13T14:26:54.66 8.31
2025-04-13T14:26:55.66 8.28
2025-04-13T14:26:56.66 8.30
2025-04-13T14:26:57.66 8.29
2025-04-13T14:26:58.66 8.31
2025-04-13T14:26:59.66 8.29
2025-04-13T14:27:00.66 8.30
2025-04-13T14:27:01.66 8.29
2025-04-13T14:27:02.66 8.29
2025-04-13T14:27:03.66 8.32
2025-04-13T14:27:04.66 8.28
2025-04-13T14:27:05.66 8.30
2025-04-13T14:27:06.66 8.30
2025-04-13T14:27:07.66 8.31
2025-04-13T14:27:08.66 8.31
2025-04-13T14:27:09.66 8.30
2025-04-13T14:27:10.66 8.28
2025-04-13T14:27:11.66 8.30
2025-04-13T14:27:12.66 8.28
2025-04-13T14:27:13.66 8.28
2025-04-13T14:27:14.66 8.30
2025-04-13T14:27:15.66 8.30
2025-04-13T14:27:16.66 8.29
2025-04-13T14:27:17.66 8.32
2025-04-13T14:27:18.66 8.29
2025-04-13T14:27:19.66 8.31
2025-04-13T14:27:20.66 8.30
2025-04-13T14:27:21.66 8.30
2025-04-13T14:27:22.66 8.30
2025-04-13T14:27:23.66 8.29
2025-04-13T14:27:24.66 8.32
2025-04-13T14:27:25.66 8.30
2025-04-13T14:27:26.66 8.30
2025-04-13T14:27:27.66 8.31
2025-04-13T14:27:28.66 8.31
2025-04-13T14:27:29.66 8.27
2025-04-13T14:27:30.66 8.31
2025-04-13T14:27:31.66 8.28
2025-04-13T14:27:32.66 8.31
2025-04-13T14:27:33.66 8.31
2025-04-13T14:27:34.66 8.29
2025-04-13T14:27:35.66 8.32
2025-04-13T14:27:36.66 8.30
2025-04-13T14:27:37.66 8.27
2025-04-13T14:27:38.66 8.30
2025-04-13T14:27:39.66 8.30
2025-04-13T14:27:40.66 8.30
2025-04-13T14:27:41.66 8.30
2025-04-13T14:27:42.66 8.30
2025-04-13T14:27:43.66 8.29
2025-04-13T14:27:44.66 8.30
2025-04-13T14:27:45.66 8.30
2025-04-13T14:27:46.66 8.29
2025-04-13T14:27:47.66 8.28
2025-04-13T14:27:48.66 8.29
2025-04-13T14:27:49.66 8.30
2025-04-13T14:27:50.66 8.30
2025-04-13T14:27:51.66 8.30
2025-04-13T14:27:52.66 8.32
2025-04-13T14:27:53.66 8.28
2025-04-13T14:27:54.66 8.32
2025-04-13T14:27:55.66 8.30
2025-04-13T14:27:56.66 8.32
2025-04-13T14:27:57.66 8.30
2025-04-13T14:27:58.66 8.30
2025-04-13T14:27:59.66 8.31
2025-04-13T14:28:00.66 8.30
2025-04-13T14:28:01.66 8.32
2025-04-13T14:28:02.66 8.30
2025-04-13T14:28:03.66 8.28
2025-04-13T14:28:04.66 8.28
2025-04-13T14:28:05.66 8.30
2025-04-13T14:28:06.66 8.30
2025-04-13T14:28:07.66 8.30
2025-04-13T14:28:08.66 8.29
2025-04-13T14:28:09.66 8.28
2025-04-13T14:28:10.66 8.29
2025-04-13T14:28:11.66 8.28
2025-04-13T14:28:12.66 8.30
2025-04-13T14:28:13.66 8.30
2025-04-13T14:28:14.66 8.30
2025-04-13T14:28:15.66 8.29
2025-04-13T14:28:16.66 8.28
2025-04-13T14:28:17.66 8.33
2025-04-13T14:28:18.66 8.28
2025-04-13T14:28:19.66 8.30
2025-04-13T14:28:20.66 8.29
2025-04-13T14:28:21.66 8.29
2025-04-13T14:28:22.66 8.30
2025-04-13T14:28:23.66 8.27
2025-04-13T14:28:24.66 8.31
2025-04-13T14:28:25.66 8.30
2025-04-13T14:28:26.66 8.32
2025-04-13T14:28:27.66 8.32
2025-04-13T14:28:28.66 8.28
2025-04-13T14:28:29.66 8.30
2025-04-13T14:28:30.66 8.30
2025-04-13T14:28:31.66 8.30
2025-04-13T14:28:32.66 8.30
2025-04-13T14:28:33.66 8.28
2025-04-13T14:28:34.66 8.32
2025-04-13T14:28:35.66 8.30
2025-04-13T14:28:36.66 8.30
2025-04-13T14:28:37.66 8.30
2025-04-13T14:28:38.66 8.32
2025-04-13T14:28:39.66 8.31
2025-04-13T14:28:40.66 8.30
2025-04-13T14:28:41.66 8.28
2025-04-13T14:28:42.66 8.31
2025-04-13T14:28:43.66 8.30
2025-04-13T14:28:44.66 8.28
2025-04-13T14:28:45.66 8.30
2025-04-13T14:28:46.66 8.32
2025-04-13T14:28:47.66 8.29
2025-04-13T14:28:48.66 8.30
2025-04-13T14:28:49.66 8.30
2025-04-13T14:28:50.66 8.30
2025-04-13T14:28:51.66 8.30
2025-04-13T14:28:52.66 8.29
2025-04-13T14:28:53.66 8.30
2025-04-13T14:28:54.66 8.30
2025-04-13T14:28:55.66 8.30
2025-04-13T14:28:56.66 8.28
2025-04-13T14:28:57.66 8.27
2025-04-13T14:28:58.66 8.29
2025-04-13T14:28:59.66 8.29
2025-04-13T14:29:00.66 8.30
2025-04-13T14:29:01.66 8.29
2025-04-13T14:29:02.66 8.33
2025-04-13T14:29:03.66 8.30
2025-04-13T14:29:04.66 8.33
2025-04-13T14:29:05.66 8.30
2025-04-13T14:29:06.66 8.29
2025-04-13T14:29:07.66 8.28
2025-04-13T14:29:08.66 8.30
2025-04-13T14:29:09.66 8.30
2025-04-13T14:29:10.66 8.29
2025-04-13T14:29:11.66 8.29
2025-04-13T14:29:12.66 8.30
2025-04-13T14:29:13.66 8.29
2025-04-13T14:29:14.66 8.31
2025-04-13T14:29:15.66 8.32
2025-04-13T14:29:16.66 8.32
2025-04-13T14:29:17.66 8.30
2025-04-13T14:29:18.66 8.29
2025-04-13T14:29:19.66 8.30
2025-04-13T14:29:20.66 8.30
2025-04-13T14:29:21.66 8.29
2025-04-13T14:29:22.66 8.29
2025-04-13T14:29:23.66 8.30
2025-04-13T14:29:24.66 8.30
2025-04-13T14:29:25.66 8.28
2025-04-13T14:29:26.66 8.28
2025-04-13T14:29:27.66 8.29
2025-04-13T14:29:28.66 8.29
2025-04-13T14:29:29.66 8.30
2025-04-13T14:29:30.66 8.29
2025-04-13T14:29:31.66 8.29
2025-04-13T14:29:32.66 8.30
2025-04-13T14:29:33.66 8.30
2025-04-13T14:29:34.66 8.30
2025-04-13T14:29:35.66 8.30
2025-04-13T14:29:36.66 8.30
2025-04-13T14:29:37.66 8.30
2025-04-13T14:29:38.66 8.31
2025-04-13T14:29:39.66 8.30
2025-04-13T14:29:40.66 8.32
2025-04-13T14:29:41.66 8.31
2025-04-13T14:29:42.66 8.30
2025-04-13T14:29:43.66 8.27
2025-04-13T14:29:44.66 8.30
2025-04-13T14:29:45.67 8.29
2025-04-13T14:29:46.65 8.30
2025-04-13T14:29:47.65 8.27
2025-04-13T14:29:48.65 8.31
2025-04-13T14:29:49.65 8.29
2025-04-13T14:29:50.65 8.28
2025-04-13T14:29:51.65 8.28
2025-04-13T14:29:52.65 8.30
2025-04-13T14:29:53.65 8.29
2025-04-13T14:29:54.65 8.31
2025-04-13T14:29:55.65 8.30
2025-04-13T14:29:56.65 8.30
2025-04-13T14:29:57.65 8.30
2025-04-13T14:29:58.65 8.29
2025-04-13T14:29:59.66 8.31
2025-04-13T14:30:00.64 8.32
2025-04-13T14:30:01.64 8.31
2025-04-13T14:30:02.64 8.30
2025-04-13T14:30:03.64 8.31
2025-04-13T14:30:04.64 8.30
2025-04-13T14:30:05.64 8.31
2025-04-13T14:30:06.64 8.30
2025-04-13T14:30:07.64 8.30
2025-04-13T14:30:08.64 8.30
2025-04-13T14:30:09.64 8.29
2025-04-13T14:30:10.64 8.30
2025-04-13T14:30:11.64 8.30
2025-04-13T14:30:12.64 8.27
2025-04-13T14:30:13.64 8.29
2025-04-13T14:30:14.64 8.29
2025-04-13T14:30:15.64 8.28
2025-04-13T14:30:16.64 8.28
2025-04-13T14:30:17.64 8.29
2025-04-13T14:30:18.64 8.30
2025-04-13T14:30:19.64 8.29
2025-04-13T14:30:20.64 8.32
2025-04-13T14:30:21.64 8.28
2025-04-13T14:30:22.64 8.29
2025-04-13T14:30:23.64 8.32
2025-04-13T14:30:24.64 8.28
2025-04-13T14:30:25.64 8.30
2025-04-13T14:30:26.64 8.30
2025-04-13T14:30:27.64 8.31
2025-04-13T14:30:28.64 8.32
2025-04-13T14:30:29.64 8.32
2025-04-13T14:30:30.64 8.29
2025-04-13T14:30:31.64 8.30
2025-04-13T14:30:32.64 8.30
2025-04-13T14:30:33.64 8.30
2025-04-13T14:30:34.64 8.32
2025-04-13T14:30:35.64 8.30
2025-04-13T14:30:36.64 8.32
2025-04-13T14:30:37.64 8.28
2025-04-13T14:30:38.64 8.28
2025-04-13T14:30:39.64 8.29
2025-04-13T14:30:40.64 8.28
2025-04-13T14:30:41.64 8.28
2025-04-13T14:30:42.64 8.30
2025-04-13T14:30:43.64 8.28
2025-04-13T14:30:44.64 8.30
2025-04-13T14:30:45.64 8.30
2025-04-13T14:30:46.64 8.28
2025-04-13T14:30:47.64 8.27
2025-04-13T14:30:48.64 8.29
2025-04-13T14:30:49.64 8.30
2025-04-13T14:30:50.64 8.30
2025-04-13T14:30:51.64 8.31
2025-04-13T14:30:52.64 8.29
2025-04-13T14:30:53.64 8.30
2025-04-13T14:30:54.64 8.30
2025-04-13T14:30:55.64 8.30
2025-04-13T14:30:56.64 8.31
2025-04-13T14:30:57.64 8.28
2025-04-13T14:30:58.64 8.31
2025-04-13T14:30:59.64 8.30
2025-04-13T14:31:00.64 8.30
2025-04-13T14:31:01.64 8.30
