# PBO Tiltmeter Data, format version 1.1
# http://pboweb.unavco.org/strain_data
#
# B204 marble204bwa2007
# Latitude     : +46.1360 degrees (WGS-84)
# Longitude    : -122.1690 degrees (WGS-84)
# Elevation    : 784 meters (WGS-84)
# Sensor Depth : 3.05 meters
# SEED Codes   : PB B204 TT LKD
#
# Timestamp (UTC)   Temperature (C)
2025-03-12T12:00:00.20 8.16
2025-03-12T12:00:01.20 8.17
2025-03-12T12:00:02.20 8.16
2025-03-12T12:00:03.20 8.17
2025-03-12T12:00:04.20 8.16
2025-03-12T12:00:05.20 8.16
2025-03-12T12:00:06.20 8.16
2025-03-12T12:00:07.20 8.14
2025-03-12T12:00:08.20 8.17
2025-03-12T12:00:09.20 8.16
2025-03-12T12:00:10.20 8.17
2025-03-12T12:00:11.20 8.18
2025-03-12T12:00:12.20 8.16
2025-03-12T12:00:13.20 8.18
2025-03-12T12:00:14.20 8.16
2025-03-12T12:00:15.20 8.17
2025-03-12T12:00:16.20 8.17
2025-03-12T12:00:17.20 8.15
2025-03-12T12:00:18.20 8.17
2025-03-12T12:00:19.20 8.16
2025-03-12T12:00:20.20 8.17
2025-03-12T12:00:21.20 8.18
2025-03-12T12:00:22.20 8.17
2025-03-12T12:00:23.20 8.14
2025-03-12T12:00:24.20 8.17
2025-03-12T12:00:25.20 8.17
2025-03-12T12:00:26.20 8.16
2025-03-12T12:00:27.20 8.17
2025-03-12T12:00:28.20 8.18
2025-03-12T12:00:29.20 8.17
2025-03-12T12:00:30.20 8.19
2025-03-12T12:00:31.20 8.16
2025-03-12T12:00:32.20 8.18
2025-03-12T12:00:33.20 8.17
2025-03-12T12:00:34.20 8.17
2025-03-12T12:00:35.20 8.19
2025-03-12T12:00:36.20 8.16
2025-03-12T12:00:37.20 8.17
2025-03-12T12:00:38.20 8.17
2025-03-12T12:00:39.20 8.16
2025-03-12T12:00:40.20 8.16
2025-03-12T12:00:41.20 8.17
2025-03-12T12:00:42.20 8.19
2025-03-12T12:00:43.20 8.17
2025-03-12T12:00:44.20 8.17
2025-03-12T12:00:45.20 8.16
2025-03-12T12:00:46.20 8.17
2025-03-12T12:00:47.20 8.18
2025-03-12T12:00:48.20 8.19
2025-03-12T12:00:49.20 8.17
2025-03-12T12:00:50.20 8.16
2025-03-12T12:00:51.20 8.18
2025-03-12T12:00:52.20 8.19
2025-03-12T12:00:53.20 8.17
2025-03-12T12:00:54.20 8.18
2025-03-12T12:00:55.20 8.17
2025-03-12T12:00:56.20 8.17
2025-03-12T12:00:57.20 8.18
2025-03-12T12:00:58.20 8.16
2025-03-12T12:00:59.20 8.17
2025-03-12T12:01:00.20 8.17
2025-03-12T12:01:01.20 8.16
2025-03-12T12:01:02.20 8.14
2025-03-12T12:01:03.20 8.16
2025-03-12T12:01:04.20 8.16
2025-03-12T12:01:05.20 8.16
2025-03-12T12:01:06.20 8.14
2025-03-12T12:01:07.20 8.17
2025-03-12T12:01:08.20 8.16
2025-03-12T12:01:09.20 8.16
2025-03-12T12:01:10.20 8.17
2025-03-12T12:01:11.20 8.19
2025-03-12T12:01:12.20 8.17
2025-03-12T12:01:13.20 8.19
2025-03-12T12:01:14.20 8.16
2025-03-12T12:01:15.20 8.16
2025-03-12T12:01:16.20 8.17
2025-03-12T12:01:17.20 8.19
2025-03-12T12:01:18.20 8.18
2025-03-12T12:01:19.20 8.17
2025-03-12T12:01:20.20 8.16
2025-03-12T12:01:21.20 8.17
2025-03-12T12:01:22.20 8.16
2025-03-12T12:01:23.20 8.17
2025-03-12T12:01:24.20 8.17
2025-03-12T12:01:25.20 8.16
2025-03-12T12:01:26.20 8.17
2025-03-12T12:01:27.20 8.16
2025-03-12T12:01:28.20 8.18
2025-03-12T12:01:29.20 8.17
2025-03-12T12:01:30.20 8.17
2025-03-12T12:01:31.20 8.16
2025-03-12T12:01:32.20 8.16
2025-03-12T12:01:33.20 8.16
2025-03-12T12:01:34.20 8.16
2025-03-12T12:01:35.20 8.14
2025-03-12T12:01:36.20 8.17
2025-03-12T12:01:37.20 8.17
2025-03-12T12:01:38.20 8.16
2025-03-12T12:01:39.20 8.15
2025-03-12T12:01:40.20 8.17
2025-03-12T12:01:41.20 8.15
2025-03-12T12:01:42.20 8.16
2025-03-12T12:01:43.20 8.18
2025-03-12T12:01:44.20 8.16
2025-03-12T12:01:45.20 8.17
2025-03-12T12:01:46.20 8.14
2025-03-12T12:01:47.20 8.17
2025-03-12T12:01:48.20 8.17
2025-03-12T12:01:49.20 8.16
2025-03-12T12:01:50.20 8.17
2025-03-12T12:01:51.20 8.17
2025-03-12T12:01:52.20 8.20
2025-03-12T12:01:53.20 8.19
2025-03-12T12:01:54.20 8.17
2025-03-12T12:01:55.20 8.16
2025-03-12T12:01:56.20 8.17
2025-03-12T12:01:57.20 8.18
2025-03-12T12:01:58.20 8.16
2025-03-12T12:01:59.20 8.17
2025-03-12T12:02:00.20 8.16
2025-03-12T12:02:01.20 8.18
2025-03-12T12:02:02.20 8.16
2025-03-12T12:02:03.20 8.17
2025-03-12T12:02:04.20 8.17
2025-03-12T12:02:05.20 8.16
2025-03-12T12:02:06.20 8.17
2025-03-12T12:02:07.20 8.17
2025-03-12T12:02:08.20 8.17
2025-03-12T12:02:09.20 8.18
2025-03-12T12:02:10.20 8.14
2025-03-12T12:02:11.20 8.17
2025-03-12T12:02:12.20 8.18
2025-03-12T12:02:13.20 8.16
2025-03-12T12:02:14.20 8.16
2025-03-12T12:02:15.20 8.17
2025-03-12T12:02:16.20 8.17
2025-03-12T12:02:17.20 8.18
2025-03-12T12:02:18.20 8.16
2025-03-12T12:02:19.20 8.16
2025-03-12T12:02:20.20 8.18
2025-03-12T12:02:21.20 8.17
2025-03-12T12:02:22.20 8.17
2025-03-12T12:02:23.20 8.17
2025-03-12T12:02:24.20 8.17
2025-03-12T12:02:25.20 8.17
2025-03-12T12:02:26.20 8.17
2025-03-12T12:02:27.20 8.18
2025-03-12T12:02:28.20 8.17
2025-03-12T12:02:29.20 8.17
2025-03-12T12:02:30.20 8.18
2025-03-12T12:02:31.20 8.17
2025-03-12T12:02:32.20 8.17
2025-03-12T12:02:33.20 8.18
2025-03-12T12:02:34.20 8.17
2025-03-12T12:02:35.20 8.17
2025-03-12T12:02:36.20 8.16
2025-03-12T12:02:37.20 8.16
2025-03-12T12:02:38.20 8.19
2025-03-12T12:02:39.20 8.16
2025-03-12T12:02:40.21 8.17
2025-03-12T12:02:41.21 8.17
2025-03-12T12:02:42.21 8.17
2025-03-12T12:02:43.21 8.17
2025-03-12T12:02:44.21 8.18
2025-03-12T12:02:45.21 8.16
2025-03-12T12:02:46.21 8.20
2025-03-12T12:02:47.21 8.16
2025-03-12T12:02:48.21 8.16
2025-03-12T12:02:49.21 8.17
2025-03-12T12:02:50.21 8.16
2025-03-12T12:02:51.21 8.16
2025-03-12T12:02:52.21 8.18
2025-03-12T12:02:53.21 8.17
2025-03-12T12:02:54.21 8.17
2025-03-12T12:02:55.21 8.16
2025-03-12T12:02:56.21 8.19
2025-03-12T12:02:57.21 8.17
2025-03-12T12:02:58.21 8.16
2025-03-12T12:02:59.21 8.17
2025-03-12T12:03:00.21 8.17
2025-03-12T12:03:01.21 8.17
2025-03-12T12:03:02.21 8.16
2025-03-12T12:03:03.21 8.17
2025-03-12T12:03:04.21 8.17
2025-03-12T12:03:05.21 8.17
2025-03-12T12:03:06.21 8.18
2025-03-12T12:03:07.21 8.18
2025-03-12T12:03:08.21 8.15
2025-03-12T12:03:09.21 8.17
2025-03-12T12:03:10.21 8.17
2025-03-12T12:03:11.21 8.16
2025-03-12T12:03:12.21 8.16
2025-03-12T12:03:13.21 8.14
2025-03-12T12:03:14.21 8.16
2025-03-12T12:03:15.21 8.14
2025-03-12T12:03:16.21 8.16
2025-03-12T12:03:17.21 8.17
2025-03-12T12:03:18.21 8.17
2025-03-12T12:03:19.21 8.17
2025-03-12T12:03:20.21 8.18
2025-03-12T12:03:21.21 8.17
2025-03-12T12:03:22.21 8.17
2025-03-12T12:03:23.21 8.14
2025-03-12T12:03:24.21 8.16
2025-03-12T12:03:25.21 8.16
2025-03-12T12:03:26.21 8.19
2025-03-12T12:03:27.21 8.17
2025-03-12T12:03:28.21 8.18
2025-03-12T12:03:29.21 8.16
2025-03-12T12:03:30.21 8.14
2025-03-12T12:03:31.21 8.16
2025-03-12T12:03:32.21 8.19
2025-03-12T12:03:33.21 8.16
2025-03-12T12:03:34.21 8.16
2025-03-12T12:03:35.21 8.14
2025-03-12T12:03:36.21 8.17
2025-03-12T12:03:37.21 8.15
2025-03-12T12:03:38.21 8.16
2025-03-12T12:03:39.21 8.17
2025-03-12T12:03:40.21 8.17
2025-03-12T12:03:41.21 8.17
2025-03-12T12:03:42.21 8.16
2025-03-12T12:03:43.21 8.17
2025-03-12T12:03:44.21 8.16
2025-03-12T12:03:45.21 8.17
2025-03-12T12:03:46.21 8.18
2025-03-12T12:03:47.21 8.16
2025-03-12T12:03:48.21 8.18
2025-03-12T12:03:49.21 8.17
2025-03-12T12:03:50.21 8.16
2025-03-12T12:03:51.21 8.16
2025-03-12T12:03:52.21 8.15
2025-03-12T12:03:53.21 8.16
2025-03-12T12:03:54.21 8.16
2025-03-12T12:03:55.21 8.16
2025-03-12T12:03:56.21 8.16
2025-03-12T12:03:57.21 8.17
2025-03-12T12:03:58.21 8.17
2025-03-12T12:03:59.21 8.17
2025-03-12T12:04:00.21 8.14
2025-03-12T12:04:01.21 8.16
2025-03-12T12:04:02.21 8.16
2025-03-12T12:04:03.21 8.18
2025-03-12T12:04:04.21 8.17
2025-03-12T12:04:05.21 8.16
2025-03-12T12:04:06.21 8.17
2025-03-12T12:04:07.21 8.17
2025-03-12T12:04:08.21 8.19
2025-03-12T12:04:09.21 8.19
2025-03-12T12:04:10.21 8.17
2025-03-12T12:04:11.21 8.16
2025-03-12T12:04:12.21 8.16
2025-03-12T12:04:13.21 8.16
2025-03-12T12:04:14.21 8.17
2025-03-12T12:04:15.21 8.18
2025-03-12T12:04:16.21 8.15
2025-03-12T12:04:17.21 8.17
2025-03-12T12:04:18.21 8.19
2025-03-12T12:04:19.21 8.18
2025-03-12T12:04:20.21 8.17
2025-03-12T12:04:21.21 8.18
2025-03-12T12:04:22.21 8.16
2025-03-12T12:04:23.21 8.16
2025-03-12T12:04:24.21 8.17
2025-03-12T12:04:25.21 8.19
2025-03-12T12:04:26.21 8.15
2025-03-12T12:04:27.21 8.17
2025-03-12T12:04:28.21 8.17
2025-03-12T12:04:29.21 8.17
2025-03-12T12:04:30.21 8.16
2025-03-12T12:04:31.21 8.16
2025-03-12T12:04:32.21 8.16
2025-03-12T12:04:33.21 8.18
2025-03-12T12:04:34.21 8.17
2025-03-12T12:04:35.21 8.17
2025-03-12T12:04:36.21 8.16
2025-03-12T12:04:37.21 8.18
2025-03-12T12:04:38.21 8.18
2025-03-12T12:04:39.21 8.19
2025-03-12T12:04:40.21 8.17
2025-03-12T12:04:41.21 8.16
2025-03-12T12:04:42.21 8.15
2025-03-12T12:04:43.21 8.15
2025-03-12T12:04:44.21 8.17
2025-03-12T12:04:45.21 8.17
2025-03-12T12:04:46.21 8.17
2025-03-12T12:04:47.21 8.16
2025-03-12T12:04:48.21 8.17
2025-03-12T12:04:49.21 8.17
2025-03-12T12:04:50.21 8.16
2025-03-12T12:04:51.21 8.17
2025-03-12T12:04:52.21 8.16
2025-03-12T12:04:53.21 8.15
2025-03-12T12:04:54.21 8.18
2025-03-12T12:04:55.21 8.17
2025-03-12T12:04:56.21 8.15
2025-03-12T12:04:57.21 8.19
2025-03-12T12:04:58.21 8.17
2025-03-12T12:04:59.21 8.17
2025-03-12T12:05:00.21 8.17
2025-03-12T12:05:01.21 8.17
2025-03-12T12:05:02.21 8.17
2025-03-12T12:05:03.21 8.15
2025-03-12T12:05:04.21 8.17
2025-03-12T12:05:05.21 8.15
2025-03-12T12:05:06.21 8.18
2025-03-12T12:05:07.21 8.17
2025-03-12T12:05:08.21 8.17
2025-03-12T12:05:09.21 8.17
2025-03-12T12:05:10.21 8.17
2025-03-12T12:05:11.21 8.17
2025-03-12T12:05:12.21 8.17
2025-03-12T12:05:13.21 8.16
2025-03-12T12:05:14.21 8.17
2025-03-12T12:05:15.21 8.17
2025-03-12T12:05:16.21 8.17
2025-03-12T12:05:17.21 8.19
2025-03-12T12:05:18.21 8.16
2025-03-12T12:05:19.21 8.17
2025-03-12T12:05:20.21 8.17
2025-03-12T12:05:21.21 8.17
2025-03-12T12:05:22.21 8.17
2025-03-12T12:05:23.21 8.17
2025-03-12T12:05:24.21 8.16
2025-03-12T12:05:25.21 8.17
2025-03-12T12:05:26.21 8.17
2025-03-12T12:05:27.21 8.17
2025-03-12T12:05:28.21 8.16
2025-03-12T12:05:29.21 8.17
2025-03-12T12:05:30.21 8.18
2025-03-12T12:05:31.21 8.18
2025-03-12T12:05:32.21 8.16
2025-03-12T12:05:33.21 8.19
2025-03-12T12:05:34.21 8.18
2025-03-12T12:05:35.21 8.16
2025-03-12T12:05:36.21 8.18
2025-03-12T12:05:37.21 8.18
2025-03-12T12:05:38.21 8.17
2025-03-12T12:05:39.21 8.17
2025-03-12T12:05:40.21 8.17
2025-03-12T12:05:41.21 8.17
2025-03-12T12:05:42.21 8.16
2025-03-12T12:05:43.21 8.17
2025-03-12T12:05:44.21 8.17
2025-03-12T12:05:45.21 8.17
2025-03-12T12:05:46.21 8.17
2025-03-12T12:05:47.21 8.16
2025-03-12T12:05:48.21 8.17
2025-03-12T12:05:49.21 8.17
2025-03-12T12:05:50.21 8.15
2025-03-12T12:05:51.21 8.17
2025-03-12T12:05:52.21 8.19
2025-03-12T12:05:53.21 8.16
2025-03-12T12:05:54.21 8.17
2025-03-12T12:05:55.21 8.17
2025-03-12T12:05:56.21 8.18
2025-03-12T12:05:57.21 8.17
2025-03-12T12:05:58.21 8.17
2025-03-12T12:05:59.21 8.16
2025-03-12T12:06:00.21 8.17
2025-03-12T12:06:01.21 8.15
2025-03-12T12:06:02.21 8.19
2025-03-12T12:06:03.21 8.17
2025-03-12T12:06:04.21 8.17
2025-03-12T12:06:05.21 8.17
2025-03-12T12:06:06.21 8.17
2025-03-12T12:06:07.21 8.16
2025-03-12T12:06:08.21 8.16
2025-03-12T12:06:09.21 8.17
2025-03-12T12:06:10.21 8.16
2025-03-12T12:06:11.21 8.17
2025-03-12T12:06:12.21 8.17
2025-03-12T12:06:13.21 8.16
2025-03-12T12:06:14.21 8.18
2025-03-12T12:06:15.21 8.17
2025-03-12T12:06:16.21 8.17
2025-03-12T12:06:17.21 8.18
2025-03-12T12:06:18.21 8.17
2025-03-12T12:06:19.21 8.17
2025-03-12T12:06:20.21 8.17
2025-03-12T12:06:21.21 8.16
2025-03-12T12:06:22.21 8.17
2025-03-12T12:06:23.21 8.16
2025-03-12T12:06:24.21 8.17
2025-03-12T12:06:25.21 8.16
2025-03-12T12:06:26.21 8.17
2025-03-12T12:06:27.21 8.16
2025-03-12T12:06:28.21 8.16
2025-03-12T12:06:29.21 8.17
2025-03-12T12:06:30.21 8.17
2025-03-12T12:06:31.21 8.17
2025-03-12T12:06:32.21 8.18
2025-03-12T12:06:33.21 8.20
2025-03-12T12:06:34.21 8.17
2025-03-12T12:06:35.21 8.17
2025-03-12T12:06:36.21 8.14
2025-03-12T12:06:37.21 8.17
2025-03-12T12:06:38.21 8.17
2025-03-12T12:06:39.21 8.16
2025-03-12T12:06:40.21 8.19
2025-03-12T12:06:41.21 8.19
2025-03-12T12:06:42.21 8.17
2025-03-12T12:06:43.21 8.18
2025-03-12T12:06:44.21 8.17
2025-03-12T12:06:45.21 8.17
2025-03-12T12:06:46.21 8.16
2025-03-12T12:06:47.21 8.19
2025-03-12T12:06:48.21 8.19
2025-03-12T12:06:49.21 8.17
2025-03-12T12:06:50.21 8.17
2025-03-12T12:06:51.21 8.17
2025-03-12T12:06:52.21 8.17
2025-03-12T12:06:53.21 8.18
2025-03-12T12:06:54.21 8.16
2025-03-12T12:06:55.21 8.17
2025-03-12T12:06:56.22 8.17