2025-04-13T14:31:02.64 8.24
2025-04-13T14:31:03.64 8.32
2025-04-13T14:31:04.64 8.30
2025-04-13T14:31:05.64 8.26
2025-04-13T14:31:06.64 8.32
2025-04-13T14:31:07.64 8.30
2025-04-13T14:31:08.64 8.28
2025-04-13T14:31:09.64 8.30
2025-04-13T14:31:10.64 8.29
2025-04-13T14:31:11.64 8.30
2025-04-13T14:31:12.64 8.29
2025-04-13T14:31:13.64 8.28
2025-04-13T14:31:14.64 8.28
2025-04-13T14:31:15.64 8.31
2025-04-13T14:31:16.64 8.30
2025-04-13T14:31:17.64 8.31
2025-04-13T14:31:18.64 8.32
2025-04-13T14:31:19.64 8.28
2025-04-13T14:31:20.64 8.32
2025-04-13T14:31:21.64 8.31
2025-04-13T14:31:22.64 8.28
2025-04-13T14:31:23.64 8.30
2025-04-13T14:31:24.64 8.27
2025-04-13T14:31:25.64 8.33
2025-04-13T14:31:26.64 8.29
2025-04-13T14:31:27.64 8.28
2025-04-13T14:31:28.64 8.30
2025-04-13T14:31:29.64 8.30
2025-04-13T14:31:30.64 8.29
2025-04-13T14:31:31.64 8.30
2025-04-13T14:31:32.64 8.29
2025-04-13T14:31:33.64 8.30
2025-04-13T14:31:34.64 8.28
2025-04-13T14:31:35.64 8.29
2025-04-13T14:31:36.64 8.26
2025-04-13T14:31:37.64 8.30
2025-04-13T14:31:38.64 8.29
2025-04-13T14:31:39.64 8.30
2025-04-13T14:31:40.64 8.29
2025-04-13T14:31:41.64 8.31
2025-04-13T14:31:42.64 8.31
2025-04-13T14:31:43.64 8.30
2025-04-13T14:31:44.64 8.32
2025-04-13T14:31:45.64 8.31
2025-04-13T14:31:46.64 8.28
2025-04-13T14:31:47.64 8.30
2025-04-13T14:31:48.64 8.30
2025-04-13T14:31:49.64 8.31
2025-04-13T14:31:50.64 8.29
2025-04-13T14:31:51.64 8.30
2025-04-13T14:31:52.64 8.30
2025-04-13T14:31:53.64 8.30
2025-04-13T14:31:54.64 8.32
2025-04-13T14:31:55.64 8.28
2025-04-13T14:31:56.65 8.30
2025-04-13T14:31:57.64 8.33
2025-04-13T14:31:58.64 8.30
2025-04-13T14:31:59.65 8.30
2025-04-13T14:32:00.65 8.29
2025-04-13T14:32:01.65 8.29
2025-04-13T14:32:02.65 8.31
2025-04-13T14:32:03.65 8.28
2025-04-13T14:32:04.65 8.29
2025-04-13T14:32:05.65 8.29
2025-04-13T14:32:06.65 8.30
2025-04-13T14:32:07.65 8.30
2025-04-13T14:32:08.65 8.32
2025-04-13T14:32:09.65 8.31
2025-04-13T14:32:10.65 8.29
2025-04-13T14:32:11.65 8.30
2025-04-13T14:32:12.65 8.30
2025-04-13T14:32:13.65 8.29
2025-04-13T14:32:14.65 8.29
2025-04-13T14:32:15.65 8.31
2025-04-13T14:32:16.65 8.32
2025-04-13T14:32:17.65 8.30
2025-04-13T14:32:18.65 8.30
2025-04-13T14:32:19.65 8.30
2025-04-13T14:32:20.65 8.32
2025-04-13T14:32:21.65 8.30
2025-04-13T14:32:22.65 8.28
2025-04-13T14:32:23.65 8.32
2025-04-13T14:32:24.65 8.32
2025-04-13T14:32:25.65 8.28
2025-04-13T14:32:26.65 8.30
2025-04-13T14:32:27.65 8.30
2025-04-13T14:32:28.65 8.32
2025-04-13T14:32:29.65 8.30
2025-04-13T14:32:30.65 8.32
2025-04-13T14:32:31.65 8.30
2025-04-13T14:32:32.65 8.30
2025-04-13T14:32:33.65 8.29
2025-04-13T14:32:34.65 8.32
2025-04-13T14:32:35.65 8.31
2025-04-13T14:32:36.65 8.28
2025-04-13T14:32:37.65 8.30
2025-04-13T14:32:38.65 8.31
2025-04-13T14:32:39.65 8.29
2025-04-13T14:32:40.65 8.30
2025-04-13T14:32:41.65 8.31
2025-04-13T14:32:42.65 8.33
2025-04-13T14:32:43.65 8.30
2025-04-13T14:32:44.65 8.28
2025-04-13T14:32:45.65 8.33
2025-04-13T14:32:46.65 8.31
2025-04-13T14:32:47.65 8.27
2025-04-13T14:32:48.65 8.29
2025-04-13T14:32:49.65 8.29
2025-04-13T14:32:50.65 8.32
2025-04-13T14:32:51.65 8.30
2025-04-13T14:32:52.65 8.26
2025-04-13T14:32:53.65 8.31
2025-04-13T14:32:54.65 8.30
2025-04-13T14:32:55.65 8.32
2025-04-13T14:32:56.65 8.30
2025-04-13T14:32:57.65 8.30
2025-04-13T14:32:58.67 8.28
2025-04-13T14:32:59.65 8.32
2025-04-13T14:33:00.65 8.30
2025-04-13T14:33:01.65 8.30
2025-04-13T14:33:02.65 8.30
2025-04-13T14:33:03.65 8.29
2025-04-13T14:33:04.65 8.31
2025-04-13T14:33:05.65 8.28
2025-04-13T14:33:06.65 8.30
2025-04-13T14:33:07.65 8.33
2025-04-13T14:33:08.65 8.32
2025-04-13T14:33:09.65 8.32
2025-04-13T14:33:10.65 8.29
2025-04-13T14:33:11.65 8.31
2025-04-13T14:33:12.65 8.32
2025-04-13T14:33:13.65 8.31
2025-04-13T14:33:14.65 8.29
2025-04-13T14:33:15.65 8.28
2025-04-13T14:33:16.65 8.28
2025-04-13T14:33:17.65 8.28
2025-04-13T14:33:18.65 8.28
2025-04-13T14:33:19.65 8.30
2025-04-13T14:33:20.65 8.27
2025-04-13T14:33:21.65 8.29
2025-04-13T14:33:22.65 8.27
2025-04-13T14:33:23.65 8.30
2025-04-13T14:33:24.65 8.31
2025-04-13T14:33:25.65 8.30
2025-04-13T14:33:26.65 8.28
2025-04-13T14:33:27.65 8.28
2025-04-13T14:33:28.65 8.29
2025-04-13T14:33:29.65 8.28
2025-04-13T14:33:30.65 8.30
2025-04-13T14:33:31.65 8.27
2025-04-13T14:33:32.65 8.29
2025-04-13T14:33:33.65 8.28
2025-04-13T14:33:34.65 8.28
2025-04-13T14:33:35.65 8.28
2025-04-13T14:33:36.65 8.28
2025-04-13T14:33:37.65 8.30
2025-04-13T14:33:38.65 8.29
2025-04-13T14:33:39.65 8.29
2025-04-13T14:33:40.65 8.29
2025-04-13T14:33:41.65 8.32
2025-04-13T14:33:42.65 8.28
2025-04-13T14:33:43.65 8.29
2025-04-13T14:33:44.65 8.30
2025-04-13T14:33:45.65 8.30
2025-04-13T14:33:46.65 8.28
2025-04-13T14:33:47.65 8.30
2025-04-13T14:33:48.65 8.29
2025-04-13T14:33:49.65 8.30
2025-04-13T14:33:50.65 8.29
2025-04-13T14:33:51.65 8.27
2025-04-13T14:33:52.65 8.27
2025-04-13T14:33:53.65 8.27
2025-04-13T14:33:54.65 8.26
2025-04-13T14:33:55.65 8.28
2025-04-13T14:33:56.65 8.30
2025-04-13T14:33:57.65 8.29
2025-04-13T14:33:58.65 8.28
2025-04-13T14:33:59.65 8.32
2025-04-13T14:34:00.65 8.28
2025-04-13T14:34:01.65 8.30
2025-04-13T14:34:02.65 8.28
2025-04-13T14:34:03.65 8.29
2025-04-13T14:34:04.65 8.28
2025-04-13T14:34:05.65 8.30
2025-04-13T14:34:06.65 8.28
2025-04-13T14:34:07.65 8.29
2025-04-13T14:34:08.65 8.28
2025-04-13T14:34:09.65 8.29
2025-04-13T14:34:10.65 8.30
2025-04-13T14:34:11.65 8.26
2025-04-13T14:34:12.65 8.30
2025-04-13T14:34:13.65 8.32
2025-04-13T14:34:14.65 8.29
2025-04-13T14:34:15.65 8.29
2025-04-13T14:34:16.65 8.32
2025-04-13T14:34:17.65 8.30
2025-04-13T14:34:18.65 8.30
2025-04-13T14:34:19.65 8.28
2025-04-13T14:34:20.65 8.30
2025-04-13T14:34:21.65 8.31
2025-04-13T14:34:22.65 8.30
2025-04-13T14:34:23.65 8.30
2025-04-13T14:34:24.65 8.26
2025-04-13T14:34:25.65 8.30
2025-04-13T14:34:26.65 8.28
2025-04-13T14:34:27.65 8.33
2025-04-13T14:34:28.65 8.31
2025-04-13T14:34:29.65 8.28
2025-04-13T14:34:30.65 8.28
2025-04-13T14:34:31.65 8.28
2025-04-13T14:34:32.65 8.30
2025-04-13T14:34:33.65 8.32
2025-04-13T14:34:34.65 8.30
2025-04-13T14:34:35.65 8.27
2025-04-13T14:34:36.65 8.29
2025-04-13T14:34:37.65 8.32
2025-04-13T14:34:38.65 8.28
2025-04-13T14:34:39.65 8.28
2025-04-13T14:34:40.65 8.30
2025-04-13T14:34:41.65 8.32
2025-04-13T14:34:42.65 8.28
2025-04-13T14:34:43.65 8.28
2025-04-13T14:34:44.65 8.31
2025-04-13T14:34:45.65 8.30
2025-04-13T14:34:46.65 8.30
2025-04-13T14:34:47.65 8.29
2025-04-13T14:34:48.65 8.29
2025-04-13T14:34:49.65 8.27
2025-04-13T14:34:50.65 8.30
2025-04-13T14:34:51.65 8.29
2025-04-13T14:34:52.65 8.32
2025-04-13T14:34:53.65 8.33
2025-04-13T14:34:54.65 8.29
2025-04-13T14:34:55.65 8.30
2025-04-13T14:34:56.65 8.32
2025-04-13T14:34:57.65 8.29
2025-04-13T14:34:58.65 8.29
2025-04-13T14:34:59.65 8.30
2025-04-13T14:35:00.65 8.30
2025-04-13T14:35:01.65 8.31
2025-04-13T14:35:02.65 8.29
2025-04-13T14:35:03.65 8.30
2025-04-13T14:35:04.65 8.30
2025-04-13T14:35:05.65 8.28
2025-04-13T14:35:06.65 8.28
2025-04-13T14:35:07.65 8.29
2025-04-13T14:35:08.65 8.29
2025-04-13T14:35:09.65 8.31
2025-04-13T14:35:10.65 8.29
2025-04-13T14:35:11.65 8.28
2025-04-13T14:35:12.65 8.31
2025-04-13T14:35:13.65 8.30
2025-04-13T14:35:14.65 8.28
2025-04-13T14:35:15.65 8.29
2025-04-13T14:35:16.65 8.30
2025-04-13T14:35:17.65 8.31
2025-04-13T14:35:18.65 8.30
2025-04-13T14:35:19.65 8.30
2025-04-13T14:35:20.65 8.29
2025-04-13T14:35:21.65 8.30
2025-04-13T14:35:22.65 8.29
2025-04-13T14:35:23.65 8.28
2025-04-13T14:35:24.65 8.28
2025-04-13T14:35:25.65 8.28
2025-04-13T14:35:26.65 8.28
2025-04-13T14:35:27.65 8.30
2025-04-13T14:35:28.65 8.30
2025-04-13T14:35:29.65 8.30
2025-04-13T14:35:30.65 8.32
2025-04-13T14:35:31.65 8.28
2025-04-13T14:35:32.65 8.28
2025-04-13T14:35:33.65 8.30
2025-04-13T14:35:34.65 8.30
2025-04-13T14:35:35.65 8.32
2025-04-13T14:35:36.65 8.30
2025-04-13T14:35:37.65 8.31
2025-04-13T14:35:38.65 8.32
2025-04-13T14:35:39.65 8.30
2025-04-13T14:35:40.65 8.28
2025-04-13T14:35:41.65 8.31
2025-04-13T14:35:42.65 8.32
2025-04-13T14:35:43.65 8.31
2025-04-13T14:35:44.65 8.30
2025-04-13T14:35:45.65 8.31
2025-04-13T14:35:46.65 8.28
2025-04-13T14:35:47.65 8.30
2025-04-13T14:35:48.65 8.30
2025-04-13T14:35:49.65 8.32
2025-04-13T14:35:50.65 8.30
2025-04-13T14:35:51.65 8.30
2025-04-13T14:35:52.65 8.29
2025-04-13T14:35:53.65 8.28
2025-04-13T14:35:54.65 8.30
2025-04-13T14:35:55.65 8.32
2025-04-13T14:35:56.65 8.30
2025-04-13T14:35:57.65 8.30
2025-04-13T14:35:58.65 8.28
2025-04-13T14:35:59.65 8.29
2025-04-13T14:36:00.65 8.29
2025-04-13T14:36:01.65 8.29
2025-04-13T14:36:02.65 8.29
2025-04-13T14:36:03.65 8.32
2025-04-13T14:36:04.65 8.31
2025-04-13T14:36:05.65 8.28
2025-04-13T14:36:06.65 8.31
2025-04-13T14:36:07.65 8.30
2025-04-13T14:36:08.65 8.30
2025-04-13T14:36:09.65 8.32
2025-04-13T14:36:10.65 8.30
2025-04-13T14:36:11.65 8.31
2025-04-13T14:36:12.65 8.32
2025-04-13T14:36:13.65 8.30
2025-04-13T14:36:14.65 8.31
2025-04-13T14:36:15.65 8.32
2025-04-13T14:36:16.65 8.32
2025-04-13T14:36:17.65 8.30
2025-04-13T14:36:18.65 8.30
2025-04-13T14:36:19.65 8.30
2025-04-13T14:36:20.65 8.31
2025-04-13T14:36:21.65 8.29
2025-04-13T14:36:22.65 8.30
2025-04-13T14:36:23.65 8.32
2025-04-13T14:36:24.65 8.29
2025-04-13T14:36:25.65 8.30
2025-04-13T14:36:26.65 8.31
2025-04-13T14:36:27.65 8.30
2025-04-13T14:36:28.65 8.31
2025-04-13T14:36:29.65 8.30
2025-04-13T14:36:30.65 8.30
2025-04-13T14:36:31.65 8.30
2025-04-13T14:36:32.65 8.32
2025-04-13T14:36:33.65 8.28
2025-04-13T14:36:34.65 8.32
2025-04-13T14:36:35.65 8.28
2025-04-13T14:36:36.65 8.29
2025-04-13T14:36:37.65 8.28
2025-04-13T14:36:38.65 8.29
2025-04-13T14:36:39.65 8.31
2025-04-13T14:36:40.65 8.30
2025-04-13T14:36:41.65 8.27
2025-04-13T14:36:42.65 8.29
2025-04-13T14:36:43.65 8.29
2025-04-13T14:36:44.65 8.28
2025-04-13T14:36:45.65 8.30
2025-04-13T14:36:46.65 8.31
2025-04-13T14:36:47.65 8.30
2025-04-13T14:36:48.65 8.30
2025-04-13T14:36:49.65 8.31
2025-04-13T14:36:50.65 8.28
2025-04-13T14:36:51.65 8.30
2025-04-13T14:36:52.65 8.28
2025-04-13T14:36:53.65 8.30
2025-04-13T14:36:54.65 8.30
2025-04-13T14:36:55.65 8.31
2025-04-13T14:36:56.65 8.30
2025-04-13T14:36:57.65 8.28
2025-04-13T14:36:58.65 8.30
2025-04-13T14:36:59.65 8.30
2025-04-13T14:37:00.65 8.31
2025-04-13T14:37:01.65 8.28
2025-04-13T14:37:02.65 8.28
2025-04-13T14:37:03.65 8.32
2025-04-13T14:37:04.65 8.29
2025-04-13T14:37:05.65 8.31
2025-04-13T14:37:06.65 8.30
2025-04-13T14:37:07.65 8.31
2025-04-13T14:37:08.65 8.30
2025-04-13T14:37:09.65 8.30
2025-04-13T14:37:10.65 8.31
2025-04-13T14:37:11.65 8.32
2025-04-13T14:37:12.65 8.28
2025-04-13T14:37:13.65 8.31
2025-04-13T14:37:14.65 8.32
2025-04-13T14:37:15.65 8.30
2025-04-13T14:37:16.65 8.28
2025-04-13T14:37:17.65 8.30
2025-04-13T14:37:18.66 8.31
2025-04-13T14:37:19.66 8.30
2025-04-13T14:37:20.66 8.30
2025-04-13T14:37:21.66 8.28
2025-04-13T14:37:22.66 8.28
2025-04-13T14:37:23.66 8.30
2025-04-13T14:37:24.66 8.32
2025-04-13T14:37:25.66 8.30
2025-04-13T14:37:26.66 8.28
2025-04-13T14:37:27.66 8.30
2025-04-13T14:37:28.66 8.29
2025-04-13T14:37:29.66 8.30
2025-04-13T14:37:30.66 8.29
2025-04-13T14:37:31.66 8.28
2025-04-13T14:37:32.66 8.28
2025-04-13T14:37:33.66 8.28
2025-04-13T14:37:34.66 8.31
2025-04-13T14:37:35.66 8.29
2025-04-13T14:37:36.66 8.30
2025-04-13T14:37:37.66 8.26
2025-04-13T14:37:38.66 8.30
2025-04-13T14:37:39.66 8.32
2025-04-13T14:37:40.66 8.30
2025-04-13T14:37:41.66 8.28
2025-04-13T14:37:42.66 8.29
2025-04-13T14:37:43.66 8.30
2025-04-13T14:37:44.66 8.30
2025-04-13T14:37:45.66 8.27
2025-04-13T14:37:46.66 8.29
2025-04-13T14:37:47.66 8.30
2025-04-13T14:37:48.66 8.28
2025-04-13T14:37:49.66 8.32
2025-04-13T14:37:50.66 8.30
2025-04-13T14:37:51.66 8.31
2025-04-13T14:37:52.66 8.30
2025-04-13T14:37:53.66 8.29
2025-04-13T14:37:54.66 8.29
2025-04-13T14:37:55.66 8.30
2025-04-13T14:37:56.66 8.30
2025-04-13T14:37:57.66 8.31
2025-04-13T14:37:58.66 8.28
2025-04-13T14:37:59.66 8.32
2025-04-13T14:38:00.66 8.31
2025-04-13T14:38:01.66 8.29
2025-04-13T14:38:02.66 8.30
2025-04-13T14:38:03.66 8.28
2025-04-13T14:38:04.66 8.30
2025-04-13T14:38:05.66 8.31
2025-04-13T14:38:06.66 8.31
2025-04-13T14:38:07.66 8.30
2025-04-13T14:38:08.66 8.28
2025-04-13T14:38:09.66 8.28
2025-04-13T14:38:10.66 8.30
2025-04-13T14:38:11.66 8.30
2025-04-13T14:38:12.66 8.30
2025-04-13T14:38:13.66 8.31
2025-04-13T14:38:14.66 8.29
2025-04-13T14:38:15.66 8.30
2025-04-13T14:38:16.66 8.31
2025-04-13T14:38:17.66 8.30
2025-04-13T14:38:18.66 8.28
2025-04-13T14:38:19.66 8.30
2025-04-13T14:38:20.66 8.28
2025-04-13T14:38:21.66 8.28
2025-04-13T14:38:22.66 8.30
2025-04-13T14:38:23.66 8.32
2025-04-13T14:38:24.66 8.31
2025-04-13T14:38:25.66 8.27
2025-04-13T14:38:26.66 8.32
2025-04-13T14:38:27.66 8.29
2025-04-13T14:38:28.66 8.30
2025-04-13T14:38:29.66 8.29
2025-04-13T14:38:30.66 8.28
2025-04-13T14:38:31.66 8.29
2025-04-13T14:38:32.66 8.30
2025-04-13T14:38:33.66 8.31
2025-04-13T14:38:34.66 8.28
2025-04-13T14:38:35.66 8.30
2025-04-13T14:38:36.66 8.32
2025-04-13T14:38:37.66 8.32
2025-04-13T14:38:38.66 8.27
2025-04-13T14:38:39.66 8.30
2025-04-13T14:38:40.66 8.29
2025-04-13T14:38:41.66 8.30
2025-04-13T14:38:42.66 8.30
2025-04-13T14:38:43.66 8.30
2025-04-13T14:38:44.66 8.30
2025-04-13T14:38:45.66 8.30
2025-04-13T14:38:46.66 8.32
2025-04-13T14:38:47.66 8.31
2025-04-13T14:38:48.66 8.30
2025-04-13T14:38:49.66 8.33
2025-04-13T14:38:50.66 8.30
2025-04-13T14:38:51.66 8.32
2025-04-13T14:38:52.66 8.29
2025-04-13T14:38:53.66 8.31
2025-04-13T14:38:54.66 8.32
2025-04-13T14:38:55.66 8.29
2025-04-13T14:38:56.66 8.30
2025-04-13T14:38:57.66 8.30
2025-04-13T14:38:58.66 8.31
2025-04-13T14:38:59.66 8.30
2025-04-13T14:39:00.66 8.28
2025-04-13T14:39:01.66 8.30
2025-04-13T14:39:02.66 8.30
2025-04-13T14:39:03.66 8.30
2025-04-13T14:39:04.66 8.28
2025-04-13T14:39:05.66 8.30
2025-04-13T14:39:06.66 8.30
2025-04-13T14:39:07.66 8.30
2025-04-13T14:39:08.66 8.30
2025-04-13T14:39:09.66 8.30
2025-04-13T14:39:10.66 8.30
2025-04-13T14:39:11.66 8.32
2025-04-13T14:39:12.66 8.32
2025-04-13T14:39:13.66 8.30
2025-04-13T14:39:14.66 8.31
2025-04-13T14:39:15.66 8.31
2025-04-13T14:39:16.66 8.29
2025-04-13T14:39:17.66 8.30
2025-04-13T14:39:18.66 8.30