2025-03-12T12:06:57.20 8.17
2025-03-12T12:06:58.20 8.16
2025-03-12T12:06:59.20 8.16
2025-03-12T12:07:00.20 8.17
2025-03-12T12:07:01.20 8.17
2025-03-12T12:07:02.20 8.17
2025-03-12T12:07:03.20 8.16
2025-03-12T12:07:04.20 8.17
2025-03-12T12:07:05.20 8.17
2025-03-12T12:07:06.20 8.19
2025-03-12T12:07:07.20 8.18
2025-03-12T12:07:08.20 8.17
2025-03-12T12:07:09.20 8.18
2025-03-12T12:07:10.20 8.19
2025-03-12T12:07:11.20 8.16
2025-03-12T12:07:12.20 8.18
2025-03-12T12:07:13.20 8.19
2025-03-12T12:07:14.20 8.19
2025-03-12T12:07:15.20 8.18
2025-03-12T12:07:16.20 8.18
2025-03-12T12:07:17.20 8.16
2025-03-12T12:07:18.20 8.17
2025-03-12T12:07:19.20 8.19
2025-03-12T12:07:20.20 8.17
2025-03-12T12:07:21.20 8.17
2025-03-12T12:07:22.20 8.16
2025-03-12T12:07:23.20 8.16
2025-03-12T12:07:24.20 8.17
2025-03-12T12:07:25.20 8.16
2025-03-12T12:07:26.20 8.16
2025-03-12T12:07:27.20 8.17
2025-03-12T12:07:28.20 8.16
2025-03-12T12:07:29.20 8.14
2025-03-12T12:07:30.20 8.16
2025-03-12T12:07:31.20 8.16
2025-03-12T12:07:32.20 8.16
2025-03-12T12:07:33.20 8.16
2025-03-12T12:07:34.20 8.18
2025-03-12T12:07:35.20 8.18
2025-03-12T12:07:36.20 8.18
2025-03-12T12:07:37.20 8.17
2025-03-12T12:07:38.20 8.19
2025-03-12T12:07:39.20 8.17
2025-03-12T12:07:40.20 8.15
2025-03-12T12:07:41.20 8.14
2025-03-12T12:07:42.20 8.17
2025-03-12T12:07:43.20 8.15
2025-03-12T12:07:44.20 8.16
2025-03-12T12:07:45.20 8.14
2025-03-12T12:07:46.20 8.17
2025-03-12T12:07:47.20 8.15
2025-03-12T12:07:48.20 8.17
2025-03-12T12:07:49.20 8.17
2025-03-12T12:07:50.20 8.18
2025-03-12T12:07:51.20 8.17
2025-03-12T12:07:52.20 8.17
2025-03-12T12:07:53.20 8.17
2025-03-12T12:07:54.20 8.17
2025-03-12T12:07:55.20 8.17
2025-03-12T12:07:56.20 8.18
2025-03-12T12:07:57.20 8.17
2025-03-12T12:07:58.20 8.18
2025-03-12T12:07:59.21 8.18
2025-03-12T12:08:00.21 8.18
2025-03-12T12:08:01.21 8.17
2025-03-12T12:08:02.21 8.19
2025-03-12T12:08:03.21 8.19
2025-03-12T12:08:04.21 8.16
2025-03-12T12:08:05.21 8.17
2025-03-12T12:08:06.21 8.17
2025-03-12T12:08:07.21 8.17
2025-03-12T12:08:08.21 8.16
2025-03-12T12:08:09.21 8.17
2025-03-12T12:08:10.21 8.16
2025-03-12T12:08:11.21 8.17
2025-03-12T12:08:12.21 8.16
2025-03-12T12:08:13.21 8.16
2025-03-12T12:08:14.21 8.16
2025-03-12T12:08:15.21 8.16
2025-03-12T12:08:16.21 8.16
2025-03-12T12:08:17.21 8.17
2025-03-12T12:08:18.21 8.16
2025-03-12T12:08:19.21 8.18
2025-03-12T12:08:20.21 8.16
2025-03-12T12:08:21.21 8.17
2025-03-12T12:08:22.21 8.19
2025-03-12T12:08:23.21 8.17
2025-03-12T12:08:24.21 8.17
2025-03-12T12:08:25.21 8.16
2025-03-12T12:08:26.21 8.17
2025-03-12T12:08:27.21 8.17
2025-03-12T12:08:28.21 8.19
2025-03-12T12:08:29.21 8.17
2025-03-12T12:08:30.21 8.17
2025-03-12T12:08:31.21 8.17
2025-03-12T12:08:32.21 8.16
2025-03-12T12:08:33.21 8.17
2025-03-12T12:08:34.21 8.15
2025-03-12T12:08:35.21 8.17
2025-03-12T12:08:36.21 8.17
2025-03-12T12:08:37.21 8.16
2025-03-12T12:08:38.21 8.17
2025-03-12T12:08:39.21 8.17
2025-03-12T12:08:40.21 8.16
2025-03-12T12:08:41.21 8.17
2025-03-12T12:08:42.21 8.16
2025-03-12T12:08:43.21 8.18
2025-03-12T12:08:44.21 8.18
2025-03-12T12:08:45.21 8.17
2025-03-12T12:08:46.21 8.21
2025-03-12T12:08:47.21 8.17
2025-03-12T12:08:48.21 8.18
2025-03-12T12:08:49.21 8.15
2025-03-12T12:08:50.21 8.19
2025-03-12T12:08:51.21 8.17
2025-03-12T12:08:52.21 8.16
2025-03-12T12:08:53.21 8.19
2025-03-12T12:08:54.21 8.17
2025-03-12T12:08:55.21 8.17
2025-03-12T12:08:56.21 8.16
2025-03-12T12:08:57.21 8.17
2025-03-12T12:08:58.21 8.16
2025-03-12T12:08:59.21 8.16
2025-03-12T12:09:00.21 8.15
2025-03-12T12:09:01.21 8.16
2025-03-12T12:09:02.21 8.17
2025-03-12T12:09:03.21 8.19
2025-03-12T12:09:04.21 8.17
2025-03-12T12:09:05.21 8.17
2025-03-12T12:09:06.21 8.18
2025-03-12T12:09:07.21 8.17
2025-03-12T12:09:08.21 8.17
2025-03-12T12:09:09.21 8.16
2025-03-12T12:09:10.21 8.17
2025-03-12T12:09:11.21 8.17
2025-03-12T12:09:12.21 8.17
2025-03-12T12:09:13.21 8.16
2025-03-12T12:09:14.21 8.19
2025-03-12T12:09:15.21 8.17
2025-03-12T12:09:16.21 8.16
2025-03-12T12:09:17.21 8.16
2025-03-12T12:09:18.21 8.17
2025-03-12T12:09:19.21 8.16
2025-03-12T12:09:20.21 8.17
2025-03-12T12:09:21.21 8.17
2025-03-12T12:09:22.21 8.18
2025-03-12T12:09:23.21 8.17
2025-03-12T12:09:24.21 8.18
2025-03-12T12:09:25.21 8.16
2025-03-12T12:09:26.21 8.16
2025-03-12T12:09:27.21 8.19
2025-03-12T12:09:28.21 8.17
2025-03-12T12:09:29.21 8.16
2025-03-12T12:09:30.21 8.18
2025-03-12T12:09:31.21 8.17
2025-03-12T12:09:32.21 8.19
2025-03-12T12:09:33.21 8.16
2025-03-12T12:09:34.21 8.16
2025-03-12T12:09:35.21 8.18
2025-03-12T12:09:36.21 8.17
2025-03-12T12:09:37.21 8.19
2025-03-12T12:09:38.21 8.15
2025-03-12T12:09:39.21 8.16
2025-03-12T12:09:40.21 8.16
2025-03-12T12:09:41.21 8.17
2025-03-12T12:09:42.21 8.19
2025-03-12T12:09:43.21 8.17
2025-03-12T12:09:44.21 8.17
2025-03-12T12:09:45.21 8.19
2025-03-12T12:09:46.21 8.17
2025-03-12T12:09:47.21 8.17
2025-03-12T12:09:48.21 8.17
2025-03-12T12:09:49.21 8.16
2025-03-12T12:09:50.21 8.16
2025-03-12T12:09:51.21 8.17
2025-03-12T12:09:52.21 8.17
2025-03-12T12:09:53.21 8.16
2025-03-12T12:09:54.21 8.16
2025-03-12T12:09:55.21 8.17
2025-03-12T12:09:56.21 8.16
2025-03-12T12:09:57.21 8.16
2025-03-12T12:09:58.21 8.18
2025-03-12T12:09:59.21 8.17
2025-03-12T12:10:00.21 8.16
2025-03-12T12:10:01.21 8.19
2025-03-12T12:10:02.21 8.16
2025-03-12T12:10:03.21 8.19
2025-03-12T12:10:04.21 8.16
2025-03-12T12:10:05.21 8.17
2025-03-12T12:10:06.21 8.16
2025-03-12T12:10:07.21 8.17
2025-03-12T12:10:08.21 8.17
2025-03-12T12:10:09.21 8.15
2025-03-12T12:10:10.21 8.16
2025-03-12T12:10:11.21 8.17
2025-03-12T12:10:12.21 8.17
2025-03-12T12:10:13.21 8.17
2025-03-12T12:10:14.21 8.16
2025-03-12T12:10:15.21 8.16
2025-03-12T12:10:16.21 8.17
2025-03-12T12:10:17.21 8.17
2025-03-12T12:10:18.21 8.16
2025-03-12T12:10:19.21 8.17
2025-03-12T12:10:20.21 8.16
2025-03-12T12:10:21.21 8.17
2025-03-12T12:10:22.21 8.16
2025-03-12T12:10:23.21 8.19
2025-03-12T12:10:24.21 8.16
2025-03-12T12:10:25.21 8.17
2025-03-12T12:10:26.21 8.14
2025-03-12T12:10:27.21 8.17
2025-03-12T12:10:28.21 8.16
2025-03-12T12:10:29.21 8.17
2025-03-12T12:10:30.21 8.18
2025-03-12T12:10:31.21 8.17
2025-03-12T12:10:32.21 8.16
2025-03-12T12:10:33.21 8.16
2025-03-12T12:10:34.21 8.17
2025-03-12T12:10:35.21 8.16
2025-03-12T12:10:36.21 8.17
2025-03-12T12:10:37.21 8.16
2025-03-12T12:10:38.21 8.16
2025-03-12T12:10:39.21 8.16
2025-03-12T12:10:40.21 8.16
2025-03-12T12:10:41.21 8.17
2025-03-12T12:10:42.21 8.16
2025-03-12T12:10:43.21 8.18
2025-03-12T12:10:44.21 8.17
2025-03-12T12:10:45.21 8.15
2025-03-12T12:10:46.21 8.16
2025-03-12T12:10:47.21 8.17
2025-03-12T12:10:48.22 8.16
2025-03-12T12:10:49.20 8.15
2025-03-12T12:10:50.20 8.16
2025-03-12T12:10:51.20 8.18
2025-03-12T12:10:52.20 8.16
2025-03-12T12:10:53.20 8.17
2025-03-12T12:10:54.20 8.17
2025-03-12T12:10:55.20 8.16
2025-03-12T12:10:56.20 8.16
2025-03-12T12:10:57.20 8.18
2025-03-12T12:10:58.20 8.17
2025-03-12T12:10:59.20 8.17
2025-03-12T12:11:00.20 8.16
2025-03-12T12:11:01.20 8.17
2025-03-12T12:11:02.20 8.16
2025-03-12T12:11:03.20 8.16
2025-03-12T12:11:04.20 8.14
2025-03-12T12:11:05.20 8.15
2025-03-12T12:11:06.20 8.16
2025-03-12T12:11:07.20 8.16
2025-03-12T12:11:08.20 8.19
2025-03-12T12:11:09.20 8.17
2025-03-12T12:11:10.20 8.19
2025-03-12T12:11:11.20 8.16
2025-03-12T12:11:12.20 8.17
2025-03-12T12:11:13.20 8.17
2025-03-12T12:11:14.20 8.16
2025-03-12T12:11:15.20 8.16
2025-03-12T12:11:16.20 8.14
2025-03-12T12:11:17.20 8.16
2025-03-12T12:11:18.20 8.19
2025-03-12T12:11:19.20 8.17
2025-03-12T12:11:20.20 8.15
2025-03-12T12:11:21.20 8.16
2025-03-12T12:11:22.20 8.15
2025-03-12T12:11:23.20 8.16
2025-03-12T12:11:24.20 8.17
2025-03-12T12:11:25.20 8.17
2025-03-12T12:11:26.20 8.16
2025-03-12T12:11:27.20 8.15
2025-03-12T12:11:28.20 8.16
2025-03-12T12:11:29.20 8.16
2025-03-12T12:11:30.20 8.17
2025-03-12T12:11:31.20 8.16
2025-03-12T12:11:32.20 8.15
2025-03-12T12:11:33.20 8.16
2025-03-12T12:11:34.20 8.18
2025-03-12T12:11:35.20 8.16
2025-03-12T12:11:36.20 8.17
2025-03-12T12:11:37.20 8.17
2025-03-12T12:11:38.20 8.17
2025-03-12T12:11:39.20 8.17
2025-03-12T12:11:40.20 8.17
2025-03-12T12:11:41.20 8.16
2025-03-12T12:11:42.20 8.16
2025-03-12T12:11:43.20 8.16
2025-03-12T12:11:44.20 8.17
2025-03-12T12:11:45.20 8.18
2025-03-12T12:11:46.20 8.16
2025-03-12T12:11:47.20 8.17
2025-03-12T12:11:48.20 8.17
2025-03-12T12:11:49.20 8.16
2025-03-12T12:11:50.20 8.20
2025-03-12T12:11:51.20 8.17
2025-03-12T12:11:52.20 8.18
2025-03-12T12:11:53.20 8.19
2025-03-12T12:11:54.20 8.16
2025-03-12T12:11:55.20 8.16
2025-03-12T12:11:56.20 8.16
2025-03-12T12:11:57.20 8.17
2025-03-12T12:11:58.20 8.17
2025-03-12T12:11:59.20 8.19
2025-03-12T12:12:00.20 8.16
2025-03-12T12:12:01.20 8.17
2025-03-12T12:12:02.20 8.19
2025-03-12T12:12:03.20 8.16
2025-03-12T12:12:04.20 8.16
2025-03-12T12:12:05.20 8.17
2025-03-12T12:12:06.20 8.18
2025-03-12T12:12:07.20 8.17
2025-03-12T12:12:08.20 8.16
2025-03-12T12:12:09.20 8.16
2025-03-12T12:12:10.20 8.17
2025-03-12T12:12:11.20 8.16
2025-03-12T12:12:12.20 8.16
2025-03-12T12:12:13.20 8.17
2025-03-12T12:12:14.20 8.16
2025-03-12T12:12:15.20 8.18
2025-03-12T12:12:16.20 8.16
2025-03-12T12:12:17.20 8.17
2025-03-12T12:12:18.20 8.19
2025-03-12T12:12:19.20 8.16
2025-03-12T12:12:20.20 8.15
2025-03-12T12:12:21.20 8.16
2025-03-12T12:12:22.20 8.16
2025-03-12T12:12:23.20 8.16
2025-03-12T12:12:24.20 8.17
2025-03-12T12:12:25.20 8.17
2025-03-12T12:12:26.20 8.16
2025-03-12T12:12:27.20 8.16
2025-03-12T12:12:28.20 8.14
2025-03-12T12:12:29.20 8.17
2025-03-12T12:12:30.20 8.15
2025-03-12T12:12:31.20 8.17
2025-03-12T12:12:32.20 8.17
2025-03-12T12:12:33.20 8.15
2025-03-12T12:12:34.20 8.17
2025-03-12T12:12:35.20 8.19
2025-03-12T12:12:36.20 8.17
2025-03-12T12:12:37.20 8.16
2025-03-12T12:12:38.20 8.16
2025-03-12T12:12:39.20 8.17
2025-03-12T12:12:40.20 8.17
2025-03-12T12:12:41.20 8.17
2025-03-12T12:12:42.20 8.19
2025-03-12T12:12:43.20 8.17
2025-03-12T12:12:44.20 8.17
2025-03-12T12:12:45.20 8.16
2025-03-12T12:12:46.20 8.18
2025-03-12T12:12:47.20 8.17
2025-03-12T12:12:48.20 8.15
2025-03-12T12:12:49.20 8.19
2025-03-12T12:12:50.20 8.19
2025-03-12T12:12:51.20 8.18
2025-03-12T12:12:52.20 8.18
2025-03-12T12:12:53.20 8.18
2025-03-12T12:12:54.20 8.17
2025-03-12T12:12:55.20 8.19
2025-03-12T12:12:56.20 8.19
2025-03-12T12:12:57.20 8.15
2025-03-12T12:12:58.20 8.18
2025-03-12T12:12:59.20 8.16
2025-03-12T12:13:00.20 8.16
2025-03-12T12:13:01.20 8.18
2025-03-12T12:13:02.20 8.19
2025-03-12T12:13:03.20 8.17
2025-03-12T12:13:04.20 8.14
2025-03-12T12:13:05.20 8.18
2025-03-12T12:13:06.20 8.18
2025-03-12T12:13:07.20 8.17
2025-03-12T12:13:08.20 8.17
2025-03-12T12:13:09.20 8.18
2025-03-12T12:13:10.21 8.17
2025-03-12T12:13:11.20 8.17
2025-03-12T12:13:12.20 8.17
2025-03-12T12:13:13.20 8.17
2025-03-12T12:13:14.20 8.17
2025-03-12T12:13:15.20 8.17
2025-03-12T12:13:16.20 8.18
2025-03-12T12:13:17.21 8.17
2025-03-12T12:13:18.21 8.16
2025-03-12T12:13:19.21 8.17
2025-03-12T12:13:20.21 8.16
2025-03-12T12:13:21.21 8.16
2025-03-12T12:13:22.21 8.16
2025-03-12T12:13:23.21 8.17
2025-03-12T12:13:24.21 8.17
2025-03-12T12:13:25.21 8.18
2025-03-12T12:13:26.21 8.16
2025-03-12T12:13:27.21 8.19
2025-03-12T12:13:28.21 8.16
2025-03-12T12:13:29.21 8.17
2025-03-12T12:13:30.21 8.17
2025-03-12T12:13:31.21 8.18
2025-03-12T12:13:32.21 8.17
2025-03-12T12:13:33.21 8.19
2025-03-12T12:13:34.21 8.20
2025-03-12T12:13:35.21 8.19
2025-03-12T12:13:36.21 8.17
2025-03-12T12:13:37.21 8.16
2025-03-12T12:13:38.21 8.16
2025-03-12T12:13:39.21 8.16
2025-03-12T12:13:40.21 8.15
2025-03-12T12:13:41.21 8.17
2025-03-12T12:13:42.21 8.18
2025-03-12T12:13:43.21 8.15
2025-03-12T12:13:44.21 8.15
2025-03-12T12:13:45.21 8.17
2025-03-12T12:13:46.21 8.17
2025-03-12T12:13:47.21 8.15
2025-03-12T12:13:48.21 8.16
2025-03-12T12:13:49.21 8.16
2025-03-12T12:13:50.21 8.18
2025-03-12T12:13:51.21 8.19
2025-03-12T12:13:52.21 8.15
2025-03-12T12:13:53.21 8.16
2025-03-12T12:13:54.21 8.17
2025-03-12T12:13:55.21 8.16
2025-03-12T12:13:56.21 8.17
2025-03-12T12:13:57.21 8.17
2025-03-12T12:13:58.21 8.18
2025-03-12T12:13:59.21 8.17
2025-03-12T12:14:00.21 8.17
2025-03-12T12:14:01.21 8.16
2025-03-12T12:14:02.21 8.17
2025-03-12T12:14:03.21 8.16
2025-03-12T12:14:04.21 8.16
2025-03-12T12:14:05.21 8.15