2025-04-13T14:39:19.66 8.30
2025-04-13T14:39:20.66 8.30
2025-04-13T14:39:21.66 8.31
2025-04-13T14:39:22.66 8.29
2025-04-13T14:39:23.66 8.30
2025-04-13T14:39:24.66 8.30
2025-04-13T14:39:25.66 8.28
2025-04-13T14:39:26.66 8.28
2025-04-13T14:39:27.66 8.30
2025-04-13T14:39:28.66 8.32
2025-04-13T14:39:29.66 8.30
2025-04-13T14:39:30.66 8.29
2025-04-13T14:39:31.66 8.29
2025-04-13T14:39:32.66 8.29
2025-04-13T14:39:33.66 8.30
2025-04-13T14:39:34.66 8.31
2025-04-13T14:39:35.66 8.32
2025-04-13T14:39:36.66 8.30
2025-04-13T14:39:37.66 8.29
2025-04-13T14:39:38.66 8.31
2025-04-13T14:39:39.66 8.30
2025-04-13T14:39:40.66 8.31
2025-04-13T14:39:41.66 8.31
2025-04-13T14:39:42.66 8.30
2025-04-13T14:39:43.66 8.29
2025-04-13T14:39:44.66 8.31
2025-04-13T14:39:45.66 8.30
2025-04-13T14:39:46.66 8.30
2025-04-13T14:39:47.66 8.30
2025-04-13T14:39:48.66 8.30
2025-04-13T14:39:49.66 8.32
2025-04-13T14:39:50.66 8.31
2025-04-13T14:39:51.66 8.30
2025-04-13T14:39:52.66 8.32
2025-04-13T14:39:53.66 8.27
2025-04-13T14:39:54.66 8.32
2025-04-13T14:39:55.66 8.30
2025-04-13T14:39:56.66 8.32
2025-04-13T14:39:57.66 8.31
2025-04-13T14:39:58.66 8.28
2025-04-13T14:39:59.66 8.30
2025-04-13T14:40:00.66 8.32
2025-04-13T14:40:01.66 8.28
2025-04-13T14:40:02.66 8.31
2025-04-13T14:40:03.66 8.31
2025-04-13T14:40:04.66 8.28
2025-04-13T14:40:05.66 8.30
2025-04-13T14:40:06.66 8.29
2025-04-13T14:40:07.66 8.30
2025-04-13T14:40:08.66 8.30
2025-04-13T14:40:09.66 8.29
2025-04-13T14:40:10.66 8.32
2025-04-13T14:40:11.66 8.30
2025-04-13T14:40:12.66 8.29
2025-04-13T14:40:13.66 8.27
2025-04-13T14:40:14.66 8.29
2025-04-13T14:40:15.66 8.28
2025-04-13T14:40:16.66 8.28
2025-04-13T14:40:17.66 8.30
2025-04-13T14:40:18.66 8.30
2025-04-13T14:40:19.66 8.29
2025-04-13T14:40:20.66 8.30
2025-04-13T14:40:21.66 8.30
2025-04-13T14:40:22.66 8.30
2025-04-13T14:40:23.66 8.30
2025-04-13T14:40:24.66 8.29
2025-04-13T14:40:25.66 8.28
2025-04-13T14:40:26.66 8.30
2025-04-13T14:40:27.66 8.32
2025-04-13T14:40:28.67 8.30
2025-04-13T14:40:29.65 8.29
2025-04-13T14:40:30.65 8.28
2025-04-13T14:40:31.65 8.30
2025-04-13T14:40:32.65 8.28
2025-04-13T14:40:33.65 8.30
2025-04-13T14:40:34.65 8.31
2025-04-13T14:40:35.65 8.31
2025-04-13T14:40:36.65 8.28
2025-04-13T14:40:37.65 8.29
2025-04-13T14:40:38.65 8.30
2025-04-13T14:40:39.65 8.30
2025-04-13T14:40:40.65 8.29
2025-04-13T14:40:41.65 8.28
2025-04-13T14:40:42.65 8.30
2025-04-13T14:40:43.65 8.29
2025-04-13T14:40:44.65 8.31
2025-04-13T14:40:45.65 8.33
2025-04-13T14:40:46.65 8.30
2025-04-13T14:40:47.65 8.32
2025-04-13T14:40:48.65 8.32
2025-04-13T14:40:49.65 8.31
2025-04-13T14:40:50.65 8.31
2025-04-13T14:40:51.65 8.28
2025-04-13T14:40:52.65 8.30
2025-04-13T14:40:53.65 8.32
2025-04-13T14:40:54.65 8.32
2025-04-13T14:40:55.65 8.30
2025-04-13T14:40:56.65 8.31
2025-04-13T14:40:57.65 8.30
2025-04-13T14:40:58.65 8.28
2025-04-13T14:40:59.65 8.30
2025-04-13T14:41:00.65 8.28
2025-04-13T14:41:01.65 8.28
2025-04-13T14:41:02.65 8.30
2025-04-13T14:41:03.65 8.28
2025-04-13T14:41:04.65 8.29
2025-04-13T14:41:05.65 8.31
2025-04-13T14:41:06.65 8.31
2025-04-13T14:41:07.65 8.30
2025-04-13T14:41:08.65 8.30
2025-04-13T14:41:09.65 8.30
2025-04-13T14:41:10.65 8.32
2025-04-13T14:41:11.65 8.30
2025-04-13T14:41:12.65 8.27
2025-04-13T14:41:13.65 8.30
2025-04-13T14:41:14.65 8.30
2025-04-13T14:41:15.65 8.30
2025-04-13T14:41:16.65 8.30
2025-04-13T14:41:17.65 8.31
2025-04-13T14:41:18.65 8.30
2025-04-13T14:41:19.65 8.29
2025-04-13T14:41:20.65 8.30
2025-04-13T14:41:21.65 8.32
2025-04-13T14:41:22.65 8.32
2025-04-13T14:41:23.65 8.29
2025-04-13T14:41:24.65 8.28
2025-04-13T14:41:25.65 8.32
2025-04-13T14:41:26.65 8.29
2025-04-13T14:41:27.65 8.28
2025-04-13T14:41:28.65 8.32
2025-04-13T14:41:29.65 8.32
2025-04-13T14:41:30.65 8.29
2025-04-13T14:41:31.65 8.31
2025-04-13T14:41:32.65 8.30
2025-04-13T14:41:33.65 8.31
2025-04-13T14:41:34.65 8.30
2025-04-13T14:41:35.65 8.29
2025-04-13T14:41:36.65 8.30
2025-04-13T14:41:37.65 8.30
2025-04-13T14:41:38.65 8.31
2025-04-13T14:41:39.65 8.29
2025-04-13T14:41:40.66 8.31
2025-04-13T14:41:41.64 8.31
2025-04-13T14:41:42.64 8.29
2025-04-13T14:41:43.64 8.34
2025-04-13T14:41:44.64 8.31
2025-04-13T14:41:45.64 8.30
2025-04-13T14:41:46.64 8.30
2025-04-13T14:41:47.64 8.30
2025-04-13T14:41:48.64 8.29
2025-04-13T14:41:49.64 8.30
2025-04-13T14:41:50.64 8.30
2025-04-13T14:41:51.64 8.30
2025-04-13T14:41:52.64 8.31
2025-04-13T14:41:53.64 8.32
2025-04-13T14:41:54.64 8.29
2025-04-13T14:41:55.64 8.32
2025-04-13T14:41:56.64 8.29
2025-04-13T14:41:57.64 8.27
2025-04-13T14:41:58.64 8.32
2025-04-13T14:41:59.64 8.30
2025-04-13T14:42:00.64 8.30
2025-04-13T14:42:01.64 8.30
2025-04-13T14:42:02.64 8.28
2025-04-13T14:42:03.64 8.29
2025-04-13T14:42:04.64 8.28
2025-04-13T14:42:05.64 8.30
2025-04-13T14:42:06.64 8.32
2025-04-13T14:42:07.64 8.30
2025-04-13T14:42:08.64 8.29
2025-04-13T14:42:09.64 8.30
2025-04-13T14:42:10.64 8.30
2025-04-13T14:42:11.64 8.29
2025-04-13T14:42:12.64 8.31
2025-04-13T14:42:13.64 8.29
2025-04-13T14:42:14.64 8.31
2025-04-13T14:42:15.64 8.31
2025-04-13T14:42:16.64 8.30
2025-04-13T14:42:17.64 8.28
2025-04-13T14:42:18.64 8.28
2025-04-13T14:42:19.64 8.30
2025-04-13T14:42:20.64 8.27
2025-04-13T14:42:21.64 8.29
2025-04-13T14:42:22.64 8.28
2025-04-13T14:42:23.64 8.28
2025-04-13T14:42:24.64 8.28
2025-04-13T14:42:25.64 8.31
2025-04-13T14:42:26.64 8.29
2025-04-13T14:42:27.64 8.30
2025-04-13T14:42:28.64 8.32
2025-04-13T14:42:29.64 8.30
2025-04-13T14:42:30.65 8.31
2025-04-13T14:42:31.64 8.30
2025-04-13T14:42:32.64 8.31
2025-04-13T14:42:33.64 8.30
2025-04-13T14:42:34.64 8.30
2025-04-13T14:42:35.65 8.29
2025-04-13T14:42:36.65 8.30
2025-04-13T14:42:37.65 8.30
2025-04-13T14:42:38.65 8.32
2025-04-13T14:42:39.65 8.30
2025-04-13T14:42:40.65 8.31
2025-04-13T14:42:41.65 8.32
2025-04-13T14:42:42.65 8.30
2025-04-13T14:42:43.65 8.30
2025-04-13T14:42:44.65 8.30
2025-04-13T14:42:45.65 8.30
2025-04-13T14:42:46.65 8.27
2025-04-13T14:42:47.65 8.31
2025-04-13T14:42:48.65 8.31
2025-04-13T14:42:49.65 8.30
2025-04-13T14:42:50.65 8.28
2025-04-13T14:42:51.65 8.31
2025-04-13T14:42:52.65 8.30
2025-04-13T14:42:53.65 8.29
2025-04-13T14:42:54.65 8.31
2025-04-13T14:42:55.65 8.31
2025-04-13T14:42:56.65 8.28
2025-04-13T14:42:57.65 8.32
2025-04-13T14:42:58.65 8.28
2025-04-13T14:42:59.65 8.28
2025-04-13T14:43:00.65 8.29
2025-04-13T14:43:01.65 8.30
2025-04-13T14:43:02.65 8.32
2025-04-13T14:43:03.65 8.29
2025-04-13T14:43:04.65 8.30
2025-04-13T14:43:05.65 8.28
2025-04-13T14:43:06.65 8.28
2025-04-13T14:43:07.65 8.30
2025-04-13T14:43:08.65 8.31
2025-04-13T14:43:09.65 8.30
2025-04-13T14:43:10.65 8.31
2025-04-13T14:43:11.65 8.30
2025-04-13T14:43:12.65 8.28
2025-04-13T14:43:13.65 8.31
2025-04-13T14:43:14.65 8.31
2025-04-13T14:43:15.65 8.30
2025-04-13T14:43:16.65 8.28
2025-04-13T14:43:17.65 8.30
2025-04-13T14:43:18.65 8.32
2025-04-13T14:43:19.65 8.29
2025-04-13T14:43:20.65 8.30
2025-04-13T14:43:21.65 8.28
2025-04-13T14:43:22.65 8.33
2025-04-13T14:43:23.65 8.30
2025-04-13T14:43:24.65 8.29
2025-04-13T14:43:25.65 8.29
2025-04-13T14:43:26.65 8.30