2025-03-12T12:14:06.21 8.16
2025-03-12T12:14:07.21 8.14
2025-03-12T12:14:08.21 8.17
2025-03-12T12:14:09.21 8.16
2025-03-12T12:14:10.21 8.17
2025-03-12T12:14:11.21 8.17
2025-03-12T12:14:12.21 8.16
2025-03-12T12:14:13.21 8.16
2025-03-12T12:14:14.21 8.17
2025-03-12T12:14:15.21 8.16
2025-03-12T12:14:16.21 8.16
2025-03-12T12:14:17.21 8.17
2025-03-12T12:14:18.21 8.16
2025-03-12T12:14:19.21 8.14
2025-03-12T12:14:20.21 8.17
2025-03-12T12:14:21.21 8.16
2025-03-12T12:14:22.21 8.18
2025-03-12T12:14:23.21 8.18
2025-03-12T12:14:24.21 8.18
2025-03-12T12:14:25.21 8.17
2025-03-12T12:14:26.21 8.17
2025-03-12T12:14:27.21 8.16
2025-03-12T12:14:28.21 8.18
2025-03-12T12:14:29.21 8.15
2025-03-12T12:14:30.21 8.17
2025-03-12T12:14:31.21 8.17
2025-03-12T12:14:32.21 8.17
2025-03-12T12:14:33.21 8.19
2025-03-12T12:14:34.21 8.19
2025-03-12T12:14:35.21 8.16
2025-03-12T12:14:36.21 8.16
2025-03-12T12:14:37.21 8.18
2025-03-12T12:14:38.21 8.16
2025-03-12T12:14:39.21 8.16
2025-03-12T12:14:40.22 8.19
2025-03-12T12:14:41.20 8.18
2025-03-12T12:14:42.20 8.18
2025-03-12T12:14:43.20 8.17
2025-03-12T12:14:44.20 8.16
2025-03-12T12:14:45.20 8.17
2025-03-12T12:14:46.20 8.18
2025-03-12T12:14:47.20 8.18
2025-03-12T12:14:48.20 8.18
2025-03-12T12:14:49.20 8.17
2025-03-12T12:14:50.20 8.16
2025-03-12T12:14:51.20 8.16
2025-03-12T12:14:52.20 8.17
2025-03-12T12:14:53.20 8.16
2025-03-12T12:14:54.20 8.17
2025-03-12T12:14:55.20 8.14
2025-03-12T12:14:56.20 8.18
2025-03-12T12:14:57.20 8.18
2025-03-12T12:14:58.20 8.16
2025-03-12T12:14:59.20 8.16
2025-03-12T12:15:00.20 8.18
2025-03-12T12:15:01.20 8.17
2025-03-12T12:15:02.20 8.17
2025-03-12T12:15:03.20 8.17
2025-03-12T12:15:04.20 8.14
2025-03-12T12:15:05.20 8.15
2025-03-12T12:15:06.20 8.17
2025-03-12T12:15:07.20 8.17
2025-03-12T12:15:08.20 8.14
2025-03-12T12:15:09.20 8.17
2025-03-12T12:15:10.20 8.19
2025-03-12T12:15:11.20 8.16
2025-03-12T12:15:12.20 8.17
2025-03-12T12:15:13.20 8.17
2025-03-12T12:15:14.20 8.17
2025-03-12T12:15:15.20 8.17
2025-03-12T12:15:16.20 8.16
2025-03-12T12:15:17.20 8.16
2025-03-12T12:15:18.20 8.15
2025-03-12T12:15:19.20 8.16
2025-03-12T12:15:20.20 8.17
2025-03-12T12:15:21.20 8.16
2025-03-12T12:15:22.20 8.17
2025-03-12T12:15:23.20 8.16
2025-03-12T12:15:24.20 8.16
2025-03-12T12:15:25.20 8.17
2025-03-12T12:15:26.20 8.16
2025-03-12T12:15:27.20 8.19
2025-03-12T12:15:28.20 8.17
2025-03-12T12:15:29.20 8.17
2025-03-12T12:15:30.20 8.16
2025-03-12T12:15:31.20 8.16
2025-03-12T12:15:32.20 8.18
2025-03-12T12:15:33.20 8.17
2025-03-12T12:15:34.20 8.17
2025-03-12T12:15:35.20 8.16
2025-03-12T12:15:36.20 8.17
2025-03-12T12:15:37.20 8.16
2025-03-12T12:15:38.20 8.16
2025-03-12T12:15:39.20 8.17
2025-03-12T12:15:40.20 8.17
2025-03-12T12:15:41.20 8.16
2025-03-12T12:15:42.20 8.14
2025-03-12T12:15:43.20 8.19
2025-03-12T12:15:44.20 8.17
2025-03-12T12:15:45.20 8.16
2025-03-12T12:15:46.20 8.16
2025-03-12T12:15:47.20 8.17
2025-03-12T12:15:48.20 8.17
2025-03-12T12:15:49.20 8.17
2025-03-12T12:15:50.20 8.17
2025-03-12T12:15:51.20 8.18
2025-03-12T12:15:52.20 8.18
2025-03-12T12:15:53.20 8.16
2025-03-12T12:15:54.20 8.17
2025-03-12T12:15:55.20 8.17
2025-03-12T12:15:56.20 8.16
2025-03-12T12:15:57.20 8.17
2025-03-12T12:15:58.20 8.17
2025-03-12T12:15:59.20 8.17
2025-03-12T12:16:00.20 8.16
2025-03-12T12:16:01.20 8.17
2025-03-12T12:16:02.20 8.18
2025-03-12T12:16:03.20 8.17
2025-03-12T12:16:04.20 8.19
2025-03-12T12:16:05.20 8.17
2025-03-12T12:16:06.20 8.17
2025-03-12T12:16:07.20 8.18
2025-03-12T12:16:08.20 8.16
2025-03-12T12:16:09.20 8.17
2025-03-12T12:16:10.20 8.17
2025-03-12T12:16:11.20 8.16
2025-03-12T12:16:12.20 8.19
2025-03-12T12:16:13.20 8.16
2025-03-12T12:16:14.20 8.17
2025-03-12T12:16:15.20 8.14
2025-03-12T12:16:16.20 8.16
2025-03-12T12:16:17.20 8.17
2025-03-12T12:16:18.20 8.16
2025-03-12T12:16:19.20 8.14
2025-03-12T12:16:20.20 8.16
2025-03-12T12:16:21.20 8.17
2025-03-12T12:16:22.20 8.15
2025-03-12T12:16:23.20 8.16
2025-03-12T12:16:24.20 8.19
2025-03-12T12:16:25.20 8.19
2025-03-12T12:16:26.20 8.16
2025-03-12T12:16:27.20 8.17
2025-03-12T12:16:28.20 8.18
2025-03-12T12:16:29.20 8.19
2025-03-12T12:16:30.20 8.18
2025-03-12T12:16:31.20 8.17
2025-03-12T12:16:32.20 8.17
2025-03-12T12:16:33.20 8.16
2025-03-12T12:16:34.20 8.15
2025-03-12T12:16:35.20 8.15
2025-03-12T12:16:36.20 8.15
2025-03-12T12:16:37.20 8.17
2025-03-12T12:16:38.20 8.17
2025-03-12T12:16:39.20 8.18
2025-03-12T12:16:40.20 8.17
2025-03-12T12:16:41.20 8.17
2025-03-12T12:16:42.20 8.19
2025-03-12T12:16:43.20 8.18
2025-03-12T12:16:44.20 8.16
2025-03-12T12:16:45.20 8.16
2025-03-12T12:16:46.20 8.16
2025-03-12T12:16:47.20 8.17
2025-03-12T12:16:48.20 8.14
2025-03-12T12:16:49.20 8.14
2025-03-12T12:16:50.20 8.17
2025-03-12T12:16:51.20 8.17
2025-03-12T12:16:52.20 8.16
2025-03-12T12:16:53.20 8.16
2025-03-12T12:16:54.20 8.19
2025-03-12T12:16:55.20 8.17
2025-03-12T12:16:56.20 8.16
2025-03-12T12:16:57.20 8.16
2025-03-12T12:16:58.20 8.19
2025-03-12T12:16:59.20 8.16
2025-03-12T12:17:00.20 8.17
2025-03-12T12:17:01.20 8.19
2025-03-12T12:17:02.20 8.17
2025-03-12T12:17:03.20 8.17
2025-03-12T12:17:04.20 8.15
2025-03-12T12:17:05.20 8.18
2025-03-12T12:17:06.20 8.16
2025-03-12T12:17:07.20 8.15
2025-03-12T12:17:08.20 8.17
2025-03-12T12:17:09.20 8.17
2025-03-12T12:17:10.20 8.16
2025-03-12T12:17:11.20 8.20
2025-03-12T12:17:12.20 8.16
2025-03-12T12:17:13.20 8.17
2025-03-12T12:17:14.20 8.16
2025-03-12T12:17:15.20 8.17
2025-03-12T12:17:16.20 8.16
2025-03-12T12:17:17.20 8.16
2025-03-12T12:17:18.20 8.19
2025-03-12T12:17:19.20 8.17
2025-03-12T12:17:20.20 8.17
2025-03-12T12:17:21.20 8.18
2025-03-12T12:17:22.20 8.19
2025-03-12T12:17:23.20 8.15
2025-03-12T12:17:24.20 8.18
2025-03-12T12:17:25.20 8.16
2025-03-12T12:17:26.20 8.18
2025-03-12T12:17:27.20 8.18
2025-03-12T12:17:28.20 8.16
2025-03-12T12:17:29.20 8.18
2025-03-12T12:17:30.20 8.19
2025-03-12T12:17:31.20 8.17
2025-03-12T12:17:32.20 8.17
2025-03-12T12:17:33.20 8.18
2025-03-12T12:17:34.20 8.19
2025-03-12T12:17:35.20 8.20
2025-03-12T12:17:36.20 8.16
2025-03-12T12:17:37.20 8.18
2025-03-12T12:17:38.20 8.17
2025-03-12T12:17:39.20 8.16
2025-03-12T12:17:40.20 8.17
2025-03-12T12:17:41.20 8.16
2025-03-12T12:17:42.20 8.16
2025-03-12T12:17:43.20 8.17
2025-03-12T12:17:44.20 8.17
2025-03-12T12:17:45.20 8.18
2025-03-12T12:17:46.20 8.16
2025-03-12T12:17:47.20 8.19
2025-03-12T12:17:48.20 8.18
2025-03-12T12:17:49.20 8.19
2025-03-12T12:17:50.20 8.17
2025-03-12T12:17:51.20 8.17
2025-03-12T12:17:52.20 8.16
2025-03-12T12:17:53.20 8.16
2025-03-12T12:17:54.20 8.16
2025-03-12T12:17:55.20 8.17
2025-03-12T12:17:56.20 8.18
2025-03-12T12:17:57.20 8.19
2025-03-12T12:17:58.20 8.17
2025-03-12T12:17:59.20 8.17
2025-03-12T12:18:00.20 8.16
2025-03-12T12:18:01.20 8.17
2025-03-12T12:18:02.20 8.16
2025-03-12T12:18:03.20 8.19
2025-03-12T12:18:04.20 8.19
2025-03-12T12:18:05.20 8.18
2025-03-12T12:18:06.20 8.17
2025-03-12T12:18:07.20 8.17
2025-03-12T12:18:08.20 8.16
2025-03-12T12:18:09.20 8.18
2025-03-12T12:18:10.20 8.19
2025-03-12T12:18:11.20 8.17
2025-03-12T12:18:12.20 8.16
2025-03-12T12:18:13.20 8.16
2025-03-12T12:18:14.20 8.20
2025-03-12T12:18:15.20 8.17
2025-03-12T12:18:16.20 8.17
2025-03-12T12:18:17.20 8.18
2025-03-12T12:18:18.20 8.16
2025-03-12T12:18:19.20 8.18
2025-03-12T12:18:20.20 8.19
2025-03-12T12:18:21.20 8.16
2025-03-12T12:18:22.20 8.16
2025-03-12T12:18:23.20 8.16
2025-03-12T12:18:24.20 8.16
2025-03-12T12:18:25.20 8.17
2025-03-12T12:18:26.20 8.18
2025-03-12T12:18:27.20 8.18
2025-03-12T12:18:28.20 8.14
2025-03-12T12:18:29.20 8.17
2025-03-12T12:18:30.20 8.15
2025-03-12T12:18:31.20 8.16
2025-03-12T12:18:32.23 8.17
2025-03-12T12:18:33.19 8.16
2025-03-12T12:18:34.19 8.18
2025-03-12T12:18:35.20 8.17
2025-03-12T12:18:36.20 8.19
2025-03-12T12:18:37.20 8.17
2025-03-12T12:18:38.20 8.17
2025-03-12T12:18:39.20 8.17
2025-03-12T12:18:40.20 8.18
2025-03-12T12:18:41.20 8.17
2025-03-12T12:18:42.20 8.19
2025-03-12T12:18:43.20 8.16
2025-03-12T12:18:44.20 8.15
2025-03-12T12:18:45.20 8.17
2025-03-12T12:18:46.20 8.17
2025-03-12T12:18:47.20 8.17
2025-03-12T12:18:48.20 8.16
2025-03-12T12:18:49.20 8.14
2025-03-12T12:18:50.20 8.16
2025-03-12T12:18:51.20 8.19
2025-03-12T12:18:52.20 8.18
2025-03-12T12:18:53.20 8.16
2025-03-12T12:18:54.20 8.17
2025-03-12T12:18:55.20 8.18
2025-03-12T12:18:56.20 8.18
2025-03-12T12:18:57.20 8.18
2025-03-12T12:18:58.20 8.17
2025-03-12T12:18:59.20 8.17
2025-03-12T12:19:00.20 8.18
2025-03-12T12:19:01.20 8.18
2025-03-12T12:19:02.20 8.17
2025-03-12T12:19:03.20 8.19
2025-03-12T12:19:04.20 8.21
2025-03-12T12:19:05.20 8.19
2025-03-12T12:19:06.20 8.17
2025-03-12T12:19:07.20 8.17
2025-03-12T12:19:08.20 8.16
2025-03-12T12:19:09.20 8.16
2025-03-12T12:19:10.20 8.17
2025-03-12T12:19:11.20 8.18
2025-03-12T12:19:12.20 8.14
2025-03-12T12:19:13.20 8.14
2025-03-12T12:19:14.20 8.15
2025-03-12T12:19:15.20 8.18
2025-03-12T12:19:16.20 8.16
2025-03-12T12:19:17.20 8.16
2025-03-12T12:19:18.20 8.17
2025-03-12T12:19:19.20 8.19
2025-03-12T12:19:20.20 8.17
2025-03-12T12:19:21.20 8.17
2025-03-12T12:19:22.20 8.19
2025-03-12T12:19:23.20 8.18
2025-03-12T12:19:24.20 8.18
2025-03-12T12:19:25.20 8.18
2025-03-12T12:19:26.20 8.17
2025-03-12T12:19:27.20 8.16
2025-03-12T12:19:28.20 8.17
2025-03-12T12:19:29.20 8.17
2025-03-12T12:19:30.20 8.17
2025-03-12T12:19:31.20 8.19
2025-03-12T12:19:32.20 8.17
2025-03-12T12:19:33.20 8.17
2025-03-12T12:19:34.20 8.17
2025-03-12T12:19:35.20 8.17
2025-03-12T12:19:36.20 8.17
2025-03-12T12:19:37.20 8.17
2025-03-12T12:19:38.20 8.18
2025-03-12T12:19:39.20 8.17
2025-03-12T12:19:40.20 8.16
2025-03-12T12:19:41.20 8.17
2025-03-12T12:19:42.20 8.19
2025-03-12T12:19:43.20 8.16
2025-03-12T12:19:44.20 8.18
2025-03-12T12:19:45.20 8.16
2025-03-12T12:19:46.20 8.19
2025-03-12T12:19:47.20 8.17
2025-03-12T12:19:48.20 8.16
2025-03-12T12:19:49.20 8.16
2025-03-12T12:19:50.20 8.18
2025-03-12T12:19:51.20 8.17
2025-03-12T12:19:52.20 8.14
2025-03-12T12:19:53.20 8.14
2025-03-12T12:19:54.20 8.17
2025-03-12T12:19:55.20 8.17
2025-03-12T12:19:56.20 8.14
2025-03-12T12:19:57.20 8.20
2025-03-12T12:19:58.20 8.19
2025-03-12T12:19:59.20 8.14
2025-03-12T12:20:00.20 8.17
2025-03-12T12:20:01.20 8.18
2025-03-12T12:20:02.20 8.17
2025-03-12T12:20:03.20 8.17
2025-03-12T12:20:04.20 8.17
2025-03-12T12:20:05.20 8.14
2025-03-12T12:20:06.20 8.16
2025-03-12T12:20:07.20 8.20
2025-03-12T12:20:08.20 8.17
2025-03-12T12:20:09.20 8.18
2025-03-12T12:20:10.20 8.16
2025-03-12T12:20:11.20 8.17
2025-03-12T12:20:12.20 8.17
2025-03-12T12:20:13.20 8.16
2025-03-12T12:20:14.20 8.16
2025-03-12T12:20:15.20 8.16
2025-03-12T12:20:16.20 8.18
2025-03-12T12:20:17.20 8.16
2025-03-12T12:20:18.20 8.18
2025-03-12T12:20:19.20 8.16
2025-03-12T12:20:20.20 8.15
2025-03-12T12:20:21.20 8.17
2025-03-12T12:20:22.20 8.17
2025-03-12T12:20:23.20 8.17
2025-03-12T12:20:24.20 8.16
2025-03-12T12:20:25.20 8.16
2025-03-12T12:20:26.20 8.16
2025-03-12T12:20:27.20 8.17
2025-03-12T12:20:28.20 8.17
2025-03-12T12:20:29.20 8.17
2025-03-12T12:20:30.20 8.17
2025-03-12T12:20:31.20 8.19
2025-03-12T12:20:32.20 8.17
2025-03-12T12:20:33.20 8.17
2025-03-12T12:20:34.20 8.18
2025-03-12T12:20:35.20 8.19
2025-03-12T12:20:36.20 8.16
2025-03-12T12:20:37.20 8.18
2025-03-12T12:20:38.20 8.17
2025-03-12T12:20:39.20 8.19
2025-03-12T12:20:40.20 8.18
2025-03-12T12:20:41.20 8.16
2025-03-12T12:20:42.20 8.18
2025-03-12T12:20:43.20 8.16
2025-03-12T12:20:44.20 8.16
2025-03-12T12:20:45.20 8.16
2025-03-12T12:20:46.20 8.16
2025-03-12T12:20:47.20 8.18
2025-03-12T12:20:48.20 8.16
2025-03-12T12:20:49.20 8.16
2025-03-12T12:20:50.20 8.16
2025-03-12T12:20:51.20 8.17
2025-03-12T12:20:52.20 8.17
2025-03-12T12:20:53.20 8.16
2025-03-12T12:20:54.20 8.18
2025-03-12T12:20:55.20 8.17
2025-03-12T12:20:56.20 8.16
2025-03-12T12:20:57.20 8.15
2025-03-12T12:20:58.20 8.19
2025-03-12T12:20:59.20 8.17
2025-03-12T12:21:00.20 8.17
2025-03-12T12:21:01.20 8.19
2025-03-12T12:21:02.20 8.17
2025-03-12T12:21:03.20 8.16
2025-03-12T12:21:04.20 8.17
2025-03-12T12:21:05.20 8.18
2025-03-12T12:21:06.20 8.15
2025-03-12T12:21:07.20 8.17
2025-03-12T12:21:08.20 8.19
2025-03-12T12:21:09.20 8.17
2025-03-12T12:21:10.20 8.15
2025-03-12T12:21:11.20 8.16
2025-03-12T12:21:12.20 8.18
2025-03-12T12:21:13.20 8.17
2025-03-12T12:21:14.20 8.16
2025-03-12T12:21:15.20 8.18
2025-03-12T12:21:16.20 8.16
2025-03-12T12:21:17.20 8.17
2025-03-12T12:21:18.20 8.17
2025-03-12T12:21:19.20 8.16
2025-03-12T12:21:20.20 8.16
2025-03-12T12:21:21.20 8.17
2025-03-12T12:21:22.20 8.17
2025-03-12T12:21:23.20 8.15
2025-03-12T12:21:24.20 8.20
2025-03-12T12:21:25.20 8.17
2025-03-12T12:21:26.20 8.17
2025-03-12T12:21:27.20 8.17
2025-03-12T12:21:28.20 8.17
2025-03-12T12:21:29.20 8.15
2025-03-12T12:21:30.20 8.18
2025-03-12T12:21:31.20 8.16
2025-03-12T12:21:32.20 8.19
2025-03-12T12:21:33.20 8.17
2025-03-12T12:21:34.20 8.17
2025-03-12T12:21:35.20 8.17
2025-03-12T12:21:36.20 8.16
2025-03-12T12:21:37.20 8.14
2025-03-12T12:21:38.20 8.16
2025-03-12T12:21:39.20 8.16
2025-03-12T12:21:40.20 8.18
2025-03-12T12:21:41.20 8.16
2025-03-12T12:21:42.20 8.16
2025-03-12T12:21:43.20 8.17
2025-03-12T12:21:44.20 8.17
2025-03-12T12:21:45.20 8.16
2025-03-12T12:21:46.20 8.16
2025-03-12T12:21:47.20 8.17
2025-03-12T12:21:48.20 8.19
2025-03-12T12:21:49.20 8.16
2025-03-12T12:21:50.20 8.16
2025-03-12T12:21:51.20 8.16
2025-03-12T12:21:52.20 8.17
2025-03-12T12:21:53.20 8.15
2025-03-12T12:21:54.20 8.16
2025-03-12T12:21:55.20 8.19
2025-03-12T12:21:56.20 8.16
2025-03-12T12:21:57.20 8.18
2025-03-12T12:21:58.20 8.19
2025-03-12T12:21:59.20 8.16
2025-03-12T12:22:00.20 8.19
2025-03-12T12:22:01.20 8.17
2025-03-12T12:22:02.20 8.16
2025-03-12T12:22:03.20 8.18
2025-03-12T12:22:04.20 8.18
2025-03-12T12:22:05.20 8.14
2025-03-12T12:22:06.20 8.17
2025-03-12T12:22:07.20 8.17
2025-03-12T12:22:08.20 8.17
2025-03-12T12:22:09.20 8.14
2025-03-12T12:22:10.20 8.16
2025-03-12T12:22:11.20 8.16
2025-03-12T12:22:12.20 8.15
2025-03-12T12:22:13.20 8.19
2025-03-12T12:22:14.20 8.17
2025-03-12T12:22:15.20 8.17
2025-03-12T12:22:16.20 8.19
2025-03-12T12:22:17.20 8.15
2025-03-12T12:22:18.20 8.18
2025-03-12T12:22:19.20 8.17
2025-03-12T12:22:20.20 8.16
2025-03-12T12:22:21.20 8.17
2025-03-12T12:22:22.20 8.16
2025-03-12T12:22:23.20 8.17
2025-03-12T12:22:24.20 8.17
2025-03-12T12:22:25.20 8.16
2025-03-12T12:22:26.20 8.18
2025-03-12T12:22:27.20 8.19
2025-03-12T12:22:28.20 8.16
2025-03-12T12:22:29.20 8.18
2025-03-12T12:22:30.20 8.16
2025-03-12T12:22:31.20 8.20
2025-03-12T12:22:32.20 8.16
2025-03-12T12:22:33.20 8.16
2025-03-12T12:22:34.20 8.17
2025-03-12T12:22:35.20 8.16
2025-03-12T12:22:36.20 8.16
2025-03-12T12:22:37.20 8.17
2025-03-12T12:22:38.20 8.18
2025-03-12T12:22:39.20 8.17
2025-03-12T12:22:40.20 8.16
2025-03-12T12:22:41.20 8.17
2025-03-12T12:22:42.20 8.17
2025-03-12T12:22:43.20 8.19
2025-03-12T12:22:44.20 8.17
2025-03-12T12:22:45.20 8.18
2025-03-12T12:22:46.20 8.16
2025-03-12T12:22:47.20 8.16
2025-03-12T12:22:48.20 8.18
2025-03-12T12:22:49.20 8.19
2025-03-12T12:22:50.20 8.15
2025-03-12T12:22:51.20 8.18
2025-03-12T12:22:52.20 8.16
2025-03-12T12:22:53.20 8.19
2025-03-12T12:22:54.20 8.16
2025-03-12T12:22:55.20 8.17
2025-03-12T12:22:56.20 8.17
2025-03-12T12:22:57.20 8.17
2025-03-12T12:22:58.20 8.14
2025-03-12T12:22:59.20 8.17
2025-03-12T12:23:00.20 8.18
2025-03-12T12:23:01.20 8.18
2025-03-12T12:23:02.20 8.19
2025-03-12T12:23:03.20 8.17
2025-03-12T12:23:04.20 8.17
2025-03-12T12:23:05.20 8.17
2025-03-12T12:23:06.20 8.17
2025-03-12T12:23:07.20 8.16
2025-03-12T12:23:08.20 8.17
2025-03-12T12:23:09.20 8.17
2025-03-12T12:23:10.20 8.17
2025-03-12T12:23:11.20 8.19
2025-03-12T12:23:12.20 8.17
2025-03-12T12:23:13.20 8.16
2025-03-12T12:23:14.20 8.19
2025-03-12T12:23:15.20 8.19
2025-03-12T12:23:16.20 8.17
2025-03-12T12:23:17.20 8.19
2025-03-12T12:23:18.20 8.18
2025-03-12T12:23:19.20 8.19
2025-03-12T12:23:20.20 8.16
2025-03-12T12:23:21.20 8.16
2025-03-12T12:23:22.20 8.16
2025-03-12T12:23:23.20 8.17
2025-03-12T12:23:24.20 8.17
2025-03-12T12:23:25.20 8.18
2025-03-12T12:23:26.20 8.17
2025-03-12T12:23:27.20 8.19
2025-03-12T12:23:28.20 8.16
2025-03-12T12:23:29.20 8.19
2025-03-12T12:23:30.20 8.17
2025-03-12T12:23:31.20 8.17
2025-03-12T12:23:32.20 8.17
2025-03-12T12:23:33.20 8.18
2025-03-12T12:23:34.20 8.17
2025-03-12T12:23:35.20 8.16
2025-03-12T12:23:36.20 8.18
2025-03-12T12:23:37.20 8.19
2025-03-12T12:23:38.20 8.17
2025-03-12T12:23:39.20 8.17
2025-03-12T12:23:40.20 8.17
2025-03-12T12:23:41.20 8.17
2025-03-12T12:23:42.20 8.17
2025-03-12T12:23:43.20 8.17
2025-03-12T12:23:44.20 8.19
2025-03-12T12:23:45.20 8.17
2025-03-12T12:23:46.20 8.18
2025-03-12T12:23:47.20 8.16
2025-03-12T12:23:48.20 8.18
2025-03-12T12:23:49.20 8.16
2025-03-12T12:23:50.21 8.17
2025-03-12T12:23:51.20 8.16
2025-03-12T12:23:52.20 8.15
2025-03-12T12:23:53.20 8.17
2025-03-12T12:23:54.21 8.17
2025-03-12T12:23:55.21 8.17
2025-03-12T12:23:56.21 8.17
2025-03-12T12:23:57.21 8.14
2025-03-12T12:23:58.21 8.17
2025-03-12T12:23:59.21 8.16
2025-03-12T12:24:00.21 8.16
2025-03-12T12:24:01.21 8.17
2025-03-12T12:24:02.21 8.19
2025-03-12T12:24:03.21 8.19
2025-03-12T12:24:04.21 8.17
2025-03-12T12:24:05.21 8.17
2025-03-12T12:24:06.21 8.17
2025-03-12T12:24:07.21 8.16
2025-03-12T12:24:08.21 8.17
2025-03-12T12:24:09.21 8.17
2025-03-12T12:24:10.21 8.16
2025-03-12T12:24:11.21 8.16
2025-03-12T12:24:12.21 8.17
2025-03-12T12:24:13.21 8.16
2025-03-12T12:24:14.21 8.15
2025-03-12T12:24:15.21 8.16
2025-03-12T12:24:16.21 8.17
2025-03-12T12:24:17.21 8.17
2025-03-12T12:24:18.21 8.17
2025-03-12T12:24:19.21 8.16
2025-03-12T12:24:20.21 8.15
2025-03-12T12:24:21.21 8.17
2025-03-12T12:24:22.21 8.18
2025-03-12T12:24:23.21 8.17
2025-03-12T12:24:24.21 8.19
2025-03-12T12:24:25.21 8.18
2025-03-12T12:24:26.21 8.17
2025-03-12T12:24:27.21 8.18
2025-03-12T12:24:28.21 8.17
2025-03-12T12:24:29.21 8.17
2025-03-12T12:24:30.21 8.18
2025-03-12T12:24:31.21 8.16
2025-03-12T12:24:32.21 8.19
2025-03-12T12:24:33.21 8.16
2025-03-12T12:24:34.21 8.19
2025-03-12T12:24:35.21 8.16
2025-03-12T12:24:36.21 8.17
2025-03-12T12:24:37.21 8.17
2025-03-12T12:24:38.21 8.16
2025-03-12T12:24:39.21 8.15
2025-03-12T12:24:40.21 8.16
2025-03-12T12:24:41.21 8.19
2025-03-12T12:24:42.21 8.17
2025-03-12T12:24:43.21 8.16
2025-03-12T12:24:44.21 8.17
2025-03-12T12:24:45.21 8.17
2025-03-12T12:24:46.21 8.18
2025-03-12T12:24:47.21 8.17
2025-03-12T12:24:48.21 8.19
2025-03-12T12:24:49.21 8.20
2025-03-12T12:24:50.21 8.18
2025-03-12T12:24:51.21 8.19
2025-03-12T12:24:52.21 8.19
2025-03-12T12:24:53.21 8.17
2025-03-12T12:24:54.21 8.17
2025-03-12T12:24:55.21 8.19
2025-03-12T12:24:56.21 8.19
2025-03-12T12:24:57.21 8.17
2025-03-12T12:24:58.21 8.17
2025-03-12T12:24:59.21 8.16
2025-03-12T12:25:00.21 8.17
2025-03-12T12:25:01.21 8.16
2025-03-12T12:25:02.21 8.16
2025-03-12T12:25:03.21 8.17
2025-03-12T12:25:04.21 8.17
2025-03-12T12:25:05.21 8.17
2025-03-12T12:25:06.21 8.18
2025-03-12T12:25:07.21 8.16
2025-03-12T12:25:08.21 8.17
2025-03-12T12:25:09.21 8.17
2025-03-12T12:25:10.21 8.19
2025-03-12T12:25:11.21 8.17
2025-03-12T12:25:12.21 8.16
2025-03-12T12:25:13.21 8.16
2025-03-12T12:25:14.21 8.18
2025-03-12T12:25:15.21 8.17
2025-03-12T12:25:16.21 8.16
2025-03-12T12:25:17.21 8.17
2025-03-12T12:25:18.21 8.15
2025-03-12T12:25:19.21 8.17
2025-03-12T12:25:20.21 8.16
2025-03-12T12:25:21.21 8.16
2025-03-12T12:25:22.21 8.16
2025-03-12T12:25:23.21 8.15
2025-03-12T12:25:24.21 8.16
2025-03-12T12:25:25.21 8.17
2025-03-12T12:25:26.21 8.17
2025-03-12T12:25:27.21 8.17
2025-03-12T12:25:28.21 8.15
2025-03-12T12:25:29.21 8.17
2025-03-12T12:25:30.21 8.17
2025-03-12T12:25:31.21 8.15
2025-03-12T12:25:32.21 8.18
2025-03-12T12:25:33.21 8.19
2025-03-12T12:25:34.21 8.16
2025-03-12T12:25:35.21 8.17
2025-03-12T12:25:36.21 8.16
2025-03-12T12:25:37.21 8.15
2025-03-12T12:25:38.21 8.16
2025-03-12T12:25:39.21 8.19
2025-03-12T12:25:40.21 8.18
2025-03-12T12:25:41.21 8.16
2025-03-12T12:25:42.21 8.14
2025-03-12T12:25:43.21 8.17
2025-03-12T12:25:44.21 8.16
2025-03-12T12:25:45.21 8.17
2025-03-12T12:25:46.21 8.17
2025-03-12T12:25:47.21 8.16
2025-03-12T12:25:48.21 8.17
2025-03-12T12:25:49.21 8.17
2025-03-12T12:25:50.21 8.17
2025-03-12T12:25:51.21 8.16
2025-03-12T12:25:52.21 8.17
2025-03-12T12:25:53.21 8.16
2025-03-12T12:25:54.21 8.17
2025-03-12T12:25:55.21 8.17
2025-03-12T12:25:56.21 8.19
2025-03-12T12:25:57.21 8.16
2025-03-12T12:25:58.21 8.17
2025-03-12T12:25:59.21 8.17
2025-03-12T12:26:00.21 8.17
2025-03-12T12:26:01.21 8.15
2025-03-12T12:26:02.21 8.14
2025-03-12T12:26:03.21 8.15
2025-03-12T12:26:04.21 8.18
2025-03-12T12:26:05.21 8.15
2025-03-12T12:26:06.21 8.17
2025-03-12T12:26:07.21 8.17
2025-03-12T12:26:08.21 8.18
2025-03-12T12:26:09.21 8.14
2025-03-12T12:26:10.21 8.16
2025-03-12T12:26:11.21 8.17
2025-03-12T12:26:12.21 8.17
2025-03-12T12:26:13.21 8.16
2025-03-12T12:26:14.21 8.16
2025-03-12T12:26:15.21 8.16
2025-03-12T12:26:16.21 8.16
2025-03-12T12:26:17.21 8.18
2025-03-12T12:26:18.21 8.15
2025-03-12T12:26:19.21 8.16
2025-03-12T12:26:20.21 8.19
2025-03-12T12:26:21.21 8.18
2025-03-12T12:26:22.21 8.19
2025-03-12T12:26:23.21 8.17
2025-03-12T12:26:24.21 8.18
2025-03-12T12:26:25.21 8.17
2025-03-12T12:26:26.21 8.16
2025-03-12T12:26:27.21 8.17
2025-03-12T12:26:28.21 8.19
2025-03-12T12:26:29.21 8.18
2025-03-12T12:26:30.21 8.19
2025-03-12T12:26:31.21 8.19
2025-03-12T12:26:32.21 8.16
2025-03-12T12:26:33.21 8.17
2025-03-12T12:26:34.21 8.19
2025-03-12T12:26:35.21 8.18
2025-03-12T12:26:36.21 8.16
2025-03-12T12:26:37.21 8.16
2025-03-12T12:26:38.21 8.17
2025-03-12T12:26:39.21 8.15
2025-03-12T12:26:40.21 8.17
2025-03-12T12:26:41.21 8.17
2025-03-12T12:26:42.21 8.16
2025-03-12T12:26:43.21 8.17
2025-03-12T12:26:44.21 8.17
2025-03-12T12:26:45.21 8.16
2025-03-12T12:26:46.21 8.17
2025-03-12T12:26:47.21 8.15
2025-03-12T12:26:48.21 8.15
2025-03-12T12:26:49.21 8.16
2025-03-12T12:26:50.21 8.19
2025-03-12T12:26:51.21 8.16
2025-03-12T12:26:52.21 8.16
2025-03-12T12:26:53.21 8.19
2025-03-12T12:26:54.21 8.16
2025-03-12T12:26:55.21 8.18
2025-03-12T12:26:56.21 8.17
2025-03-12T12:26:57.21 8.16
2025-03-12T12:26:58.21 8.21
2025-03-12T12:26:59.21 8.16
2025-03-12T12:27:00.21 8.17
2025-03-12T12:27:01.21 8.19
2025-03-12T12:27:02.21 8.16
2025-03-12T12:27:03.21 8.15
2025-03-12T12:27:04.21 8.17
2025-03-12T12:27:05.21 8.15
2025-03-12T12:27:06.21 8.17
2025-03-12T12:27:07.21 8.16
2025-03-12T12:27:08.21 8.16
2025-03-12T12:27:09.21 8.16
2025-03-12T12:27:10.21 8.18
2025-03-12T12:27:11.21 8.18
2025-03-12T12:27:12.21 8.19
2025-03-12T12:27:13.21 8.16
2025-03-12T12:27:14.21 8.16
2025-03-12T12:27:15.21 8.18
2025-03-12T12:27:16.21 8.19
2025-03-12T12:27:17.21 8.16
2025-03-12T12:27:18.21 8.17
2025-03-12T12:27:19.21 8.17
2025-03-12T12:27:20.21 8.16
2025-03-12T12:27:21.21 8.19
2025-03-12T12:27:22.21 8.18
2025-03-12T12:27:23.21 8.16
2025-03-12T12:27:24.21 8.20
2025-03-12T12:27:25.21 8.21
2025-03-12T12:27:26.21 8.18
2025-03-12T12:27:27.21 8.17
2025-03-12T12:27:28.21 8.17
2025-03-12T12:27:29.21 8.16
2025-03-12T12:27:30.21 8.16
2025-03-12T12:27:31.21 8.18
2025-03-12T12:27:32.21 8.16
2025-03-12T12:27:33.21 8.17
2025-03-12T12:27:34.21 8.14
2025-03-12T12:27:35.21 8.18
2025-03-12T12:27:36.21 8.17
2025-03-12T12:27:37.21 8.17
2025-03-12T12:27:38.21 8.18
2025-03-12T12:27:39.21 8.19
2025-03-12T12:27:40.21 8.19
2025-03-12T12:27:41.21 8.17
2025-03-12T12:27:42.21 8.18
2025-03-12T12:27:43.21 8.18
2025-03-12T12:27:44.22 8.18
2025-03-12T12:27:45.20 8.16
2025-03-12T12:27:46.20 8.19
2025-03-12T12:27:47.20 8.18
2025-03-12T12:27:48.20 8.16
2025-03-12T12:27:49.20 8.16
2025-03-12T12:27:50.20 8.15
2025-03-12T12:27:51.20 8.16
2025-03-12T12:27:52.20 8.17
2025-03-12T12:27:53.20 8.17
2025-03-12T12:27:54.20 8.16
2025-03-12T12:27:55.20 8.14
2025-03-12T12:27:56.20 8.20
2025-03-12T12:27:57.20 8.18
2025-03-12T12:27:58.20 8.16
2025-03-12T12:27:59.20 8.17
2025-03-12T12:28:00.20 8.16
2025-03-12T12:28:01.20 8.19
2025-03-12T12:28:02.20 8.17
2025-03-12T12:28:03.20 8.15
2025-03-12T12:28:04.20 8.16
2025-03-12T12:28:05.20 8.17
2025-03-12T12:28:06.20 8.16
2025-03-12T12:28:07.20 8.17
2025-03-12T12:28:08.20 8.16
2025-03-12T12:28:09.20 8.17
2025-03-12T12:28:10.20 8.16
2025-03-12T12:28:11.20 8.16
2025-03-12T12:28:12.20 8.16
2025-03-12T12:28:13.20 8.18
2025-03-12T12:28:14.20 8.17
2025-03-12T12:28:15.20 8.18
2025-03-12T12:28:16.20 8.16
2025-03-12T12:28:17.20 8.18
2025-03-12T12:28:18.20 8.16
2025-03-12T12:28:19.20 8.18
2025-03-12T12:28:20.20 8.16
2025-03-12T12:28:21.20 8.17
2025-03-12T12:28:22.20 8.17