2025-04-13T14:43:27.65 8.29
2025-04-13T14:43:28.65 8.30
2025-04-13T14:43:29.65 8.29
2025-04-13T14:43:30.65 8.30
2025-04-13T14:43:31.65 8.29
2025-04-13T14:43:32.65 8.30
2025-04-13T14:43:33.65 8.28
2025-04-13T14:43:34.65 8.28
2025-04-13T14:43:35.65 8.30
2025-04-13T14:43:36.65 8.30
2025-04-13T14:43:37.65 8.31
2025-04-13T14:43:38.65 8.28
2025-04-13T14:43:39.65 8.30
2025-04-13T14:43:40.65 8.29
2025-04-13T14:43:41.65 8.29
2025-04-13T14:43:42.65 8.29
2025-04-13T14:43:43.65 8.28
2025-04-13T14:43:44.65 8.32
2025-04-13T14:43:45.65 8.30
2025-04-13T14:43:46.65 8.30
2025-04-13T14:43:47.65 8.30
2025-04-13T14:43:48.65 8.30
2025-04-13T14:43:49.65 8.30
2025-04-13T14:43:50.65 8.30
2025-04-13T14:43:51.65 8.30
2025-04-13T14:43:52.65 8.28
2025-04-13T14:43:53.65 8.30
2025-04-13T14:43:54.65 8.30
2025-04-13T14:43:55.65 8.31
2025-04-13T14:43:56.65 8.29
2025-04-13T14:43:57.65 8.30
2025-04-13T14:43:58.65 8.32
2025-04-13T14:43:59.65 8.32
2025-04-13T14:44:00.65 8.29
2025-04-13T14:44:01.65 8.30
2025-04-13T14:44:02.65 8.32
2025-04-13T14:44:03.65 8.29
2025-04-13T14:44:04.65 8.31
2025-04-13T14:44:05.65 8.30
2025-04-13T14:44:06.65 8.30
2025-04-13T14:44:07.65 8.30
2025-04-13T14:44:08.65 8.30
2025-04-13T14:44:09.65 8.30
2025-04-13T14:44:10.65 8.28
2025-04-13T14:44:11.65 8.30
2025-04-13T14:44:12.65 8.31
2025-04-13T14:44:13.65 8.32
2025-04-13T14:44:14.65 8.31
2025-04-13T14:44:15.65 8.28
2025-04-13T14:44:16.65 8.32
2025-04-13T14:44:17.65 8.32
2025-04-13T14:44:18.65 8.32
2025-04-13T14:44:19.65 8.28
2025-04-13T14:44:20.65 8.30
2025-04-13T14:44:21.65 8.32
2025-04-13T14:44:22.65 8.29
2025-04-13T14:44:23.65 8.31
2025-04-13T14:44:24.65 8.30
2025-04-13T14:44:25.65 8.30
2025-04-13T14:44:26.65 8.28
2025-04-13T14:44:27.65 8.31
2025-04-13T14:44:28.65 8.30
2025-04-13T14:44:29.65 8.30
2025-04-13T14:44:30.65 8.32
2025-04-13T14:44:31.65 8.30
2025-04-13T14:44:32.65 8.28
2025-04-13T14:44:33.65 8.28
2025-04-13T14:44:34.65 8.30
2025-04-13T14:44:35.65 8.29
2025-04-13T14:44:36.65 8.31
2025-04-13T14:44:37.65 8.28
2025-04-13T14:44:38.65 8.31
2025-04-13T14:44:39.65 8.28
2025-04-13T14:44:40.65 8.32
2025-04-13T14:44:41.65 8.27
2025-04-13T14:44:42.65 8.32
2025-04-13T14:44:43.65 8.31
2025-04-13T14:44:44.65 8.30
2025-04-13T14:44:45.65 8.29
2025-04-13T14:44:46.65 8.31
2025-04-13T14:44:47.65 8.31
2025-04-13T14:44:48.65 8.32
2025-04-13T14:44:49.65 8.32
2025-04-13T14:44:50.65 8.32
2025-04-13T14:44:51.65 8.30
2025-04-13T14:44:52.65 8.30
2025-04-13T14:44:53.65 8.30
2025-04-13T14:44:54.65 8.31
2025-04-13T14:44:55.65 8.30
2025-04-13T14:44:56.65 8.33
2025-04-13T14:44:57.65 8.30
2025-04-13T14:44:58.65 8.30
2025-04-13T14:44:59.65 8.30
2025-04-13T14:45:00.65 8.30
2025-04-13T14:45:01.65 8.30
2025-04-13T14:45:02.65 8.30
2025-04-13T14:45:03.65 8.29
2025-04-13T14:45:04.65 8.32
2025-04-13T14:45:05.65 8.29
2025-04-13T14:45:06.65 8.28
2025-04-13T14:45:07.65 8.30
2025-04-13T14:45:08.65 8.30
2025-04-13T14:45:09.65 8.30
2025-04-13T14:45:10.65 8.32
2025-04-13T14:45:11.65 8.29
2025-04-13T14:45:12.65 8.30
2025-04-13T14:45:13.65 8.32
2025-04-13T14:45:14.65 8.31
2025-04-13T14:45:15.65 8.30
2025-04-13T14:45:16.65 8.29
2025-04-13T14:45:17.65 8.32
2025-04-13T14:45:18.65 8.30
2025-04-13T14:45:19.65 8.27
2025-04-13T14:45:20.65 8.28
2025-04-13T14:45:21.65 8.30
2025-04-13T14:45:22.65 8.28
2025-04-13T14:45:23.65 8.30
2025-04-13T14:45:24.65 8.28
2025-04-13T14:45:25.65 8.31
2025-04-13T14:45:26.65 8.30
2025-04-13T14:45:27.65 8.31
2025-04-13T14:45:28.65 8.31
2025-04-13T14:45:29.65 8.30
2025-04-13T14:45:30.65 8.28
2025-04-13T14:45:31.65 8.32
2025-04-13T14:45:32.65 8.28
2025-04-13T14:45:33.65 8.29
2025-04-13T14:45:34.65 8.32
2025-04-13T14:45:35.65 8.30
2025-04-13T14:45:36.65 8.28
2025-04-13T14:45:37.65 8.31
2025-04-13T14:45:38.65 8.32
2025-04-13T14:45:39.65 8.32
2025-04-13T14:45:40.65 8.30
2025-04-13T14:45:41.65 8.31
2025-04-13T14:45:42.65 8.30
2025-04-13T14:45:43.65 8.28
2025-04-13T14:45:44.65 8.30
2025-04-13T14:45:45.65 8.29
2025-04-13T14:45:46.65 8.30
2025-04-13T14:45:47.65 8.31
2025-04-13T14:45:48.65 8.29
2025-04-13T14:45:49.65 8.28
2025-04-13T14:45:50.65 8.30
2025-04-13T14:45:51.65 8.28
2025-04-13T14:45:52.65 8.29
2025-04-13T14:45:53.65 8.30
2025-04-13T14:45:54.65 8.30
2025-04-13T14:45:55.65 8.30
2025-04-13T14:45:56.65 8.30
2025-04-13T14:45:57.65 8.32
2025-04-13T14:45:58.65 8.30
2025-04-13T14:45:59.65 8.30
2025-04-13T14:46:00.65 8.31
2025-04-13T14:46:01.65 8.30
2025-04-13T14:46:02.65 8.32
2025-04-13T14:46:03.65 8.32
2025-04-13T14:46:04.65 8.33
2025-04-13T14:46:05.65 8.28
2025-04-13T14:46:06.65 8.30
2025-04-13T14:46:07.65 8.28
2025-04-13T14:46:08.65 8.30
2025-04-13T14:46:09.65 8.31
2025-04-13T14:46:10.65 8.30
2025-04-13T14:46:11.65 8.30
2025-04-13T14:46:12.65 8.29
2025-04-13T14:46:13.65 8.32
2025-04-13T14:46:14.65 8.31
2025-04-13T14:46:15.65 8.30
2025-04-13T14:46:16.65 8.29
2025-04-13T14:46:17.65 8.30
2025-04-13T14:46:18.65 8.30
2025-04-13T14:46:19.65 8.28
2025-04-13T14:46:20.65 8.32
2025-04-13T14:46:21.65 8.33
2025-04-13T14:46:22.65 8.30
2025-04-13T14:46:23.65 8.31
2025-04-13T14:46:24.65 8.30
2025-04-13T14:46:25.65 8.29
2025-04-13T14:46:26.65 8.29
2025-04-13T14:46:27.65 8.31
2025-04-13T14:46:28.65 8.31
2025-04-13T14:46:29.65 8.31
2025-04-13T14:46:30.65 8.30
2025-04-13T14:46:31.65 8.30
2025-04-13T14:46:32.65 8.32
2025-04-13T14:46:33.65 8.31
2025-04-13T14:46:34.65 8.32
2025-04-13T14:46:35.65 8.33
2025-04-13T14:46:36.65 8.28
2025-04-13T14:46:37.65 8.30
2025-04-13T14:46:38.65 8.31
2025-04-13T14:46:39.65 8.30
2025-04-13T14:46:40.65 8.32
2025-04-13T14:46:41.65 8.30
2025-04-13T14:46:42.65 8.31
2025-04-13T14:46:43.65 8.28
2025-04-13T14:46:44.65 8.30
2025-04-13T14:46:45.65 8.30
2025-04-13T14:46:46.65 8.30
2025-04-13T14:46:47.65 8.32
2025-04-13T14:46:48.65 8.30
2025-04-13T14:46:49.65 8.29
2025-04-13T14:46:50.65 8.28
2025-04-13T14:46:51.65 8.31
2025-04-13T14:46:52.65 8.30
2025-04-13T14:46:53.65 8.30
2025-04-13T14:46:54.65 8.32
2025-04-13T14:46:55.65 8.31
2025-04-13T14:46:56.65 8.33
2025-04-13T14:46:57.65 8.30
2025-04-13T14:46:58.65 8.31
2025-04-13T14:46:59.65 8.30
2025-04-13T14:47:00.65 8.28
2025-04-13T14:47:01.65 8.29
2025-04-13T14:47:02.65 8.30
2025-04-13T14:47:03.65 8.30
2025-04-13T14:47:04.65 8.30
2025-04-13T14:47:05.65 8.30
2025-04-13T14:47:06.65 8.30
2025-04-13T14:47:07.65 8.31
2025-04-13T14:47:08.65 8.31
2025-04-13T14:47:09.65 8.32
2025-04-13T14:47:10.65 8.29
2025-04-13T14:47:11.65 8.32
2025-04-13T14:47:12.65 8.30
2025-04-13T14:47:13.65 8.31
2025-04-13T14:47:14.65 8.30
2025-04-13T14:47:15.65 8.30
2025-04-13T14:47:16.65 8.31
2025-04-13T14:47:17.65 8.30
2025-04-13T14:47:18.65 8.30
2025-04-13T14:47:19.65 8.30
2025-04-13T14:47:20.65 8.30
2025-04-13T14:47:21.65 8.30
2025-04-13T14:47:22.65 8.30
2025-04-13T14:47:23.65 8.30
2025-04-13T14:47:24.65 8.32
2025-04-13T14:47:25.65 8.32
2025-04-13T14:47:26.65 8.30
2025-04-13T14:47:27.65 8.30
2025-04-13T14:47:28.65 8.31
2025-04-13T14:47:29.65 8.33
2025-04-13T14:47:30.65 8.29
2025-04-13T14:47:31.65 8.31
2025-04-13T14:47:32.65 8.30
2025-04-13T14:47:33.65 8.31
2025-04-13T14:47:34.65 8.29
2025-04-13T14:47:35.65 8.30
2025-04-13T14:47:36.65 8.30
2025-04-13T14:47:37.65 8.30
2025-04-13T14:47:38.65 8.28
2025-04-13T14:47:39.65 8.29
2025-04-13T14:47:40.65 8.31
2025-04-13T14:47:41.65 8.28
2025-04-13T14:47:42.65 8.28
2025-04-13T14:47:43.65 8.28
2025-04-13T14:47:44.65 8.30
2025-04-13T14:47:45.65 8.31
2025-04-13T14:47:46.65 8.31
2025-04-13T14:47:47.65 8.28
2025-04-13T14:47:48.65 8.31
2025-04-13T14:47:49.65 8.32
2025-04-13T14:47:50.65 8.30
2025-04-13T14:47:51.66 8.32
2025-04-13T14:47:52.65 8.31
2025-04-13T14:47:53.65 8.30
2025-04-13T14:47:54.66 8.28
2025-04-13T14:47:55.66 8.29
2025-04-13T14:47:56.66 8.29
2025-04-13T14:47:57.66 8.29
2025-04-13T14:47:58.66 8.30
2025-04-13T14:47:59.66 8.32
2025-04-13T14:48:00.66 8.31
2025-04-13T14:48:01.66 8.30
2025-04-13T14:48:02.66 8.31
2025-04-13T14:48:03.66 8.30
2025-04-13T14:48:04.66 8.29
2025-04-13T14:48:05.66 8.28
2025-04-13T14:48:06.66 8.28
2025-04-13T14:48:07.66 8.31
2025-04-13T14:48:08.66 8.31
2025-04-13T14:48:09.66 8.30
2025-04-13T14:48:10.66 8.30
2025-04-13T14:48:11.66 8.32
2025-04-13T14:48:12.66 8.33
2025-04-13T14:48:13.66 8.32
2025-04-13T14:48:14.66 8.32
2025-04-13T14:48:15.66 8.29
2025-04-13T14:48:16.66 8.28
2025-04-13T14:48:17.66 8.29
2025-04-13T14:48:18.66 8.32
2025-04-13T14:48:19.66 8.32
2025-04-13T14:48:20.66 8.32
2025-04-13T14:48:21.66 8.30
2025-04-13T14:48:22.66 8.30
2025-04-13T14:48:23.66 8.29
2025-04-13T14:48:24.66 8.30
2025-04-13T14:48:25.66 8.30
2025-04-13T14:48:26.66 8.32
2025-04-13T14:48:27.66 8.31
2025-04-13T14:48:28.66 8.32
2025-04-13T14:48:29.66 8.31
2025-04-13T14:48:30.66 8.30
2025-04-13T14:48:31.66 8.31
2025-04-13T14:48:32.66 8.30
2025-04-13T14:48:33.66 8.31
2025-04-13T14:48:34.66 8.31
2025-04-13T14:48:35.66 8.30
2025-04-13T14:48:36.66 8.29
2025-04-13T14:48:37.66 8.31
2025-04-13T14:48:38.66 8.31
2025-04-13T14:48:39.66 8.30
2025-04-13T14:48:40.66 8.30
2025-04-13T14:48:41.66 8.28
2025-04-13T14:48:42.66 8.30
2025-04-13T14:48:43.66 8.32
2025-04-13T14:48:44.66 8.30
2025-04-13T14:48:45.66 8.32
2025-04-13T14:48:46.66 8.30
2025-04-13T14:48:47.66 8.30
2025-04-13T14:48:48.66 8.30
2025-04-13T14:48:49.66 8.28
2025-04-13T14:48:50.66 8.30
2025-04-13T14:48:51.66 8.27
2025-04-13T14:48:52.66 8.29
2025-04-13T14:48:53.66 8.31
2025-04-13T14:48:54.66 8.28
2025-04-13T14:48:55.66 8.31
2025-04-13T14:48:56.66 8.30
2025-04-13T14:48:57.66 8.30
2025-04-13T14:48:58.66 8.28
2025-04-13T14:48:59.66 8.32
2025-04-13T14:49:00.66 8.28
2025-04-13T14:49:01.66 8.29
2025-04-13T14:49:02.66 8.29
2025-04-13T14:49:03.66 8.31
2025-04-13T14:49:04.66 8.31
2025-04-13T14:49:05.66 8.32
2025-04-13T14:49:06.66 8.30
2025-04-13T14:49:07.66 8.30
2025-04-13T14:49:08.66 8.28
2025-04-13T14:49:09.66 8.32
2025-04-13T14:49:10.66 8.30
2025-04-13T14:49:11.66 8.30
2025-04-13T14:49:12.66 8.30
2025-04-13T14:49:13.66 8.32
2025-04-13T14:49:14.66 8.28
2025-04-13T14:49:15.66 8.31
2025-04-13T14:49:16.66 8.28
2025-04-13T14:49:17.66 8.32
2025-04-13T14:49:18.66 8.30
2025-04-13T14:49:19.67 8.28
2025-04-13T14:49:20.65 8.31
2025-04-13T14:49:21.65 8.29
2025-04-13T14:49:22.65 8.30
2025-04-13T14:49:23.65 8.29
2025-04-13T14:49:24.65 8.30
2025-04-13T14:49:25.65 8.32
2025-04-13T14:49:26.65 8.31
2025-04-13T14:49:27.65 8.29
2025-04-13T14:49:28.65 8.30
2025-04-13T14:49:29.65 8.30
2025-04-13T14:49:30.65 8.30
2025-04-13T14:49:31.65 8.30
2025-04-13T14:49:32.65 8.30
2025-04-13T14:49:33.65 8.29
2025-04-13T14:49:34.65 8.32
2025-04-13T14:49:35.65 8.30
2025-04-13T14:49:36.65 8.30
2025-04-13T14:49:37.65 8.28
2025-04-13T14:49:38.65 8.32
2025-04-13T14:49:39.65 8.29
2025-04-13T14:49:40.65 8.30
2025-04-13T14:49:41.65 8.30
2025-04-13T14:49:42.65 8.30
2025-04-13T14:49:43.65 8.30
2025-04-13T14:49:44.65 8.30
2025-04-13T14:49:45.65 8.32
2025-04-13T14:49:46.65 8.30
2025-04-13T14:49:47.65 8.30
2025-04-13T14:49:48.65 8.30
2025-04-13T14:49:49.65 8.28
2025-04-13T14:49:50.65 8.28
2025-04-13T14:49:51.65 8.27
2025-04-13T14:49:52.65 8.30
2025-04-13T14:49:53.65 8.29
2025-04-13T14:49:54.65 8.32
2025-04-13T14:49:55.65 8.29
2025-04-13T14:49:56.65 8.32
2025-04-13T14:49:57.65 8.30
2025-04-13T14:49:58.65 8.28
2025-04-13T14:49:59.65 8.30
2025-04-13T14:50:00.65 8.29
2025-04-13T14:50:01.65 8.31
2025-04-13T14:50:02.65 8.29
2025-04-13T14:50:03.65 8.29
2025-04-13T14:50:04.65 8.29
2025-04-13T14:50:05.65 8.29
2025-04-13T14:50:06.65 8.30
2025-04-13T14:50:07.65 8.30
2025-04-13T14:50:08.65 8.30
2025-04-13T14:50:09.65 8.30
2025-04-13T14:50:10.65 8.31
2025-04-13T14:50:11.65 8.30
2025-04-13T14:50:12.65 8.32
2025-04-13T14:50:13.65 8.30
2025-04-13T14:50:14.65 8.31
2025-04-13T14:50:15.65 8.28
2025-04-13T14:50:16.65 8.31
2025-04-13T14:50:17.65 8.30
2025-04-13T14:50:18.65 8.30
2025-04-13T14:50:19.65 8.32
2025-04-13T14:50:20.65 8.30
2025-04-13T14:50:21.65 8.28
2025-04-13T14:50:22.65 8.29
2025-04-13T14:50:23.65 8.29
2025-04-13T14:50:24.65 8.30
2025-04-13T14:50:25.65 8.30
2025-04-13T14:50:26.65 8.32
2025-04-13T14:50:27.65 8.32
2025-04-13T14:50:28.65 8.29
2025-04-13T14:50:29.65 8.30
2025-04-13T14:50:30.65 8.30
2025-04-13T14:50:31.65 8.27
2025-04-13T14:50:32.65 8.29
2025-04-13T14:50:33.65 8.29
2025-04-13T14:50:34.65 8.30
2025-04-13T14:50:35.65 8.30
2025-04-13T14:50:36.65 8.30
2025-04-13T14:50:37.65 8.28
2025-04-13T14:50:38.65 8.28
2025-04-13T14:50:39.65 8.30
2025-04-13T14:50:40.65 8.30
2025-04-13T14:50:41.65 8.30
2025-04-13T14:50:42.65 8.30
2025-04-13T14:50:43.65 8.27
2025-04-13T14:50:44.65 8.28
2025-04-13T14:50:45.65 8.31
2025-04-13T14:50:46.65 8.30
2025-04-13T14:50:47.65 8.32
2025-04-13T14:50:48.65 8.30
2025-04-13T14:50:49.65 8.30
2025-04-13T14:50:50.65 8.30
2025-04-13T14:50:51.65 8.29
2025-04-13T14:50:52.65 8.31
2025-04-13T14:50:53.65 8.30
2025-04-13T14:50:54.65 8.30
2025-04-13T14:50:55.65 8.28
2025-04-13T14:50:56.65 8.27
2025-04-13T14:50:57.65 8.30
2025-04-13T14:50:58.65 8.32
2025-04-13T14:50:59.65 8.32
2025-04-13T14:51:00.65 8.31
2025-04-13T14:51:01.65 8.32
2025-04-13T14:51:02.65 8.30
2025-04-13T14:51:03.65 8.29
2025-04-13T14:51:04.65 8.29
2025-04-13T14:51:05.65 8.28
2025-04-13T14:51:06.65 8.28
2025-04-13T14:51:07.65 8.28
2025-04-13T14:51:08.65 8.31
2025-04-13T14:51:09.65 8.28
2025-04-13T14:51:10.65 8.30
2025-04-13T14:51:11.65 8.31
2025-04-13T14:51:12.65 8.30
2025-04-13T14:51:13.65 8.30
2025-04-13T14:51:14.65 8.30
2025-04-13T14:51:15.65 8.29
2025-04-13T14:51:16.65 8.29
2025-04-13T14:51:17.65 8.30
2025-04-13T14:51:18.65 8.31
2025-04-13T14:51:19.65 8.28
2025-04-13T14:51:20.65 8.31
2025-04-13T14:51:21.65 8.29
2025-04-13T14:51:22.65 8.28
2025-04-13T14:51:23.65 8.28
2025-04-13T14:51:24.65 8.28
2025-04-13T14:51:25.65 8.30
2025-04-13T14:51:26.65 8.31
2025-04-13T14:51:27.65 8.29
2025-04-13T14:51:28.65 8.29
2025-04-13T14:51:29.65 8.30
2025-04-13T14:51:30.65 8.29
2025-04-13T14:51:31.65 8.29
2025-04-13T14:51:32.65 8.30
2025-04-13T14:51:33.65 8.28
2025-04-13T14:51:34.65 8.28
2025-04-13T14:51:35.65 8.30
2025-04-13T14:51:36.65 8.30
2025-04-13T14:51:37.65 8.28
2025-04-13T14:51:38.65 8.28
2025-04-13T14:51:39.65 8.32
2025-04-13T14:51:40.65 8.31
2025-04-13T14:51:41.65 8.28
2025-04-13T14:51:42.65 8.32
2025-04-13T14:51:43.65 8.28