2025-03-12T12:28:23.20 8.17
2025-03-12T12:28:24.20 8.16
2025-03-12T12:28:25.20 8.17
2025-03-12T12:28:26.22 8.17
2025-03-12T12:28:27.19 8.17
2025-03-12T12:28:28.19 8.17
2025-03-12T12:28:29.19 8.17
2025-03-12T12:28:30.19 8.18
2025-03-12T12:28:31.19 8.15
2025-03-12T12:28:32.19 8.17
2025-03-12T12:28:33.19 8.16
2025-03-12T12:28:34.19 8.17
2025-03-12T12:28:35.19 8.17
2025-03-12T12:28:36.19 8.16
2025-03-12T12:28:37.19 8.16
2025-03-12T12:28:38.19 8.16
2025-03-12T12:28:39.19 8.17
2025-03-12T12:28:40.19 8.17
2025-03-12T12:28:41.19 8.16
2025-03-12T12:28:42.19 8.17
2025-03-12T12:28:43.19 8.18
2025-03-12T12:28:44.19 8.17
2025-03-12T12:28:45.19 8.19
2025-03-12T12:28:46.19 8.18
2025-03-12T12:28:47.19 8.14
2025-03-12T12:28:48.19 8.17
2025-03-12T12:28:49.19 8.16
2025-03-12T12:28:50.19 8.16
2025-03-12T12:28:51.19 8.16
2025-03-12T12:28:52.19 8.17
2025-03-12T12:28:53.19 8.17
2025-03-12T12:28:54.19 8.17
2025-03-12T12:28:55.19 8.16
2025-03-12T12:28:56.19 8.16
2025-03-12T12:28:57.19 8.16
2025-03-12T12:28:58.19 8.15
2025-03-12T12:28:59.19 8.16
2025-03-12T12:29:00.19 8.18
2025-03-12T12:29:01.19 8.16
2025-03-12T12:29:02.19 8.19
2025-03-12T12:29:03.19 8.18
2025-03-12T12:29:04.19 8.17
2025-03-12T12:29:05.19 8.18
2025-03-12T12:29:06.19 8.17
2025-03-12T12:29:07.19 8.19
2025-03-12T12:29:08.19 8.15
2025-03-12T12:29:09.19 8.16
2025-03-12T12:29:10.19 8.16
2025-03-12T12:29:11.20 8.17
2025-03-12T12:29:12.20 8.17
2025-03-12T12:29:13.20 8.18
2025-03-12T12:29:14.20 8.19
2025-03-12T12:29:15.20 8.17
2025-03-12T12:29:16.20 8.19
2025-03-12T12:29:17.20 8.17
2025-03-12T12:29:18.20 8.17
2025-03-12T12:29:19.20 8.18
2025-03-12T12:29:20.20 8.16
2025-03-12T12:29:21.20 8.14
2025-03-12T12:29:22.20 8.16
2025-03-12T12:29:23.20 8.17
2025-03-12T12:29:24.20 8.19
2025-03-12T12:29:25.20 8.18
2025-03-12T12:29:26.20 8.14
2025-03-12T12:29:27.20 8.17
2025-03-12T12:29:28.20 8.17
2025-03-12T12:29:29.20 8.16
2025-03-12T12:29:30.20 8.18
2025-03-12T12:29:31.20 8.17
2025-03-12T12:29:32.20 8.19
2025-03-12T12:29:33.20 8.16
2025-03-12T12:29:34.20 8.16
2025-03-12T12:29:35.20 8.18
2025-03-12T12:29:36.20 8.16
2025-03-12T12:29:37.20 8.17
2025-03-12T12:29:38.20 8.17
2025-03-12T12:29:39.20 8.14
2025-03-12T12:29:40.20 8.16
2025-03-12T12:29:41.20 8.17
2025-03-12T12:29:42.20 8.17
2025-03-12T12:29:43.20 8.17
2025-03-12T12:29:44.20 8.17
2025-03-12T12:29:45.20 8.16
2025-03-12T12:29:46.20 8.17
2025-03-12T12:29:47.20 8.16
2025-03-12T12:29:48.20 8.17
2025-03-12T12:29:49.20 8.17
2025-03-12T12:29:50.20 8.17
2025-03-12T12:29:51.20 8.15
2025-03-12T12:29:52.20 8.18
2025-03-12T12:29:53.20 8.17
2025-03-12T12:29:54.20 8.17
2025-03-12T12:29:55.20 8.16
2025-03-12T12:29:56.20 8.19
2025-03-12T12:29:57.20 8.15
2025-03-12T12:29:58.20 8.16
2025-03-12T12:29:59.20 8.17
2025-03-12T12:30:00.20 8.18
2025-03-12T12:30:01.20 8.17
2025-03-12T12:30:02.20 8.17
2025-03-12T12:30:03.20 8.17
2025-03-12T12:30:04.20 8.18
2025-03-12T12:30:05.20 8.19
2025-03-12T12:30:06.20 8.17
2025-03-12T12:30:07.20 8.17
2025-03-12T12:30:08.20 8.16
2025-03-12T12:30:09.20 8.16
2025-03-12T12:30:10.20 8.16
2025-03-12T12:30:11.20 8.17
2025-03-12T12:30:12.20 8.17
2025-03-12T12:30:13.20 8.17
2025-03-12T12:30:14.20 8.17
2025-03-12T12:30:15.20 8.16
2025-03-12T12:30:16.20 8.16
2025-03-12T12:30:17.20 8.16
2025-03-12T12:30:18.20 8.16
2025-03-12T12:30:19.20 8.16
2025-03-12T12:30:20.20 8.17
2025-03-12T12:30:21.20 8.16
2025-03-12T12:30:22.20 8.19
2025-03-12T12:30:23.20 8.18
2025-03-12T12:30:24.20 8.17
2025-03-12T12:30:25.20 8.17
2025-03-12T12:30:26.20 8.18
2025-03-12T12:30:27.20 8.16
2025-03-12T12:30:28.20 8.16
2025-03-12T12:30:29.20 8.19
2025-03-12T12:30:30.20 8.16
2025-03-12T12:30:31.20 8.19
2025-03-12T12:30:32.20 8.17
2025-03-12T12:30:33.20 8.16
2025-03-12T12:30:34.20 8.17
2025-03-12T12:30:35.20 8.16
2025-03-12T12:30:36.20 8.17
2025-03-12T12:30:37.20 8.15
2025-03-12T12:30:38.20 8.16
2025-03-12T12:30:39.20 8.18
2025-03-12T12:30:40.20 8.18
2025-03-12T12:30:41.20 8.18
2025-03-12T12:30:42.20 8.18
2025-03-12T12:30:43.20 8.19
2025-03-12T12:30:44.20 8.18
2025-03-12T12:30:45.20 8.17
2025-03-12T12:30:46.20 8.18
2025-03-12T12:30:47.20 8.19
2025-03-12T12:30:48.20 8.18
2025-03-12T12:30:49.20 8.16
2025-03-12T12:30:50.20 8.19
2025-03-12T12:30:51.20 8.17
2025-03-12T12:30:52.20 8.17
2025-03-12T12:30:53.20 8.16
2025-03-12T12:30:54.20 8.16
2025-03-12T12:30:55.20 8.16
2025-03-12T12:30:56.20 8.17
2025-03-12T12:30:57.20 8.17
2025-03-12T12:30:58.20 8.17
2025-03-12T12:30:59.20 8.16
2025-03-12T12:31:00.20 8.17
2025-03-12T12:31:01.20 8.15
2025-03-12T12:31:02.20 8.17
2025-03-12T12:31:03.20 8.14
2025-03-12T12:31:04.20 8.18
2025-03-12T12:31:05.20 8.17
2025-03-12T12:31:06.20 8.16
2025-03-12T12:31:07.20 8.17
2025-03-12T12:31:08.20 8.17
2025-03-12T12:31:09.20 8.20
2025-03-12T12:31:10.20 8.17
2025-03-12T12:31:11.20 8.17
2025-03-12T12:31:12.20 8.16
2025-03-12T12:31:13.20 8.17
2025-03-12T12:31:14.20 8.16
2025-03-12T12:31:15.20 8.19
2025-03-12T12:31:16.20 8.17
2025-03-12T12:31:17.20 8.19
2025-03-12T12:31:18.20 8.19
2025-03-12T12:31:19.20 8.19
2025-03-12T12:31:20.20 8.17
2025-03-12T12:31:21.20 8.17
2025-03-12T12:31:22.20 8.17
2025-03-12T12:31:23.20 8.16
2025-03-12T12:31:24.20 8.19
2025-03-12T12:31:25.20 8.18
2025-03-12T12:31:26.20 8.16
2025-03-12T12:31:27.20 8.17
2025-03-12T12:31:28.20 8.16
2025-03-12T12:31:29.20 8.17
2025-03-12T12:31:30.20 8.17
2025-03-12T12:31:31.20 8.16
2025-03-12T12:31:32.20 8.18
2025-03-12T12:31:33.20 8.16
2025-03-12T12:31:34.20 8.16
2025-03-12T12:31:35.20 8.18
2025-03-12T12:31:36.20 8.17
2025-03-12T12:31:37.20 8.16
2025-03-12T12:31:38.20 8.17
2025-03-12T12:31:39.20 8.16
2025-03-12T12:31:40.20 8.16
2025-03-12T12:31:41.20 8.16
2025-03-12T12:31:42.20 8.18
2025-03-12T12:31:43.20 8.17
2025-03-12T12:31:44.20 8.16
2025-03-12T12:31:45.20 8.16
2025-03-12T12:31:46.20 8.15
2025-03-12T12:31:47.20 8.15
2025-03-12T12:31:48.20 8.17
2025-03-12T12:31:49.20 8.17
2025-03-12T12:31:50.20 8.16
2025-03-12T12:31:51.20 8.16
2025-03-12T12:31:52.20 8.17
2025-03-12T12:31:53.20 8.16
2025-03-12T12:31:54.20 8.14
2025-03-12T12:31:55.20 8.17
2025-03-12T12:31:56.20 8.17
2025-03-12T12:31:57.20 8.16
2025-03-12T12:31:58.20 8.16
2025-03-12T12:31:59.20 8.17
2025-03-12T12:32:00.20 8.18
2025-03-12T12:32:01.20 8.16
2025-03-12T12:32:02.20 8.17
2025-03-12T12:32:03.20 8.18
2025-03-12T12:32:04.20 8.18
2025-03-12T12:32:05.20 8.16
2025-03-12T12:32:06.20 8.16
2025-03-12T12:32:07.20 8.17
2025-03-12T12:32:08.20 8.17
2025-03-12T12:32:09.20 8.18
2025-03-12T12:32:10.20 8.17
2025-03-12T12:32:11.20 8.16
2025-03-12T12:32:12.20 8.15
2025-03-12T12:32:13.20 8.16
2025-03-12T12:32:14.20 8.19
2025-03-12T12:32:15.20 8.17
2025-03-12T12:32:16.20 8.16
2025-03-12T12:32:17.20 8.17
2025-03-12T12:32:18.20 8.17
2025-03-12T12:32:19.20 8.16
2025-03-12T12:32:20.20 8.16
2025-03-12T12:32:21.20 8.16
2025-03-12T12:32:22.20 8.17
2025-03-12T12:32:23.20 8.16
2025-03-12T12:32:24.20 8.18
2025-03-12T12:32:25.20 8.16
2025-03-12T12:32:26.20 8.15
2025-03-12T12:32:27.20 8.17
2025-03-12T12:32:28.20 8.18
2025-03-12T12:32:29.20 8.16
2025-03-12T12:32:30.20 8.16
2025-03-12T12:32:31.20 8.16
2025-03-12T12:32:32.20 8.19
2025-03-12T12:32:33.20 8.16
2025-03-12T12:32:34.20 8.17
2025-03-12T12:32:35.20 8.17
2025-03-12T12:32:36.20 8.19
2025-03-12T12:32:37.20 8.19
2025-03-12T12:32:38.20 8.16
2025-03-12T12:32:39.20 8.18
2025-03-12T12:32:40.20 8.16
2025-03-12T12:32:41.20 8.17
2025-03-12T12:32:42.20 8.17
2025-03-12T12:32:43.20 8.14
2025-03-12T12:32:44.20 8.17
2025-03-12T12:32:45.20 8.17
2025-03-12T12:32:46.20 8.17
2025-03-12T12:32:47.20 8.17
2025-03-12T12:32:48.20 8.16
2025-03-12T12:32:49.20 8.19
2025-03-12T12:32:50.20 8.19
2025-03-12T12:32:51.20 8.19
2025-03-12T12:32:52.20 8.16
2025-03-12T12:32:53.20 8.17
2025-03-12T12:32:54.20 8.19
2025-03-12T12:32:55.20 8.16
2025-03-12T12:32:56.20 8.17
2025-03-12T12:32:57.20 8.17
2025-03-12T12:32:58.20 8.17
2025-03-12T12:32:59.20 8.17
2025-03-12T12:33:00.20 8.18
2025-03-12T12:33:01.20 8.15
2025-03-12T12:33:02.20 8.16
2025-03-12T12:33:03.20 8.15
2025-03-12T12:33:04.20 8.17
2025-03-12T12:33:05.20 8.16
2025-03-12T12:33:06.20 8.17
2025-03-12T12:33:07.20 8.16
2025-03-12T12:33:08.20 8.16
2025-03-12T12:33:09.20 8.20
2025-03-12T12:33:10.20 8.16
2025-03-12T12:33:11.20 8.18
2025-03-12T12:33:12.20 8.17
2025-03-12T12:33:13.20 8.16
2025-03-12T12:33:14.20 8.16
2025-03-12T12:33:15.20 8.18
2025-03-12T12:33:16.20 8.16
2025-03-12T12:33:17.20 8.17
2025-03-12T12:33:18.20 8.17
2025-03-12T12:33:19.20 8.16
2025-03-12T12:33:20.20 8.18
2025-03-12T12:33:21.20 8.16
2025-03-12T12:33:22.20 8.18
2025-03-12T12:33:23.20 8.19
2025-03-12T12:33:24.20 8.17
2025-03-12T12:33:25.20 8.17
2025-03-12T12:33:26.20 8.19
2025-03-12T12:33:27.20 8.17
2025-03-12T12:33:28.20 8.16
2025-03-12T12:33:29.20 8.17
2025-03-12T12:33:30.20 8.17
2025-03-12T12:33:31.20 8.16
2025-03-12T12:33:32.20 8.18
2025-03-12T12:33:33.20 8.15
2025-03-12T12:33:34.20 8.17
2025-03-12T12:33:35.20 8.17
2025-03-12T12:33:36.20 8.17
2025-03-12T12:33:37.20 8.18
2025-03-12T12:33:38.20 8.17
2025-03-12T12:33:39.20 8.17
2025-03-12T12:33:40.20 8.16
2025-03-12T12:33:41.20 8.17
2025-03-12T12:33:42.20 8.17
2025-03-12T12:33:43.20 8.18
2025-03-12T12:33:44.20 8.15
2025-03-12T12:33:45.20 8.15
2025-03-12T12:33:46.20 8.17
2025-03-12T12:33:47.20 8.16
2025-03-12T12:33:48.20 8.16
2025-03-12T12:33:49.21 8.17
2025-03-12T12:33:50.20 8.16
2025-03-12T12:33:51.20 8.14
2025-03-12T12:33:52.20 8.17
2025-03-12T12:33:53.20 8.17
2025-03-12T12:33:54.20 8.17
2025-03-12T12:33:55.20 8.18
2025-03-12T12:33:56.20 8.16
2025-03-12T12:33:57.20 8.18
2025-03-12T12:33:58.20 8.17
2025-03-12T12:33:59.20 8.18
2025-03-12T12:34:00.21 8.17
2025-03-12T12:34:01.19 8.20
2025-03-12T12:34:02.19 8.16
2025-03-12T12:34:03.19 8.16
2025-03-12T12:34:04.19 8.17
2025-03-12T12:34:05.19 8.18
2025-03-12T12:34:06.19 8.19
2025-03-12T12:34:07.19 8.17
2025-03-12T12:34:08.19 8.18
2025-03-12T12:34:09.19 8.17
2025-03-12T12:34:10.19 8.18
2025-03-12T12:34:11.19 8.16
2025-03-12T12:34:12.19 8.17
2025-03-12T12:34:13.19 8.17
2025-03-12T12:34:14.19 8.21
2025-03-12T12:34:15.19 8.17
2025-03-12T12:34:16.19 8.17
2025-03-12T12:34:17.19 8.18
2025-03-12T12:34:18.19 8.16
2025-03-12T12:34:19.19 8.18
2025-03-12T12:34:20.19 8.18
2025-03-12T12:34:21.20 8.16
2025-03-12T12:34:22.19 8.15
2025-03-12T12:34:23.19 8.16
2025-03-12T12:34:24.19 8.18
2025-03-12T12:34:25.19 8.15
2025-03-12T12:34:26.19 8.17
2025-03-12T12:34:27.19 8.15
2025-03-12T12:34:28.19 8.16
2025-03-12T12:34:29.19 8.16
2025-03-12T12:34:30.20 8.19
2025-03-12T12:34:31.20 8.17
2025-03-12T12:34:32.20 8.16
2025-03-12T12:34:33.20 8.20
2025-03-12T12:34:34.20 8.17
2025-03-12T12:34:35.20 8.19
2025-03-12T12:34:36.20 8.19
2025-03-12T12:34:37.20 8.17
2025-03-12T12:34:38.20 8.17
2025-03-12T12:34:39.20 8.17
2025-03-12T12:34:40.20 8.18
2025-03-12T12:34:41.20 8.18
2025-03-12T12:34:42.20 8.19
2025-03-12T12:34:43.20 8.19
2025-03-12T12:34:44.20 8.18
2025-03-12T12:34:45.20 8.17
2025-03-12T12:34:46.20 8.19
2025-03-12T12:34:47.20 8.16
2025-03-12T12:34:48.20 8.17
2025-03-12T12:34:49.20 8.17
2025-03-12T12:34:50.20 8.18
2025-03-12T12:34:51.20 8.18
2025-03-12T12:34:52.20 8.16
2025-03-12T12:34:53.20 8.16
2025-03-12T12:34:54.20 8.18
2025-03-12T12:34:55.20 8.18
2025-03-12T12:34:56.20 8.15
2025-03-12T12:34:57.20 8.16
2025-03-12T12:34:58.20 8.17
2025-03-12T12:34:59.20 8.18
2025-03-12T12:35:00.20 8.16
2025-03-12T12:35:01.20 8.19
2025-03-12T12:35:02.20 8.17
2025-03-12T12:35:03.20 8.17
2025-03-12T12:35:04.20 8.17
2025-03-12T12:35:05.20 8.18
2025-03-12T12:35:06.20 8.16
2025-03-12T12:35:07.20 8.17
2025-03-12T12:35:08.20 8.17
2025-03-12T12:35:09.20 8.17
2025-03-12T12:35:10.20 8.18
2025-03-12T12:35:11.20 8.18
2025-03-12T12:35:12.20 8.16
2025-03-12T12:35:13.20 8.18
2025-03-12T12:35:14.20 8.18
2025-03-12T12:35:15.20 8.17
2025-03-12T12:35:16.20 8.16
2025-03-12T12:35:17.20 8.16
2025-03-12T12:35:18.20 8.17
2025-03-12T12:35:19.20 8.16
2025-03-12T12:35:20.20 8.16
2025-03-12T12:35:21.20 8.16
2025-03-12T12:35:22.20 8.16
2025-03-12T12:35:23.20 8.16
2025-03-12T12:35:24.20 8.17
2025-03-12T12:35:25.20 8.16
2025-03-12T12:35:26.20 8.19
2025-03-12T12:35:27.20 8.19
2025-03-12T12:35:28.20 8.17
2025-03-12T12:35:29.20 8.18
2025-03-12T12:35:30.20 8.17
2025-03-12T12:35:31.20 8.17