2025-04-13T14:51:44.65 8.32
2025-04-13T14:51:45.65 8.30
2025-04-13T14:51:46.65 8.31
2025-04-13T14:51:47.65 8.30
2025-04-13T14:51:48.65 8.29
2025-04-13T14:51:49.65 8.29
2025-04-13T14:51:50.65 8.29
2025-04-13T14:51:51.65 8.32
2025-04-13T14:51:52.65 8.29
2025-04-13T14:51:53.65 8.30
2025-04-13T14:51:54.65 8.28
2025-04-13T14:51:55.65 8.32
2025-04-13T14:51:56.65 8.31
2025-04-13T14:51:57.65 8.28
2025-04-13T14:51:58.65 8.30
2025-04-13T14:51:59.65 8.32
2025-04-13T14:52:00.65 8.29
2025-04-13T14:52:01.65 8.31
2025-04-13T14:52:02.65 8.31
2025-04-13T14:52:03.65 8.30
2025-04-13T14:52:04.65 8.29
2025-04-13T14:52:05.65 8.29
2025-04-13T14:52:06.65 8.30
2025-04-13T14:52:07.65 8.31
2025-04-13T14:52:08.65 8.30
2025-04-13T14:52:09.65 8.29
2025-04-13T14:52:10.65 8.30
2025-04-13T14:52:11.65 8.28
2025-04-13T14:52:12.65 8.31
2025-04-13T14:52:13.65 8.30
2025-04-13T14:52:14.65 8.30
2025-04-13T14:52:15.65 8.29
2025-04-13T14:52:16.65 8.29
2025-04-13T14:52:17.65 8.31
2025-04-13T14:52:18.65 8.32
2025-04-13T14:52:19.65 8.30
2025-04-13T14:52:20.65 8.32
2025-04-13T14:52:21.65 8.29
2025-04-13T14:52:22.65 8.30
2025-04-13T14:52:23.65 8.28
2025-04-13T14:52:24.65 8.30
2025-04-13T14:52:25.65 8.29
2025-04-13T14:52:26.65 8.29
2025-04-13T14:52:27.65 8.32
2025-04-13T14:52:28.65 8.30
2025-04-13T14:52:29.66 8.26
2025-04-13T14:52:30.65 8.30
2025-04-13T14:52:31.65 8.30
2025-04-13T14:52:32.65 8.31
2025-04-13T14:52:33.65 8.31
2025-04-13T14:52:34.65 8.30
2025-04-13T14:52:35.65 8.31
2025-04-13T14:52:36.65 8.30
2025-04-13T14:52:37.65 8.33
2025-04-13T14:52:38.65 8.30
2025-04-13T14:52:39.65 8.30
2025-04-13T14:52:40.65 8.30
2025-04-13T14:52:41.65 8.30
2025-04-13T14:52:42.65 8.29
2025-04-13T14:52:43.65 8.31
2025-04-13T14:52:44.65 8.30
2025-04-13T14:52:45.65 8.30
2025-04-13T14:52:46.65 8.30
2025-04-13T14:52:47.65 8.28
2025-04-13T14:52:48.65 8.30
2025-04-13T14:52:49.65 8.28
2025-04-13T14:52:50.65 8.29
2025-04-13T14:52:51.65 8.27
2025-04-13T14:52:52.65 8.31
2025-04-13T14:52:53.65 8.28
2025-04-13T14:52:54.65 8.29
2025-04-13T14:52:55.65 8.29
2025-04-13T14:52:56.65 8.30
2025-04-13T14:52:57.65 8.29
2025-04-13T14:52:58.65 8.27
2025-04-13T14:52:59.65 8.30
2025-04-13T14:53:00.65 8.28
2025-04-13T14:53:01.65 8.30
2025-04-13T14:53:02.65 8.30
2025-04-13T14:53:03.65 8.30
2025-04-13T14:53:04.65 8.30
2025-04-13T14:53:05.66 8.28
2025-04-13T14:53:06.65 8.31
2025-04-13T14:53:07.65 8.30
2025-04-13T14:53:08.65 8.31
2025-04-13T14:53:09.65 8.30
2025-04-13T14:53:10.65 8.30
2025-04-13T14:53:11.67 8.30
2025-04-13T14:53:12.64 8.32
2025-04-13T14:53:13.65 8.32
2025-04-13T14:53:14.65 8.30
2025-04-13T14:53:15.65 8.28
2025-04-13T14:53:16.65 8.30
2025-04-13T14:53:17.65 8.32
2025-04-13T14:53:18.65 8.31
2025-04-13T14:53:19.65 8.32
2025-04-13T14:53:20.65 8.31
2025-04-13T14:53:21.65 8.33
2025-04-13T14:53:22.65 8.32
2025-04-13T14:53:23.65 8.32
2025-04-13T14:53:24.65 8.30
2025-04-13T14:53:25.65 8.31
2025-04-13T14:53:26.65 8.29
2025-04-13T14:53:27.65 8.30
2025-04-13T14:53:28.65 8.30
2025-04-13T14:53:29.65 8.30
2025-04-13T14:53:30.65 8.30
2025-04-13T14:53:31.65 8.30
2025-04-13T14:53:32.65 8.30
2025-04-13T14:53:33.65 8.28
2025-04-13T14:53:34.65 8.32
2025-04-13T14:53:35.65 8.30
2025-04-13T14:53:36.65 8.32
2025-04-13T14:53:37.65 8.31
2025-04-13T14:53:38.65 8.29
2025-04-13T14:53:39.65 8.30
2025-04-13T14:53:40.65 8.30
2025-04-13T14:53:41.65 8.31
2025-04-13T14:53:42.65 8.29
2025-04-13T14:53:43.65 8.30
2025-04-13T14:53:44.65 8.31
2025-04-13T14:53:45.65 8.30
2025-04-13T14:53:46.65 8.30
2025-04-13T14:53:47.65 8.31
2025-04-13T14:53:48.65 8.30
2025-04-13T14:53:49.65 8.30
2025-04-13T14:53:50.65 8.28
2025-04-13T14:53:51.65 8.31
2025-04-13T14:53:52.65 8.30
2025-04-13T14:53:53.65 8.31
2025-04-13T14:53:54.65 8.31
2025-04-13T14:53:55.65 8.28
2025-04-13T14:53:56.65 8.30
2025-04-13T14:53:57.65 8.30
2025-04-13T14:53:58.65 8.28
2025-04-13T14:53:59.65 8.28
2025-04-13T14:54:00.65 8.32
2025-04-13T14:54:01.65 8.29
2025-04-13T14:54:02.65 8.29
2025-04-13T14:54:03.65 8.29
2025-04-13T14:54:04.65 8.30
2025-04-13T14:54:05.65 8.30
2025-04-13T14:54:06.65 8.30
2025-04-13T14:54:07.65 8.32
2025-04-13T14:54:08.65 8.31
2025-04-13T14:54:09.65 8.28
2025-04-13T14:54:10.65 8.29
2025-04-13T14:54:11.65 8.30
2025-04-13T14:54:12.65 8.31
2025-04-13T14:54:13.65 8.30
2025-04-13T14:54:14.65 8.31
2025-04-13T14:54:15.65 8.32
2025-04-13T14:54:16.65 8.28
2025-04-13T14:54:17.65 8.29
2025-04-13T14:54:18.65 8.30
2025-04-13T14:54:19.65 8.32
2025-04-13T14:54:20.65 8.29
2025-04-13T14:54:21.65 8.30
2025-04-13T14:54:22.65 8.28
2025-04-13T14:54:23.65 8.30
2025-04-13T14:54:24.65 8.28
2025-04-13T14:54:25.65 8.28
2025-04-13T14:54:26.65 8.30
2025-04-13T14:54:27.65 8.30
2025-04-13T14:54:28.65 8.31
2025-04-13T14:54:29.65 8.28
2025-04-13T14:54:30.65 8.32
2025-04-13T14:54:31.65 8.30
2025-04-13T14:54:32.65 8.28
2025-04-13T14:54:33.65 8.31
2025-04-13T14:54:34.65 8.28
2025-04-13T14:54:35.65 8.31
2025-04-13T14:54:36.65 8.30
2025-04-13T14:54:37.65 8.30
2025-04-13T14:54:38.65 8.32
2025-04-13T14:54:39.65 8.30
2025-04-13T14:54:40.65 8.29
2025-04-13T14:54:41.65 8.32
2025-04-13T14:54:42.65 8.29
2025-04-13T14:54:43.65 8.28
2025-04-13T14:54:44.65 8.29
2025-04-13T14:54:45.65 8.30
2025-04-13T14:54:46.65 8.31
2025-04-13T14:54:47.65 8.29
2025-04-13T14:54:48.65 8.29
2025-04-13T14:54:49.65 8.28
2025-04-13T14:54:50.65 8.28
2025-04-13T14:54:51.65 8.28
2025-04-13T14:54:52.65 8.27
2025-04-13T14:54:53.65 8.31
2025-04-13T14:54:54.65 8.32
2025-04-13T14:54:55.65 8.26
2025-04-13T14:54:56.65 8.29
2025-04-13T14:54:57.65 8.30
2025-04-13T14:54:58.65 8.30
2025-04-13T14:54:59.65 8.32
2025-04-13T14:55:00.65 8.30
2025-04-13T14:55:01.65 8.28
2025-04-13T14:55:02.65 8.29
2025-04-13T14:55:03.65 8.28
2025-04-13T14:55:04.65 8.30
2025-04-13T14:55:05.65 8.30
2025-04-13T14:55:06.65 8.30
2025-04-13T14:55:07.65 8.31
2025-04-13T14:55:08.65 8.31
2025-04-13T14:55:09.65 8.28
2025-04-13T14:55:10.65 8.31
2025-04-13T14:55:11.65 8.30
2025-04-13T14:55:12.65 8.30
2025-04-13T14:55:13.65 8.30
2025-04-13T14:55:14.65 8.31
2025-04-13T14:55:15.65 8.28
2025-04-13T14:55:16.65 8.31
2025-04-13T14:55:17.65 8.30
2025-04-13T14:55:18.65 8.29
2025-04-13T14:55:19.65 8.27
2025-04-13T14:55:20.65 8.29
2025-04-13T14:55:21.65 8.29
2025-04-13T14:55:22.65 8.30
2025-04-13T14:55:23.65 8.28
2025-04-13T14:55:24.65 8.30
2025-04-13T14:55:25.65 8.28
2025-04-13T14:55:26.65 8.29
2025-04-13T14:55:27.65 8.30
2025-04-13T14:55:28.65 8.28
2025-04-13T14:55:29.65 8.29
2025-04-13T14:55:30.65 8.31
2025-04-13T14:55:31.65 8.31
2025-04-13T14:55:32.65 8.30
2025-04-13T14:55:33.65 8.29
2025-04-13T14:55:34.65 8.33
2025-04-13T14:55:35.65 8.30
2025-04-13T14:55:36.65 8.30
2025-04-13T14:55:37.65 8.32
2025-04-13T14:55:38.65 8.30
2025-04-13T14:55:39.65 8.30
2025-04-13T14:55:40.65 8.28
2025-04-13T14:55:41.65 8.30
2025-04-13T14:55:42.65 8.27
2025-04-13T14:55:43.65 8.30
2025-04-13T14:55:44.65 8.30
2025-04-13T14:55:45.65 8.29
2025-04-13T14:55:46.65 8.30
2025-04-13T14:55:47.65 8.30
2025-04-13T14:55:48.65 8.27
2025-04-13T14:55:49.65 8.30
2025-04-13T14:55:50.65 8.28
2025-04-13T14:55:51.65 8.28
2025-04-13T14:55:52.65 8.28
2025-04-13T14:55:53.65 8.30
2025-04-13T14:55:54.65 8.30
2025-04-13T14:55:55.65 8.28
2025-04-13T14:55:56.65 8.30
2025-04-13T14:55:57.65 8.28
2025-04-13T14:55:58.65 8.30
2025-04-13T14:55:59.65 8.30
2025-04-13T14:56:00.65 8.30
2025-04-13T14:56:01.65 8.33
2025-04-13T14:56:02.65 8.28
2025-04-13T14:56:03.65 8.28
2025-04-13T14:56:04.65 8.28
2025-04-13T14:56:05.65 8.30
2025-04-13T14:56:06.65 8.30
2025-04-13T14:56:07.65 8.30
2025-04-13T14:56:08.65 8.28
2025-04-13T14:56:09.65 8.31
2025-04-13T14:56:10.65 8.28
2025-04-13T14:56:11.65 8.32
2025-04-13T14:56:12.65 8.32
2025-04-13T14:56:13.65 8.29
2025-04-13T14:56:14.65 8.29
2025-04-13T14:56:15.65 8.30
2025-04-13T14:56:16.65 8.28
2025-04-13T14:56:17.65 8.32
2025-04-13T14:56:18.65 8.28
2025-04-13T14:56:19.65 8.30
2025-04-13T14:56:20.65 8.30
2025-04-13T14:56:21.65 8.28
2025-04-13T14:56:22.65 8.30
2025-04-13T14:56:23.65 8.27
2025-04-13T14:56:24.65 8.29
2025-04-13T14:56:25.65 8.28
2025-04-13T14:56:26.65 8.32
2025-04-13T14:56:27.65 8.29
2025-04-13T14:56:28.65 8.29
2025-04-13T14:56:29.65 8.28
2025-04-13T14:56:30.65 8.31
2025-04-13T14:56:31.65 8.32
2025-04-13T14:56:32.65 8.31
2025-04-13T14:56:33.65 8.29
2025-04-13T14:56:34.65 8.28
2025-04-13T14:56:35.65 8.32
2025-04-13T14:56:36.65 8.31
2025-04-13T14:56:37.65 8.29
2025-04-13T14:56:38.65 8.31
2025-04-13T14:56:39.65 8.30
2025-04-13T14:56:40.65 8.30
2025-04-13T14:56:41.65 8.30
2025-04-13T14:56:42.65 8.30
2025-04-13T14:56:43.65 8.30
2025-04-13T14:56:44.65 8.31
2025-04-13T14:56:45.65 8.30
2025-04-13T14:56:46.65 8.30
2025-04-13T14:56:47.65 8.30
2025-04-13T14:56:48.65 8.32
2025-04-13T14:56:49.65 8.30
2025-04-13T14:56:50.65 8.30
2025-04-13T14:56:51.65 8.32
2025-04-13T14:56:52.65 8.31
2025-04-13T14:56:53.65 8.29
2025-04-13T14:56:54.65 8.30
2025-04-13T14:56:55.65 8.32
2025-04-13T14:56:56.65 8.28
2025-04-13T14:56:57.65 8.28
2025-04-13T14:56:58.65 8.30
2025-04-13T14:56:59.65 8.30
2025-04-13T14:57:00.65 8.27
2025-04-13T14:57:01.65 8.30
2025-04-13T14:57:02.65 8.28
2025-04-13T14:57:03.68 8.29
2025-04-13T14:57:04.64 8.30
2025-04-13T14:57:05.64 8.30
2025-04-13T14:57:06.64 8.31
2025-04-13T14:57:07.64 8.30
2025-04-13T14:57:08.64 8.31
2025-04-13T14:57:09.64 8.28
2025-04-13T14:57:10.64 8.32
2025-04-13T14:57:11.64 8.31
2025-04-13T14:57:12.64 8.30
2025-04-13T14:57:13.64 8.30
2025-04-13T14:57:14.64 8.30
2025-04-13T14:57:15.64 8.30
2025-04-13T14:57:16.64 8.28
2025-04-13T14:57:17.64 8.29
2025-04-13T14:57:18.64 8.32
2025-04-13T14:57:19.64 8.30
2025-04-13T14:57:20.64 8.28
2025-04-13T14:57:21.64 8.31
2025-04-13T14:57:22.64 8.30
2025-04-13T14:57:23.64 8.30
2025-04-13T14:57:24.64 8.32
2025-04-13T14:57:25.64 8.30
2025-04-13T14:57:26.64 8.30
2025-04-13T14:57:27.64 8.31
2025-04-13T14:57:28.64 8.31
2025-04-13T14:57:29.64 8.29
2025-04-13T14:57:30.64 8.28
2025-04-13T14:57:31.64 8.29
2025-04-13T14:57:32.64 8.30
2025-04-13T14:57:33.64 8.30
2025-04-13T14:57:34.64 8.29
2025-04-13T14:57:35.64 8.28
2025-04-13T14:57:36.64 8.29
2025-04-13T14:57:37.64 8.30
2025-04-13T14:57:38.64 8.27
2025-04-13T14:57:39.64 8.30
2025-04-13T14:57:40.64 8.28
2025-04-13T14:57:41.64 8.29
2025-04-13T14:57:42.64 8.30
2025-04-13T14:57:43.64 8.30
2025-04-13T14:57:44.64 8.26
2025-04-13T14:57:45.64 8.30
2025-04-13T14:57:46.64 8.29
2025-04-13T14:57:47.64 8.30
2025-04-13T14:57:48.64 8.28
2025-04-13T14:57:49.64 8.28
2025-04-13T14:57:50.64 8.30
2025-04-13T14:57:51.64 8.30
2025-04-13T14:57:52.64 8.29
2025-04-13T14:57:53.64 8.32
2025-04-13T14:57:54.64 8.29
2025-04-13T14:57:55.64 8.26
2025-04-13T14:57:56.64 8.30
2025-04-13T14:57:57.64 8.30
2025-04-13T14:57:58.64 8.30
2025-04-13T14:57:59.64 8.30
2025-04-13T14:58:00.64 8.28
2025-04-13T14:58:01.64 8.31
2025-04-13T14:58:02.64 8.30
2025-04-13T14:58:03.64 8.27
2025-04-13T14:58:04.64 8.27
2025-04-13T14:58:05.64 8.29
2025-04-13T14:58:06.64 8.30
2025-04-13T14:58:07.64 8.30
2025-04-13T14:58:08.64 8.28
2025-04-13T14:58:09.64 8.28
2025-04-13T14:58:10.64 8.30
2025-04-13T14:58:11.64 8.29
2025-04-13T14:58:12.64 8.29
2025-04-13T14:58:13.64 8.28
2025-04-13T14:58:14.64 8.29
2025-04-13T14:58:15.64 8.28
2025-04-13T14:58:16.64 8.28
2025-04-13T14:58:17.64 8.30
2025-04-13T14:58:18.64 8.30
2025-04-13T14:58:19.65 8.29
2025-04-13T14:58:20.64 8.28
2025-04-13T14:58:21.64 8.29
2025-04-13T14:58:22.64 8.28
2025-04-13T14:58:23.64 8.29
2025-04-13T14:58:24.64 8.28
2025-04-13T14:58:25.64 8.28
2025-04-13T14:58:26.64 8.29
2025-04-13T14:58:27.64 8.28
2025-04-13T14:58:28.64 8.28
2025-04-13T14:58:29.64 8.30
2025-04-13T14:58:30.65 8.29
2025-04-13T14:58:31.65 8.30
2025-04-13T14:58:32.65 8.29
2025-04-13T14:58:33.65 8.28
2025-04-13T14:58:34.65 8.30
2025-04-13T14:58:35.65 8.30
2025-04-13T14:58:36.65 8.29
2025-04-13T14:58:37.65 8.31
2025-04-13T14:58:38.65 8.30
2025-04-13T14:58:39.65 8.30
2025-04-13T14:58:40.65 8.29
2025-04-13T14:58:41.65 8.31
2025-04-13T14:58:42.65 8.30
2025-04-13T14:58:43.65 8.32
2025-04-13T14:58:44.65 8.28
2025-04-13T14:58:45.65 8.30
2025-04-13T14:58:46.65 8.30
2025-04-13T14:58:47.65 8.28
2025-04-13T14:58:48.65 8.30
2025-04-13T14:58:49.65 8.30
2025-04-13T14:58:50.65 8.28
2025-04-13T14:58:51.65 8.30
2025-04-13T14:58:52.65 8.29
2025-04-13T14:58:53.65 8.30
2025-04-13T14:58:54.65 8.30
2025-04-13T14:58:55.65 8.29
2025-04-13T14:58:56.65 8.30
2025-04-13T14:58:57.65 8.31
2025-04-13T14:58:58.65 8.30
2025-04-13T14:58:59.65 8.31
2025-04-13T14:59:00.65 8.29
2025-04-13T14:59:01.65 8.30
2025-04-13T14:59:02.65 8.32
2025-04-13T14:59:03.65 8.26
2025-04-13T14:59:04.65 8.30
2025-04-13T14:59:05.65 8.30
2025-04-13T14:59:06.65 8.31
2025-04-13T14:59:07.65 8.32
2025-04-13T14:59:08.65 8.30
2025-04-13T14:59:09.65 8.29
2025-04-13T14:59:10.65 8.32
2025-04-13T14:59:11.65 8.27
2025-04-13T14:59:12.65 8.31
2025-04-13T14:59:13.65 8.30
2025-04-13T14:59:14.65 8.30
2025-04-13T14:59:15.65 8.29
2025-04-13T14:59:16.65 8.30
2025-04-13T14:59:17.65 8.30
2025-04-13T14:59:18.65 8.29
2025-04-13T14:59:19.65 8.30
2025-04-13T14:59:20.65 8.32
2025-04-13T14:59:21.65 8.31
2025-04-13T14:59:22.65 8.30
2025-04-13T14:59:23.65 8.32
2025-04-13T14:59:24.65 8.29
2025-04-13T14:59:25.65 8.29
2025-04-13T14:59:26.65 8.30
2025-04-13T14:59:27.65 8.29
2025-04-13T14:59:28.65 8.28
2025-04-13T14:59:29.65 8.30
2025-04-13T14:59:30.65 8.30
2025-04-13T14:59:31.65 8.28
2025-04-13T14:59:32.65 8.30
2025-04-13T14:59:33.65 8.26
2025-04-13T14:59:34.65 8.28
2025-04-13T14:59:35.65 8.27
2025-04-13T14:59:36.65 8.29
2025-04-13T14:59:37.65 8.29
2025-04-13T14:59:38.65 8.30
2025-04-13T14:59:39.65 8.28
2025-04-13T14:59:40.65 8.30
2025-04-13T14:59:41.65 8.29
2025-04-13T14:59:42.65 8.30
2025-04-13T14:59:43.65 8.28
2025-04-13T14:59:44.65 8.28
2025-04-13T14:59:45.65 8.28
2025-04-13T14:59:46.65 8.30
2025-04-13T14:59:47.65 8.30
2025-04-13T14:59:48.65 8.28
2025-04-13T14:59:49.65 8.30
2025-04-13T14:59:50.65 8.28
2025-04-13T14:59:51.65 8.31
2025-04-13T14:59:52.65 8.29
2025-04-13T14:59:53.65 8.30
2025-04-13T14:59:54.65 8.28
2025-04-13T14:59:55.65 8.29
2025-04-13T14:59:56.65 8.30
2025-04-13T14:59:57.65 8.29
2025-04-13T14:59:58.65 8.29
2025-04-13T14:59:59.65 8.26