2025-03-12T12:35:32.20 8.18
2025-03-12T12:35:33.20 8.19
2025-03-12T12:35:34.20 8.19
2025-03-12T12:35:35.20 8.19
2025-03-12T12:35:36.20 8.16
2025-03-12T12:35:37.20 8.16
2025-03-12T12:35:38.20 8.17
2025-03-12T12:35:39.20 8.17
2025-03-12T12:35:40.20 8.18
2025-03-12T12:35:41.20 8.18
2025-03-12T12:35:42.20 8.17
2025-03-12T12:35:43.20 8.15
2025-03-12T12:35:44.20 8.18
2025-03-12T12:35:45.20 8.20
2025-03-12T12:35:46.20 8.16
2025-03-12T12:35:47.20 8.17
2025-03-12T12:35:48.20 8.16
2025-03-12T12:35:49.20 8.19
2025-03-12T12:35:50.20 8.15
2025-03-12T12:35:51.20 8.19
2025-03-12T12:35:52.20 8.16
2025-03-12T12:35:53.20 8.17
2025-03-12T12:35:54.20 8.17
2025-03-12T12:35:55.20 8.17
2025-03-12T12:35:56.20 8.18
2025-03-12T12:35:57.20 8.19
2025-03-12T12:35:58.20 8.18
2025-03-12T12:35:59.20 8.17
2025-03-12T12:36:00.20 8.19
2025-03-12T12:36:01.20 8.16
2025-03-12T12:36:02.20 8.16
2025-03-12T12:36:03.20 8.16
2025-03-12T12:36:04.20 8.17
2025-03-12T12:36:05.20 8.20
2025-03-12T12:36:06.20 8.18
2025-03-12T12:36:07.20 8.17
2025-03-12T12:36:08.20 8.19
2025-03-12T12:36:09.20 8.19
2025-03-12T12:36:10.20 8.18
2025-03-12T12:36:11.20 8.18
2025-03-12T12:36:12.20 8.17
2025-03-12T12:36:13.20 8.18
2025-03-12T12:36:14.20 8.16
2025-03-12T12:36:15.20 8.17
2025-03-12T12:36:16.20 8.18
2025-03-12T12:36:17.20 8.16
2025-03-12T12:36:18.20 8.16
2025-03-12T12:36:19.20 8.18
2025-03-12T12:36:20.20 8.16
2025-03-12T12:36:21.20 8.19
2025-03-12T12:36:22.20 8.19
2025-03-12T12:36:23.20 8.18
2025-03-12T12:36:24.20 8.17
2025-03-12T12:36:25.20 8.16
2025-03-12T12:36:26.20 8.17
2025-03-12T12:36:27.20 8.16
2025-03-12T12:36:28.20 8.17
2025-03-12T12:36:29.20 8.16
2025-03-12T12:36:30.20 8.17
2025-03-12T12:36:31.20 8.17
2025-03-12T12:36:32.20 8.17
2025-03-12T12:36:33.20 8.19
2025-03-12T12:36:34.20 8.18
2025-03-12T12:36:35.20 8.16
2025-03-12T12:36:36.20 8.18
2025-03-12T12:36:37.20 8.18
2025-03-12T12:36:38.20 8.17
2025-03-12T12:36:39.20 8.17
2025-03-12T12:36:40.20 8.17
2025-03-12T12:36:41.20 8.15
2025-03-12T12:36:42.20 8.17
2025-03-12T12:36:43.20 8.16
2025-03-12T12:36:44.20 8.19
2025-03-12T12:36:45.20 8.17
2025-03-12T12:36:46.20 8.16
2025-03-12T12:36:47.20 8.18
2025-03-12T12:36:48.20 8.17
2025-03-12T12:36:49.20 8.17
2025-03-12T12:36:50.20 8.16
2025-03-12T12:36:51.20 8.15
2025-03-12T12:36:52.20 8.17
2025-03-12T12:36:53.20 8.18
2025-03-12T12:36:54.20 8.17
2025-03-12T12:36:55.20 8.17
2025-03-12T12:36:56.20 8.17
2025-03-12T12:36:57.20 8.17
2025-03-12T12:36:58.20 8.17
2025-03-12T12:36:59.20 8.17
2025-03-12T12:37:00.20 8.17
2025-03-12T12:37:01.21 8.18
2025-03-12T12:37:02.19 8.18
2025-03-12T12:37:03.19 8.17
2025-03-12T12:37:04.19 8.18
2025-03-12T12:37:05.19 8.17
2025-03-12T12:37:06.19 8.17
2025-03-12T12:37:07.19 8.17
2025-03-12T12:37:08.19 8.16
2025-03-12T12:37:09.19 8.19
2025-03-12T12:37:10.19 8.17
2025-03-12T12:37:11.19 8.17
2025-03-12T12:37:12.19 8.17
2025-03-12T12:37:13.19 8.17
2025-03-12T12:37:14.19 8.17
2025-03-12T12:37:15.19 8.16
2025-03-12T12:37:16.19 8.17
2025-03-12T12:37:17.19 8.17
2025-03-12T12:37:18.19 8.16
2025-03-12T12:37:19.19 8.18
2025-03-12T12:37:20.19 8.17
2025-03-12T12:37:21.19 8.17
2025-03-12T12:37:22.19 8.16
2025-03-12T12:37:23.19 8.18
2025-03-12T12:37:24.19 8.17
2025-03-12T12:37:25.19 8.16
2025-03-12T12:37:26.19 8.17
2025-03-12T12:37:27.19 8.16
2025-03-12T12:37:28.19 8.18
2025-03-12T12:37:29.19 8.16
2025-03-12T12:37:30.19 8.18
2025-03-12T12:37:31.19 8.16
2025-03-12T12:37:32.19 8.17
2025-03-12T12:37:33.19 8.17
2025-03-12T12:37:34.19 8.17
2025-03-12T12:37:35.19 8.15
2025-03-12T12:37:36.19 8.17
2025-03-12T12:37:37.19 8.17
2025-03-12T12:37:38.19 8.18
2025-03-12T12:37:39.19 8.16
2025-03-12T12:37:40.19 8.16
2025-03-12T12:37:41.19 8.17
2025-03-12T12:37:42.19 8.17
2025-03-12T12:37:43.19 8.17
2025-03-12T12:37:44.19 8.16
2025-03-12T12:37:45.19 8.16
2025-03-12T12:37:46.19 8.18
2025-03-12T12:37:47.19 8.16
2025-03-12T12:37:48.19 8.18
2025-03-12T12:37:49.19 8.19
2025-03-12T12:37:50.19 8.16
2025-03-12T12:37:51.19 8.16
2025-03-12T12:37:52.20 8.18
2025-03-12T12:37:53.20 8.16
2025-03-12T12:37:54.20 8.16
2025-03-12T12:37:55.20 8.17
2025-03-12T12:37:56.20 8.16
2025-03-12T12:37:57.20 8.19
2025-03-12T12:37:58.20 8.19
2025-03-12T12:37:59.20 8.16
2025-03-12T12:38:00.20 8.18
2025-03-12T12:38:01.20 8.17
2025-03-12T12:38:02.20 8.19
2025-03-12T12:38:03.20 8.16
2025-03-12T12:38:04.20 8.19
2025-03-12T12:38:05.20 8.16
2025-03-12T12:38:06.20 8.15
2025-03-12T12:38:07.20 8.20
2025-03-12T12:38:08.20 8.20
2025-03-12T12:38:09.20 8.16
2025-03-12T12:38:10.20 8.18
2025-03-12T12:38:11.20 8.16
2025-03-12T12:38:12.20 8.16
2025-03-12T12:38:13.20 8.16
2025-03-12T12:38:14.20 8.17
2025-03-12T12:38:15.20 8.17
2025-03-12T12:38:16.20 8.18
2025-03-12T12:38:17.20 8.17
2025-03-12T12:38:18.20 8.20
2025-03-12T12:38:19.20 8.16
2025-03-12T12:38:20.20 8.14
2025-03-12T12:38:21.20 8.18
2025-03-12T12:38:22.20 8.16
2025-03-12T12:38:23.20 8.18
2025-03-12T12:38:24.20 8.16
2025-03-12T12:38:25.20 8.16
2025-03-12T12:38:26.20 8.18
2025-03-12T12:38:27.20 8.17
2025-03-12T12:38:28.20 8.18
2025-03-12T12:38:29.20 8.19
2025-03-12T12:38:30.20 8.17
2025-03-12T12:38:31.20 8.18
2025-03-12T12:38:32.20 8.18
2025-03-12T12:38:33.20 8.16
2025-03-12T12:38:34.20 8.16
2025-03-12T12:38:35.20 8.18
2025-03-12T12:38:36.20 8.17
2025-03-12T12:38:37.20 8.16
2025-03-12T12:38:38.20 8.18
2025-03-12T12:38:39.20 8.17
2025-03-12T12:38:40.20 8.16
2025-03-12T12:38:41.20 8.17
2025-03-12T12:38:42.20 8.16
2025-03-12T12:38:43.20 8.17
2025-03-12T12:38:44.20 8.16
2025-03-12T12:38:45.20 8.16
2025-03-12T12:38:46.20 8.17
2025-03-12T12:38:47.20 8.18
2025-03-12T12:38:48.20 8.19
2025-03-12T12:38:49.20 8.18
2025-03-12T12:38:50.20 8.16
2025-03-12T12:38:51.20 8.17
2025-03-12T12:38:52.20 8.17
2025-03-12T12:38:53.20 8.17
2025-03-12T12:38:54.20 8.20
2025-03-12T12:38:55.20 8.17
2025-03-12T12:38:56.20 8.17
2025-03-12T12:38:57.20 8.18
2025-03-12T12:38:58.20 8.19
2025-03-12T12:38:59.20 8.17
2025-03-12T12:39:00.20 8.19
2025-03-12T12:39:01.20 8.19
2025-03-12T12:39:02.20 8.18
2025-03-12T12:39:03.20 8.18
2025-03-12T12:39:04.20 8.16
2025-03-12T12:39:05.20 8.18
2025-03-12T12:39:06.20 8.17
2025-03-12T12:39:07.20 8.16
2025-03-12T12:39:08.20 8.19
2025-03-12T12:39:09.20 8.17
2025-03-12T12:39:10.20 8.15
2025-03-12T12:39:11.20 8.17
2025-03-12T12:39:12.20 8.15
2025-03-12T12:39:13.20 8.19
2025-03-12T12:39:14.20 8.15
2025-03-12T12:39:15.20 8.17
2025-03-12T12:39:16.20 8.17
2025-03-12T12:39:17.20 8.17
2025-03-12T12:39:18.20 8.16
2025-03-12T12:39:19.20 8.16
2025-03-12T12:39:20.20 8.18
2025-03-12T12:39:21.20 8.17
2025-03-12T12:39:22.20 8.16
2025-03-12T12:39:23.20 8.17
2025-03-12T12:39:24.20 8.16
2025-03-12T12:39:25.20 8.18
2025-03-12T12:39:26.20 8.16
2025-03-12T12:39:27.20 8.15
2025-03-12T12:39:28.20 8.17
2025-03-12T12:39:29.20 8.17
2025-03-12T12:39:30.20 8.17
2025-03-12T12:39:31.20 8.17
2025-03-12T12:39:32.20 8.19
2025-03-12T12:39:33.20 8.16
2025-03-12T12:39:34.20 8.17
2025-03-12T12:39:35.20 8.17
2025-03-12T12:39:36.20 8.17
2025-03-12T12:39:37.20 8.17
2025-03-12T12:39:38.20 8.15
2025-03-12T12:39:39.20 8.17
2025-03-12T12:39:40.20 8.19
2025-03-12T12:39:41.20 8.16
2025-03-12T12:39:42.20 8.19
2025-03-12T12:39:43.20 8.17
2025-03-12T12:39:44.20 8.17
2025-03-12T12:39:45.20 8.17
2025-03-12T12:39:46.20 8.17
2025-03-12T12:39:47.20 8.17
2025-03-12T12:39:48.20 8.16
2025-03-12T12:39:49.21 8.14
2025-03-12T12:39:50.21 8.16
2025-03-12T12:39:51.21 8.15
2025-03-12T12:39:52.21 8.17
2025-03-12T12:39:53.21 8.16
2025-03-12T12:39:54.21 8.16
2025-03-12T12:39:55.21 8.15
2025-03-12T12:39:56.21 8.17
2025-03-12T12:39:57.21 8.15
2025-03-12T12:39:58.21 8.18
2025-03-12T12:39:59.21 8.14
2025-03-12T12:40:00.21 8.16
2025-03-12T12:40:01.21 8.17
2025-03-12T12:40:02.21 8.16
2025-03-12T12:40:03.21 8.16
2025-03-12T12:40:04.21 8.17
2025-03-12T12:40:05.21 8.17
2025-03-12T12:40:06.21 8.16
2025-03-12T12:40:07.21 8.17
2025-03-12T12:40:08.21 8.17
2025-03-12T12:40:09.21 8.16
2025-03-12T12:40:10.21 8.17
2025-03-12T12:40:11.21 8.15
2025-03-12T12:40:12.21 8.18
2025-03-12T12:40:13.21 8.17
2025-03-12T12:40:14.21 8.14
2025-03-12T12:40:15.21 8.18
2025-03-12T12:40:16.21 8.17
2025-03-12T12:40:17.21 8.17
2025-03-12T12:40:18.21 8.17
2025-03-12T12:40:19.21 8.17
2025-03-12T12:40:20.21 8.18
2025-03-12T12:40:21.21 8.16
2025-03-12T12:40:22.21 8.17
2025-03-12T12:40:23.21 8.16
2025-03-12T12:40:24.21 8.18
2025-03-12T12:40:25.21 8.17
2025-03-12T12:40:26.21 8.18
2025-03-12T12:40:27.21 8.17
2025-03-12T12:40:28.21 8.17
2025-03-12T12:40:29.21 8.19
2025-03-12T12:40:30.21 8.15
2025-03-12T12:40:31.21 8.17
2025-03-12T12:40:32.21 8.19
2025-03-12T12:40:33.21 8.19
2025-03-12T12:40:34.21 8.16
2025-03-12T12:40:35.21 8.20
2025-03-12T12:40:36.21 8.17
2025-03-12T12:40:37.21 8.16
2025-03-12T12:40:38.21 8.18
2025-03-12T12:40:39.21 8.19
2025-03-12T12:40:40.21 8.16
2025-03-12T12:40:41.21 8.16
2025-03-12T12:40:42.21 8.17
2025-03-12T12:40:43.21 8.19
2025-03-12T12:40:44.21 8.16
2025-03-12T12:40:45.21 8.19
2025-03-12T12:40:46.21 8.17
2025-03-12T12:40:47.21 8.17
2025-03-12T12:40:48.21 8.17
2025-03-12T12:40:49.21 8.17
2025-03-12T12:40:50.21 8.16
2025-03-12T12:40:51.21 8.17
2025-03-12T12:40:52.21 8.17
2025-03-12T12:40:53.21 8.20
2025-03-12T12:40:54.21 8.17
2025-03-12T12:40:55.21 8.19
2025-03-12T12:40:56.21 8.16
2025-03-12T12:40:57.21 8.17
2025-03-12T12:40:58.21 8.17
2025-03-12T12:40:59.21 8.19
2025-03-12T12:41:00.21 8.19
2025-03-12T12:41:01.21 8.18
2025-03-12T12:41:02.21 8.17
2025-03-12T12:41:03.21 8.19
2025-03-12T12:41:04.21 8.17
2025-03-12T12:41:05.21 8.17
2025-03-12T12:41:06.21 8.19
2025-03-12T12:41:07.21 8.16
2025-03-12T12:41:08.21 8.19
2025-03-12T12:41:09.21 8.17
2025-03-12T12:41:10.21 8.16
2025-03-12T12:41:11.21 8.17
2025-03-12T12:41:12.21 8.18
2025-03-12T12:41:13.21 8.17
2025-03-12T12:41:14.21 8.16
2025-03-12T12:41:15.21 8.17
2025-03-12T12:41:16.21 8.16
2025-03-12T12:41:17.21 8.17
2025-03-12T12:41:18.21 8.16
2025-03-12T12:41:19.21 8.17
2025-03-12T12:41:20.21 8.17
2025-03-12T12:41:21.21 8.17
2025-03-12T12:41:22.21 8.18
2025-03-12T12:41:23.21 8.17
2025-03-12T12:41:24.21 8.17
2025-03-12T12:41:25.21 8.19
2025-03-12T12:41:26.21 8.17
2025-03-12T12:41:27.21 8.17
2025-03-12T12:41:28.21 8.17
2025-03-12T12:41:29.21 8.18
2025-03-12T12:41:30.21 8.18
2025-03-12T12:41:31.21 8.15
2025-03-12T12:41:32.21 8.17
2025-03-12T12:41:33.21 8.18
2025-03-12T12:41:34.21 8.17
2025-03-12T12:41:35.21 8.16
2025-03-12T12:41:36.21 8.16
2025-03-12T12:41:37.21 8.16
2025-03-12T12:41:38.21 8.17
2025-03-12T12:41:39.21 8.17
2025-03-12T12:41:40.21 8.17
2025-03-12T12:41:41.21 8.17
2025-03-12T12:41:42.21 8.18
2025-03-12T12:41:43.21 8.19
2025-03-12T12:41:44.22 8.15
2025-03-12T12:41:45.20 8.17
2025-03-12T12:41:46.20 8.16
2025-03-12T12:41:47.20 8.16
2025-03-12T12:41:48.20 8.17
2025-03-12T12:41:49.20 8.17
2025-03-12T12:41:50.20 8.17
2025-03-12T12:41:51.20 8.19
2025-03-12T12:41:52.20 8.17
2025-03-12T12:41:53.20 8.17
2025-03-12T12:41:54.20 8.18
2025-03-12T12:41:55.20 8.17
2025-03-12T12:41:56.20 8.17
2025-03-12T12:41:57.20 8.17
2025-03-12T12:41:58.20 8.17
2025-03-12T12:41:59.20 8.16
2025-03-12T12:42:00.20 8.16
2025-03-12T12:42:01.20 8.18
2025-03-12T12:42:02.20 8.17
2025-03-12T12:42:03.20 8.16
2025-03-12T12:42:04.20 8.17
2025-03-12T12:42:05.20 8.16
2025-03-12T12:42:06.20 8.19
2025-03-12T12:42:07.20 8.17
2025-03-12T12:42:08.20 8.17
2025-03-12T12:42:09.20 8.19
2025-03-12T12:42:10.20 8.21
2025-03-12T12:42:11.20 8.18
2025-03-12T12:42:12.20 8.14
2025-03-12T12:42:13.20 8.17
2025-03-12T12:42:14.20 8.18
2025-03-12T12:42:15.20 8.17
2025-03-12T12:42:16.20 8.17
2025-03-12T12:42:17.20 8.17
2025-03-12T12:42:18.20 8.19
2025-03-12T12:42:19.20 8.17
2025-03-12T12:42:20.20 8.16
2025-03-12T12:42:21.20 8.16
2025-03-12T12:42:22.20 8.17
2025-03-12T12:42:23.20 8.17
2025-03-12T12:42:24.20 8.19
2025-03-12T12:42:25.20 8.17
2025-03-12T12:42:26.20 8.16
2025-03-12T12:42:27.20 8.16
2025-03-12T12:42:28.20 8.16
2025-03-12T12:42:29.20 8.16
2025-03-12T12:42:30.20 8.15
2025-03-12T12:42:31.20 8.16
2025-03-12T12:42:32.20 8.15
2025-03-12T12:42:33.20 8.18
2025-03-12T12:42:34.20 8.17
2025-03-12T12:42:35.20 8.17
2025-03-12T12:42:36.20 8.17
2025-03-12T12:42:37.20 8.18
2025-03-12T12:42:38.20 8.16
2025-03-12T12:42:39.20 8.19
2025-03-12T12:42:40.20 8.18
2025-03-12T12:42:41.20 8.18
2025-03-12T12:42:42.20 8.17
2025-03-12T12:42:43.20 8.17
2025-03-12T12:42:44.20 8.14
2025-03-12T12:42:45.20 8.17
2025-03-12T12:42:46.20 8.15
2025-03-12T12:42:47.20 8.15
2025-03-12T12:42:48.20 8.17
2025-03-12T12:42:49.20 8.17
2025-03-12T12:42:50.20 8.17
2025-03-12T12:42:51.20 8.17
2025-03-12T12:42:52.20 8.17
2025-03-12T12:42:53.20 8.17
2025-03-12T12:42:54.20 8.17
2025-03-12T12:42:55.20 8.17
2025-03-12T12:42:56.20 8.16
2025-03-12T12:42:57.20 8.16
2025-03-12T12:42:58.20 8.17
2025-03-12T12:42:59.20 8.17
2025-03-12T12:43:00.20 8.17
2025-03-12T12:43:01.20 8.19
2025-03-12T12:43:02.20 8.17
2025-03-12T12:43:03.20 8.18
2025-03-12T12:43:04.20 8.17
2025-03-12T12:43:05.20 8.16
2025-03-12T12:43:06.20 8.17
2025-03-12T12:43:07.20 8.15
2025-03-12T12:43:08.20 8.18
2025-03-12T12:43:09.20 8.16
2025-03-12T12:43:10.20 8.17
2025-03-12T12:43:11.20 8.19
2025-03-12T12:43:12.20 8.16
2025-03-12T12:43:13.20 8.16
2025-03-12T12:43:14.20 8.16
2025-03-12T12:43:15.20 8.17
2025-03-12T12:43:16.20 8.16
2025-03-12T12:43:17.20 8.17
2025-03-12T12:43:18.20 8.17
2025-03-12T12:43:19.20 8.15
2025-03-12T12:43:20.20 8.17
2025-03-12T12:43:21.20 8.18
2025-03-12T12:43:22.20 8.17
2025-03-12T12:43:23.20 8.16
2025-03-12T12:43:24.20 8.16
2025-03-12T12:43:25.20 8.19
2025-03-12T12:43:26.20 8.17
2025-03-12T12:43:27.20 8.19
2025-03-12T12:43:28.20 8.18
2025-03-12T12:43:29.20 8.17
2025-03-12T12:43:30.20 8.17
2025-03-12T12:43:31.20 8.21
2025-03-12T12:43:32.20 8.16
2025-03-12T12:43:33.20 8.16
2025-03-12T12:43:34.20 8.18
2025-03-12T12:43:35.20 8.19
2025-03-12T12:43:36.20 8.16
2025-03-12T12:43:37.20 8.17
2025-03-12T12:43:38.20 8.15
2025-03-12T12:43:39.20 8.15
2025-03-12T12:43:40.20 8.16
2025-03-12T12:43:41.20 8.16
2025-03-12T12:43:42.20 8.17
2025-03-12T12:43:43.20 8.14
2025-03-12T12:43:44.20 8.16
2025-03-12T12:43:45.20 8.14
2025-03-12T12:43:46.20 8.18
2025-03-12T12:43:47.20 8.16
2025-03-12T12:43:48.20 8.17
2025-03-12T12:43:49.20 8.17
2025-03-12T12:43:50.20 8.16
2025-03-12T12:43:51.20 8.16
2025-03-12T12:43:52.20 8.16
2025-03-12T12:43:53.20 8.17
2025-03-12T12:43:54.20 8.19
2025-03-12T12:43:55.20 8.17
2025-03-12T12:43:56.20 8.17
2025-03-12T12:43:57.20 8.14
2025-03-12T12:43:58.20 8.16
2025-03-12T12:43:59.20 8.18
2025-03-12T12:44:00.20 8.16
2025-03-12T12:44:01.20 8.17
2025-03-12T12:44:02.20 8.19
2025-03-12T12:44:03.20 8.18
2025-03-12T12:44:04.20 8.18
2025-03-12T12:44:05.20 8.16
2025-03-12T12:44:06.20 8.16
2025-03-12T12:44:07.20 8.19
2025-03-12T12:44:08.20 8.16
2025-03-12T12:44:09.20 8.17
2025-03-12T12:44:10.20 8.16
2025-03-12T12:44:11.20 8.16
2025-03-12T12:44:12.20 8.19
2025-03-12T12:44:13.20 8.16
2025-03-12T12:44:14.20 8.17
2025-03-12T12:44:15.20 8.19
2025-03-12T12:44:16.20 8.17
2025-03-12T12:44:17.20 8.16
2025-03-12T12:44:18.20 8.17
2025-03-12T12:44:19.20 8.17
2025-03-12T12:44:20.20 8.17
2025-03-12T12:44:21.20 8.16
2025-03-12T12:44:22.20 8.19
2025-03-12T12:44:23.20 8.17
2025-03-12T12:44:24.20 8.17
2025-03-12T12:44:25.20 8.19
2025-03-12T12:44:26.20 8.16
2025-03-12T12:44:27.20 8.19
2025-03-12T12:44:28.20 8.17
2025-03-12T12:44:29.20 8.16
2025-03-12T12:44:30.20 8.16
2025-03-12T12:44:31.20 8.19
2025-03-12T12:44:32.20 8.17
2025-03-12T12:44:33.20 8.17
2025-03-12T12:44:34.20 8.16
2025-03-12T12:44:35.20 8.18
2025-03-12T12:44:36.20 8.17
2025-03-12T12:44:37.20 8.16
2025-03-12T12:44:38.20 8.18
2025-03-12T12:44:39.20 8.15
2025-03-12T12:44:40.20 8.16
2025-03-12T12:44:41.20 8.17
2025-03-12T12:44:42.20 8.19
2025-03-12T12:44:43.20 8.16
2025-03-12T12:44:44.20 8.15
2025-03-12T12:44:45.20 8.16
2025-03-12T12:44:46.20 8.18
2025-03-12T12:44:47.20 8.13
2025-03-12T12:44:48.20 8.17
2025-03-12T12:44:49.20 8.17
2025-03-12T12:44:50.20 8.17
2025-03-12T12:44:51.20 8.17
2025-03-12T12:44:52.20 8.17
2025-03-12T12:44:53.20 8.17
2025-03-12T12:44:54.20 8.16
2025-03-12T12:44:55.20 8.18
2025-03-12T12:44:56.20 8.17
2025-03-12T12:44:57.20 8.17
2025-03-12T12:44:58.20 8.17
2025-03-12T12:44:59.20 8.17
2025-03-12T12:45:00.20 8.16
2025-03-12T12:45:01.20 8.17
2025-03-12T12:45:02.20 8.15
2025-03-12T12:45:03.20 8.17
2025-03-12T12:45:04.20 8.17
2025-03-12T12:45:05.20 8.17
2025-03-12T12:45:06.20 8.16
2025-03-12T12:45:07.21 8.17
2025-03-12T12:45:08.21 8.17
2025-03-12T12:45:09.21 8.16
2025-03-12T12:45:10.21 8.18
2025-03-12T12:45:11.21 8.19
2025-03-12T12:45:12.21 8.17
2025-03-12T12:45:13.21 8.16
2025-03-12T12:45:14.21 8.18
2025-03-12T12:45:15.21 8.16
2025-03-12T12:45:16.21 8.17
2025-03-12T12:45:17.21 8.16
2025-03-12T12:45:18.21 8.18
2025-03-12T12:45:19.21 8.15
2025-03-12T12:45:20.21 8.15
2025-03-12T12:45:21.21 8.16
2025-03-12T12:45:22.21 8.14
2025-03-12T12:45:23.21 8.15
2025-03-12T12:45:24.21 8.17
2025-03-12T12:45:25.21 8.17
2025-03-12T12:45:26.21 8.17
2025-03-12T12:45:27.21 8.20
2025-03-12T12:45:28.21 8.17
2025-03-12T12:45:29.21 8.18
2025-03-12T12:45:30.21 8.16
2025-03-12T12:45:31.21 8.16
2025-03-12T12:45:32.21 8.16
2025-03-12T12:45:33.21 8.17
2025-03-12T12:45:34.21 8.16
2025-03-12T12:45:35.21 8.17
2025-03-12T12:45:36.22 8.18
2025-03-12T12:45:37.20 8.17
2025-03-12T12:45:38.20 8.17
2025-03-12T12:45:39.20 8.17
2025-03-12T12:45:40.20 8.16
2025-03-12T12:45:41.20 8.17
2025-03-12T12:45:42.20 8.17
2025-03-12T12:45:43.20 8.19
2025-03-12T12:45:44.20 8.19
2025-03-12T12:45:45.20 8.17
2025-03-12T12:45:46.20 8.16
2025-03-12T12:45:47.20 8.17
2025-03-12T12:45:48.20 8.16
2025-03-12T12:45:49.20 8.16
2025-03-12T12:45:50.20 8.17
2025-03-12T12:45:51.20 8.16
2025-03-12T12:45:52.20 8.17
2025-03-12T12:45:53.20 8.17
2025-03-12T12:45:54.20 8.18
2025-03-12T12:45:55.20 8.17
2025-03-12T12:45:56.20 8.18
2025-03-12T12:45:57.20 8.18
2025-03-12T12:45:58.20 8.16
2025-03-12T12:45:59.20 8.20
2025-03-12T12:46:00.20 8.17
2025-03-12T12:46:01.20 8.16
2025-03-12T12:46:02.20 8.16
2025-03-12T12:46:03.20 8.16
2025-03-12T12:46:04.20 8.16
2025-03-12T12:46:05.20 8.17
2025-03-12T12:46:06.20 8.18
2025-03-12T12:46:07.20 8.18
2025-03-12T12:46:08.20 8.17
2025-03-12T12:46:09.20 8.15
2025-03-12T12:46:10.20 8.18
2025-03-12T12:46:11.20 8.18
2025-03-12T12:46:12.20 8.18
2025-03-12T12:46:13.20 8.18
2025-03-12T12:46:14.20 8.19
2025-03-12T12:46:15.20 8.16
2025-03-12T12:46:16.20 8.17
2025-03-12T12:46:17.20 8.18
2025-03-12T12:46:18.20 8.17
2025-03-12T12:46:19.20 8.16
2025-03-12T12:46:20.20 8.16
2025-03-12T12:46:21.20 8.16
2025-03-12T12:46:22.20 8.16
2025-03-12T12:46:23.20 8.16
2025-03-12T12:46:24.20 8.16
2025-03-12T12:46:25.20 8.19
2025-03-12T12:46:26.20 8.17
2025-03-12T12:46:27.20 8.17
2025-03-12T12:46:28.20 8.17
2025-03-12T12:46:29.20 8.14
2025-03-12T12:46:30.20 8.18
2025-03-12T12:46:31.20 8.19
2025-03-12T12:46:32.20 8.18
2025-03-12T12:46:33.20 8.16
2025-03-12T12:46:34.20 8.16
2025-03-12T12:46:35.20 8.16
2025-03-12T12:46:36.20 8.16
2025-03-12T12:46:37.20 8.15
2025-03-12T12:46:38.20 8.17
2025-03-12T12:46:39.20 8.14
2025-03-12T12:46:40.20 8.16
2025-03-12T12:46:41.20 8.16
2025-03-12T12:46:42.20 8.17
2025-03-12T12:46:43.20 8.18
2025-03-12T12:46:44.20 8.16
2025-03-12T12:46:45.20 8.18
2025-03-12T12:46:46.20 8.19
2025-03-12T12:46:47.20 8.18
2025-03-12T12:46:48.20 8.16
2025-03-12T12:46:49.20 8.16
2025-03-12T12:46:50.20 8.16
2025-03-12T12:46:51.20 8.16
2025-03-12T12:46:52.20 8.17
2025-03-12T12:46:53.20 8.16
2025-03-12T12:46:54.20 8.15
2025-03-12T12:46:55.20 8.19
2025-03-12T12:46:56.20 8.16
2025-03-12T12:46:57.20 8.17
2025-03-12T12:46:58.20 8.17
2025-03-12T12:46:59.20 8.16
2025-03-12T12:47:00.20 8.17
2025-03-12T12:47:01.20 8.17
2025-03-12T12:47:02.20 8.19
2025-03-12T12:47:03.20 8.16
2025-03-12T12:47:04.20 8.19
2025-03-12T12:47:05.20 8.18
2025-03-12T12:47:06.20 8.16
2025-03-12T12:47:07.20 8.17
2025-03-12T12:47:08.20 8.17
2025-03-12T12:47:09.20 8.17
2025-03-12T12:47:10.20 8.17
2025-03-12T12:47:11.20 8.17
2025-03-12T12:47:12.20 8.16
2025-03-12T12:47:13.20 8.16
2025-03-12T12:47:14.20 8.19
2025-03-12T12:47:15.20 8.17
2025-03-12T12:47:16.20 8.17
2025-03-12T12:47:17.20 8.19
2025-03-12T12:47:18.20 8.17
2025-03-12T12:47:19.20 8.18
2025-03-12T12:47:20.20 8.19
2025-03-12T12:47:21.20 8.17
2025-03-12T12:47:22.20 8.18
2025-03-12T12:47:23.20 8.19
2025-03-12T12:47:24.20 8.17
2025-03-12T12:47:25.20 8.17
2025-03-12T12:47:26.20 8.16
2025-03-12T12:47:27.20 8.17
2025-03-12T12:47:28.20 8.16
2025-03-12T12:47:29.20 8.16
2025-03-12T12:47:30.20 8.17
2025-03-12T12:47:31.20 8.20
2025-03-12T12:47:32.20 8.16
2025-03-12T12:47:33.20 8.17
2025-03-12T12:47:34.20 8.17
2025-03-12T12:47:35.20 8.17
2025-03-12T12:47:36.20 8.17
2025-03-12T12:47:37.20 8.16
2025-03-12T12:47:38.20 8.19
2025-03-12T12:47:39.20 8.17
2025-03-12T12:47:40.20 8.19
2025-03-12T12:47:41.20 8.17
2025-03-12T12:47:42.20 8.14
2025-03-12T12:47:43.20 8.18
2025-03-12T12:47:44.20 8.17
2025-03-12T12:47:45.20 8.17
2025-03-12T12:47:46.20 8.19
2025-03-12T12:47:47.20 8.18
2025-03-12T12:47:48.20 8.18
2025-03-12T12:47:49.20 8.16
2025-03-12T12:47:50.20 8.16
2025-03-12T12:47:51.20 8.16
2025-03-12T12:47:52.20 8.17
2025-03-12T12:47:53.20 8.19
2025-03-12T12:47:54.20 8.17
2025-03-12T12:47:55.20 8.17
2025-03-12T12:47:56.20 8.17
2025-03-12T12:47:57.20 8.16
2025-03-12T12:47:58.20 8.17
2025-03-12T12:47:59.20 8.17
2025-03-12T12:48:00.20 8.19
2025-03-12T12:48:01.20 8.19
2025-03-12T12:48:02.20 8.15
2025-03-12T12:48:03.20 8.16
2025-03-12T12:48:04.20 8.16
2025-03-12T12:48:05.20 8.17
2025-03-12T12:48:06.20 8.17
2025-03-12T12:48:07.20 8.17
2025-03-12T12:48:08.20 8.17
2025-03-12T12:48:09.20 8.17
2025-03-12T12:48:10.20 8.17
2025-03-12T12:48:11.20 8.17
2025-03-12T12:48:12.20 8.17
2025-03-12T12:48:13.20 8.17
2025-03-12T12:48:14.20 8.17
2025-03-12T12:48:15.20 8.17
2025-03-12T12:48:16.20 8.16
2025-03-12T12:48:17.20 8.17
2025-03-12T12:48:18.20 8.17
2025-03-12T12:48:19.20 8.18
2025-03-12T12:48:20.20 8.16
2025-03-12T12:48:21.20 8.16
2025-03-12T12:48:22.20 8.18
2025-03-12T12:48:23.20 8.19
2025-03-12T12:48:24.20 8.17
2025-03-12T12:48:25.20 8.16
2025-03-12T12:48:26.20 8.16
2025-03-12T12:48:27.20 8.17
2025-03-12T12:48:28.20 8.17
2025-03-12T12:48:29.20 8.17
2025-03-12T12:48:30.20 8.19
2025-03-12T12:48:31.20 8.17
2025-03-12T12:48:32.20 8.16
2025-03-12T12:48:33.20 8.19
2025-03-12T12:48:34.20 8.17
2025-03-12T12:48:35.20 8.18
2025-03-12T12:48:36.20 8.19
2025-03-12T12:48:37.20 8.17
2025-03-12T12:48:38.20 8.18
2025-03-12T12:48:39.20 8.17
2025-03-12T12:48:40.20 8.17
2025-03-12T12:48:41.20 8.17
2025-03-12T12:48:42.20 8.16
2025-03-12T12:48:43.20 8.17
2025-03-12T12:48:44.20 8.17
2025-03-12T12:48:45.20 8.17
2025-03-12T12:48:46.20 8.19
2025-03-12T12:48:47.20 8.18
2025-03-12T12:48:48.20 8.17
2025-03-12T12:48:49.20 8.12
2025-03-12T12:48:50.20 8.18
2025-03-12T12:48:51.20 8.17
2025-03-12T12:48:52.20 8.16
2025-03-12T12:48:53.20 8.17
2025-03-12T12:48:54.20 8.14
2025-03-12T12:48:55.20 8.16
2025-03-12T12:48:56.20 8.18
2025-03-12T12:48:57.20 8.18
2025-03-12T12:48:58.20 8.16
2025-03-12T12:48:59.20 8.16
2025-03-12T12:49:00.20 8.17
2025-03-12T12:49:01.20 8.17
2025-03-12T12:49:02.20 8.18
2025-03-12T12:49:03.20 8.16
2025-03-12T12:49:04.20 8.16
2025-03-12T12:49:05.20 8.16
2025-03-12T12:49:06.20 8.19
2025-03-12T12:49:07.20 8.16
2025-03-12T12:49:08.20 8.16
2025-03-12T12:49:09.20 8.17
2025-03-12T12:49:10.20 8.17
2025-03-12T12:49:11.20 8.18
2025-03-12T12:49:12.20 8.20
2025-03-12T12:49:13.20 8.17
2025-03-12T12:49:14.20 8.17
2025-03-12T12:49:15.20 8.16
2025-03-12T12:49:16.20 8.17
2025-03-12T12:49:17.20 8.17
2025-03-12T12:49:18.20 8.17
2025-03-12T12:49:19.20 8.18
2025-03-12T12:49:20.20 8.17
2025-03-12T12:49:21.20 8.17
2025-03-12T12:49:22.20 8.16
2025-03-12T12:49:23.20 8.18
2025-03-12T12:49:24.20 8.19
2025-03-12T12:49:25.20 8.16
2025-03-12T12:49:26.20 8.18
2025-03-12T12:49:27.20 8.16
2025-03-12T12:49:28.20 8.16
2025-03-12T12:49:29.20 8.16
2025-03-12T12:49:30.20 8.18
2025-03-12T12:49:31.20 8.16
2025-03-12T12:49:32.20 8.18
2025-03-12T12:49:33.20 8.19
2025-03-12T12:49:34.20 8.17
2025-03-12T12:49:35.20 8.17
2025-03-12T12:49:36.20 8.18
2025-03-12T12:49:37.20 8.17
2025-03-12T12:49:38.20 8.17
2025-03-12T12:49:39.20 8.16
2025-03-12T12:49:40.20 8.16
2025-03-12T12:49:41.20 8.16
2025-03-12T12:49:42.20 8.17
2025-03-12T12:49:43.20 8.17
2025-03-12T12:49:44.20 8.16
2025-03-12T12:49:45.20 8.17
2025-03-12T12:49:46.20 8.17
2025-03-12T12:49:47.20 8.16
2025-03-12T12:49:48.20 8.17
2025-03-12T12:49:49.20 8.18
2025-03-12T12:49:50.20 8.18
2025-03-12T12:49:51.20 8.17
2025-03-12T12:49:52.20 8.16
2025-03-12T12:49:53.20 8.17
2025-03-12T12:49:54.20 8.18
2025-03-12T12:49:55.20 8.16
2025-03-12T12:49:56.20 8.19
2025-03-12T12:49:57.20 8.18
2025-03-12T12:49:58.20 8.18
2025-03-12T12:49:59.20 8.17
2025-03-12T12:50:00.20 8.17
2025-03-12T12:50:01.20 8.17
2025-03-12T12:50:02.20 8.19
2025-03-12T12:50:03.20 8.16
2025-03-12T12:50:04.20 8.16
2025-03-12T12:50:05.20 8.18
2025-03-12T12:50:06.20 8.16
2025-03-12T12:50:07.20 8.16
2025-03-12T12:50:08.20 8.16
2025-03-12T12:50:09.20 8.16
2025-03-12T12:50:10.20 8.16
2025-03-12T12:50:11.20 8.17
2025-03-12T12:50:12.20 8.17
2025-03-12T12:50:13.20 8.17
2025-03-12T12:50:14.20 8.18
2025-03-12T12:50:15.20 8.18
2025-03-12T12:50:16.20 8.16
2025-03-12T12:50:17.20 8.17
2025-03-12T12:50:18.20 8.21
2025-03-12T12:50:19.20 8.19
2025-03-12T12:50:20.20 8.17
2025-03-12T12:50:21.21 8.19
2025-03-12T12:50:22.20 8.17
2025-03-12T12:50:23.21 8.15
2025-03-12T12:50:24.20 8.18
2025-03-12T12:50:25.20 8.17
2025-03-12T12:50:26.21 8.19
2025-03-12T12:50:27.21 8.16
2025-03-12T12:50:28.21 8.17
2025-03-12T12:50:29.21 8.17
2025-03-12T12:50:30.21 8.17
2025-03-12T12:50:31.21 8.17
2025-03-12T12:50:32.21 8.18
2025-03-12T12:50:33.21 8.17
2025-03-12T12:50:34.21 8.16
2025-03-12T12:50:35.21 8.17
2025-03-12T12:50:36.21 8.17
2025-03-12T12:50:37.21 8.19
2025-03-12T12:50:38.21 8.16
2025-03-12T12:50:39.21 8.17
2025-03-12T12:50:40.21 8.16
2025-03-12T12:50:41.21 8.17
2025-03-12T12:50:42.21 8.17
2025-03-12T12:50:43.21 8.18
2025-03-12T12:50:44.21 8.18
2025-03-12T12:50:45.21 8.17
2025-03-12T12:50:46.21 8.17
2025-03-12T12:50:47.21 8.16
2025-03-12T12:50:48.21 8.16
2025-03-12T12:50:49.21 8.16
2025-03-12T12:50:50.21 8.16
2025-03-12T12:50:51.21 8.17
2025-03-12T12:50:52.21 8.16
2025-03-12T12:50:53.21 8.17
2025-03-12T12:50:54.21 8.15
2025-03-12T12:50:55.21 8.16
2025-03-12T12:50:56.21 8.17
2025-03-12T12:50:57.21 8.17
2025-03-12T12:50:58.21 8.16
2025-03-12T12:50:59.21 8.16
2025-03-12T12:51:00.21 8.16
2025-03-12T12:51:01.21 8.17
2025-03-12T12:51:02.21 8.16
2025-03-12T12:51:03.21 8.17
2025-03-12T12:51:04.21 8.16
2025-03-12T12:51:05.21 8.17
2025-03-12T12:51:06.21 8.19
2025-03-12T12:51:07.21 8.16
2025-03-12T12:51:08.21 8.17
2025-03-12T12:51:09.21 8.16
2025-03-12T12:51:10.21 8.16
2025-03-12T12:51:11.21 8.17
2025-03-12T12:51:12.21 8.15
2025-03-12T12:51:13.21 8.17
2025-03-12T12:51:14.21 8.17
2025-03-12T12:51:15.21 8.16
2025-03-12T12:51:16.21 8.18
2025-03-12T12:51:17.21 8.17
2025-03-12T12:51:18.21 8.17
2025-03-12T12:51:19.21 8.19
2025-03-12T12:51:20.21 8.16
2025-03-12T12:51:21.21 8.17
2025-03-12T12:51:22.21 8.18
2025-03-12T12:51:23.21 8.15
2025-03-12T12:51:24.21 8.16
2025-03-12T12:51:25.21 8.16
2025-03-12T12:51:26.21 8.18
2025-03-12T12:51:27.21 8.14
2025-03-12T12:51:28.21 8.17
2025-03-12T12:51:29.21 8.16
2025-03-12T12:51:30.21 8.19
2025-03-12T12:51:31.21 8.16
2025-03-12T12:51:32.21 8.16
2025-03-12T12:51:33.21 8.16
2025-03-12T12:51:34.21 8.19
2025-03-12T12:51:35.21 8.17
2025-03-12T12:51:36.21 8.16
2025-03-12T12:51:37.21 8.18
2025-03-12T12:51:38.21 8.18
2025-03-12T12:51:39.21 8.16
2025-03-12T12:51:40.21 8.17
2025-03-12T12:51:41.21 8.17
2025-03-12T12:51:42.21 8.15
2025-03-12T12:51:43.21 8.17
2025-03-12T12:51:44.21 8.16
2025-03-12T12:51:45.21 8.17
2025-03-12T12:51:46.21 8.18
2025-03-12T12:51:47.21 8.17
2025-03-12T12:51:48.21 8.17
2025-03-12T12:51:49.21 8.16
2025-03-12T12:51:50.21 8.16
2025-03-12T12:51:51.21 8.19
2025-03-12T12:51:52.21 8.17
2025-03-12T12:51:53.21 8.17
2025-03-12T12:51:54.21 8.17
2025-03-12T12:51:55.21 8.16
2025-03-12T12:51:56.21 8.18
2025-03-12T12:51:57.21 8.16
2025-03-12T12:51:58.21 8.18
2025-03-12T12:51:59.21 8.16
2025-03-12T12:52:00.21 8.19
2025-03-12T12:52:01.21 8.17
2025-03-12T12:52:02.21 8.16
2025-03-12T12:52:03.21 8.17
2025-03-12T12:52:04.21 8.17
2025-03-12T12:52:05.21 8.19
2025-03-12T12:52:06.21 8.17
2025-03-12T12:52:07.21 8.17
2025-03-12T12:52:08.21 8.17
2025-03-12T12:52:09.21 8.17
2025-03-12T12:52:10.21 8.16
2025-03-12T12:52:11.21 8.16
2025-03-12T12:52:12.21 8.15
2025-03-12T12:52:13.21 8.18
2025-03-12T12:52:14.21 8.16
2025-03-12T12:52:15.21 8.17
2025-03-12T12:52:16.21 8.16
2025-03-12T12:52:17.21 8.17
2025-03-12T12:52:18.21 8.19
2025-03-12T12:52:19.21 8.19
2025-03-12T12:52:20.21 8.17
2025-03-12T12:52:21.21 8.19
2025-03-12T12:52:22.21 8.17
2025-03-12T12:52:23.21 8.17
2025-03-12T12:52:24.21 8.16
2025-03-12T12:52:25.21 8.16
2025-03-12T12:52:26.21 8.17
2025-03-12T12:52:27.21 8.19
2025-03-12T12:52:28.21 8.17
2025-03-12T12:52:29.21 8.16
2025-03-12T12:52:30.21 8.16
2025-03-12T12:52:31.21 8.17
2025-03-12T12:52:32.21 8.16
2025-03-12T12:52:33.21 8.20
2025-03-12T12:52:34.21 8.19
2025-03-12T12:52:35.21 8.17
2025-03-12T12:52:36.21 8.17
2025-03-12T12:52:37.21 8.15
2025-03-12T12:52:38.21 8.17
2025-03-12T12:52:39.21 8.17
2025-03-12T12:52:40.21 8.17
2025-03-12T12:52:41.21 8.18
2025-03-12T12:52:42.21 8.16
2025-03-12T12:52:43.21 8.17
2025-03-12T12:52:44.21 8.18
2025-03-12T12:52:45.21 8.19
2025-03-12T12:52:46.21 8.16
2025-03-12T12:52:47.21 8.17
2025-03-12T12:52:48.21 8.16
2025-03-12T12:52:49.21 8.16
2025-03-12T12:52:50.21 8.15
2025-03-12T12:52:51.21 8.17
2025-03-12T12:52:52.21 8.16
2025-03-12T12:52:53.21 8.18
2025-03-12T12:52:54.21 8.19
2025-03-12T12:52:55.21 8.17
2025-03-12T12:52:56.21 8.17
2025-03-12T12:52:57.21 8.16
2025-03-12T12:52:58.21 8.16
2025-03-12T12:52:59.21 8.15
2025-03-12T12:53:00.21 8.17
2025-03-12T12:53:01.21 8.17
2025-03-12T12:53:02.21 8.18
2025-03-12T12:53:03.21 8.17
2025-03-12T12:53:04.21 8.18
2025-03-12T12:53:05.21 8.17
2025-03-12T12:53:06.21 8.16
2025-03-12T12:53:07.21 8.17
2025-03-12T12:53:08.21 8.17
2025-03-12T12:53:09.21 8.16
2025-03-12T12:53:10.21 8.16
2025-03-12T12:53:11.21 8.17
2025-03-12T12:53:12.21 8.18
2025-03-12T12:53:13.21 8.17
2025-03-12T12:53:14.21 8.17
2025-03-12T12:53:15.21 8.17
2025-03-12T12:53:16.21 8.18
2025-03-12T12:53:17.21 8.18
2025-03-12T12:53:18.21 8.18
2025-03-12T12:53:19.21 8.17
2025-03-12T12:53:20.21 8.17
2025-03-12T12:53:21.21 8.17
2025-03-12T12:53:22.21 8.17
2025-03-12T12:53:23.21 8.17
2025-03-12T12:53:24.21 8.17
2025-03-12T12:53:25.21 8.18
2025-03-12T12:53:26.21 8.17
2025-03-12T12:53:27.21 8.18
2025-03-12T12:53:28.21 8.17
2025-03-12T12:53:29.21 8.15
2025-03-12T12:53:30.21 8.16
2025-03-12T12:53:31.21 8.16
2025-03-12T12:53:32.21 8.19
2025-03-12T12:53:33.21 8.16
2025-03-12T12:53:34.21 8.17
2025-03-12T12:53:35.21 8.16
2025-03-12T12:53:36.21 8.16
2025-03-12T12:53:37.21 8.19
2025-03-12T12:53:38.21 8.18
2025-03-12T12:53:39.21 8.17
2025-03-12T12:53:40.21 8.17
2025-03-12T12:53:41.21 8.16
2025-03-12T12:53:42.21 8.17
2025-03-12T12:53:43.21 8.17
2025-03-12T12:53:44.21 8.17
2025-03-12T12:53:45.21 8.17
2025-03-12T12:53:46.21 8.17
2025-03-12T12:53:47.21 8.16
2025-03-12T12:53:48.21 8.17
2025-03-12T12:53:49.21 8.16
2025-03-12T12:53:50.21 8.18
2025-03-12T12:53:51.21 8.18
2025-03-12T12:53:52.21 8.17
2025-03-12T12:53:53.21 8.16
2025-03-12T12:53:54.21 8.15
2025-03-12T12:53:55.21 8.16
2025-03-12T12:53:56.21 8.15
2025-03-12T12:53:57.21 8.17
2025-03-12T12:53:58.21 8.17
2025-03-12T12:53:59.21 8.18
2025-03-12T12:54:00.21 8.17
2025-03-12T12:54:01.21 8.17
2025-03-12T12:54:02.21 8.16
2025-03-12T12:54:03.21 8.16
2025-03-12T12:54:04.21 8.16
2025-03-12T12:54:05.21 8.15
2025-03-12T12:54:06.21 8.16
2025-03-12T12:54:07.21 8.17
2025-03-12T12:54:08.21 8.15
2025-03-12T12:54:09.21 8.17
2025-03-12T12:54:10.21 8.18
2025-03-12T12:54:11.21 8.17
2025-03-12T12:54:12.21 8.17
2025-03-12T12:54:13.21 8.16
2025-03-12T12:54:14.21 8.17
2025-03-12T12:54:15.21 8.16
2025-03-12T12:54:16.21 8.16
2025-03-12T12:54:17.21 8.15
2025-03-12T12:54:18.21 8.16
2025-03-12T12:54:19.21 8.17
2025-03-12T12:54:20.21 8.17
2025-03-12T12:54:21.21 8.17
2025-03-12T12:54:22.21 8.17
2025-03-12T12:54:23.21 8.19
2025-03-12T12:54:24.21 8.19
2025-03-12T12:54:25.21 8.16
2025-03-12T12:54:26.21 8.15
2025-03-12T12:54:27.21 8.18
2025-03-12T12:54:28.21 8.17
2025-03-12T12:54:29.21 8.16
2025-03-12T12:54:30.21 8.17
2025-03-12T12:54:31.21 8.16
2025-03-12T12:54:32.22 8.19
2025-03-12T12:54:33.22 8.16
2025-03-12T12:54:34.22 8.17
2025-03-12T12:54:35.22 8.17
2025-03-12T12:54:36.22 8.17
2025-03-12T12:54:37.22 8.16
2025-03-12T12:54:38.22 8.16
2025-03-12T12:54:39.22 8.16
2025-03-12T12:54:40.22 8.16
2025-03-12T12:54:41.22 8.17
2025-03-12T12:54:42.22 8.16
2025-03-12T12:54:43.22 8.16
2025-03-12T12:54:44.22 8.17
2025-03-12T12:54:45.22 8.17
2025-03-12T12:54:46.22 8.16
2025-03-12T12:54:47.22 8.16
2025-03-12T12:54:48.22 8.16
2025-03-12T12:54:49.22 8.16
2025-03-12T12:54:50.22 8.17
2025-03-12T12:54:51.22 8.17
2025-03-12T12:54:52.22 8.16
2025-03-12T12:54:53.22 8.17
2025-03-12T12:54:54.22 8.17
2025-03-12T12:54:55.22 8.16
2025-03-12T12:54:56.22 8.17
2025-03-12T12:54:57.22 8.16
2025-03-12T12:54:58.22 8.17
2025-03-12T12:54:59.22 8.17
2025-03-12T12:55:00.22 8.17
2025-03-12T12:55:01.22 8.17
2025-03-12T12:55:02.22 8.16
2025-03-12T12:55:03.22 8.17
2025-03-12T12:55:04.22 8.16
2025-03-12T12:55:05.22 8.17
2025-03-12T12:55:06.22 8.14
2025-03-12T12:55:07.22 8.16
2025-03-12T12:55:08.22 8.17
2025-03-12T12:55:09.22 8.17
2025-03-12T12:55:10.22 8.19
2025-03-12T12:55:11.22 8.16
2025-03-12T12:55:12.22 8.17
2025-03-12T12:55:13.22 8.15
2025-03-12T12:55:14.22 8.15
2025-03-12T12:55:15.22 8.18
2025-03-12T12:55:16.22 8.16
2025-03-12T12:55:17.22 8.14
2025-03-12T12:55:18.22 8.16
2025-03-12T12:55:19.22 8.17
2025-03-12T12:55:20.22 8.18
2025-03-12T12:55:21.22 8.17
2025-03-12T12:55:22.22 8.19
2025-03-12T12:55:23.22 8.17
2025-03-12T12:55:24.22 8.17
2025-03-12T12:55:25.22 8.16
2025-03-12T12:55:26.22 8.17
2025-03-12T12:55:27.22 8.19
2025-03-12T12:55:28.22 8.16
2025-03-12T12:55:29.22 8.17
2025-03-12T12:55:30.22 8.14
2025-03-12T12:55:31.22 8.16
2025-03-12T12:55:32.23 8.18
2025-03-12T12:55:33.24 8.18
2025-03-12T12:55:34.23 8.18
2025-03-12T12:55:35.23 8.16
2025-03-12T12:55:36.23 8.16
2025-03-12T12:55:37.23 8.17
2025-03-12T12:55:38.23 8.15
2025-03-12T12:55:39.23 8.18
2025-03-12T12:55:40.23 8.17
2025-03-12T12:55:41.23 8.17
2025-03-12T12:55:42.23 8.16
2025-03-12T12:55:43.23 8.15
2025-03-12T12:55:44.24 8.18
2025-03-12T12:55:45.24 8.16
2025-03-12T12:55:46.24 8.17
2025-03-12T12:55:47.24 8.17
2025-03-12T12:55:48.24 8.16
2025-03-12T12:55:49.24 8.14
2025-03-12T12:55:50.24 8.17
2025-03-12T12:55:51.24 8.16
2025-03-12T12:55:52.24 8.18
2025-03-12T12:55:53.24 8.18
2025-03-12T12:55:54.24 8.16
2025-03-12T12:55:55.24 8.19
2025-03-12T12:55:56.24 8.18
2025-03-12T12:55:57.24 8.17
2025-03-12T12:55:58.24 8.16
2025-03-12T12:55:59.24 8.14
2025-03-12T12:56:00.24 8.16
2025-03-12T12:56:01.24 8.17
2025-03-12T12:56:02.24 8.17
2025-03-12T12:56:03.24 8.17
2025-03-12T12:56:04.24 8.19
2025-03-12T12:56:05.24 8.19
2025-03-12T12:56:06.24 8.16
2025-03-12T12:56:07.24 8.16
2025-03-12T12:56:08.24 8.17
2025-03-12T12:56:09.24 8.17
2025-03-12T12:56:10.24 8.17
2025-03-12T12:56:11.24 8.19
2025-03-12T12:56:12.24 8.16
2025-03-12T12:56:13.24 8.15
2025-03-12T12:56:14.24 8.16
2025-03-12T12:56:15.24 8.19
2025-03-12T12:56:16.24 8.16
2025-03-12T12:56:17.24 8.16
2025-03-12T12:56:18.24 8.17
2025-03-12T12:56:19.24 8.17
2025-03-12T12:56:20.24 8.15
2025-03-12T12:56:21.24 8.18
2025-03-12T12:56:22.24 8.17
2025-03-12T12:56:23.24 8.17
2025-03-12T12:56:24.24 8.17
2025-03-12T12:56:25.24 8.15
2025-03-12T12:56:26.24 8.16
2025-03-12T12:56:27.24 8.17
2025-03-12T12:56:28.24 8.18
2025-03-12T12:56:29.24 8.17
2025-03-12T12:56:30.24 8.18
2025-03-12T12:56:31.24 8.15
2025-03-12T12:56:32.24 8.17
2025-03-12T12:56:33.24 8.17
2025-03-12T12:56:34.24 8.16
2025-03-12T12:56:35.24 8.16
2025-03-12T12:56:36.24 8.16
2025-03-12T12:56:37.24 8.16
2025-03-12T12:56:38.24 8.17
2025-03-12T12:56:39.24 8.17
2025-03-12T12:56:40.24 8.18
2025-03-12T12:56:41.24 8.17
2025-03-12T12:56:42.24 8.17
2025-03-12T12:56:43.24 8.17
2025-03-12T12:56:44.24 8.16
2025-03-12T12:56:45.24 8.16
2025-03-12T12:56:46.24 8.16
2025-03-12T12:56:47.24 8.14
2025-03-12T12:56:48.24 8.17
2025-03-12T12:56:49.24 8.16
2025-03-12T12:56:50.24 8.19
2025-03-12T12:56:51.24 8.16
2025-03-12T12:56:52.24 8.17
2025-03-12T12:56:53.24 8.17
2025-03-12T12:56:54.24 8.17
2025-03-12T12:56:55.24 8.17
2025-03-12T12:56:56.24 8.16
2025-03-12T12:56:57.24 8.16
2025-03-12T12:56:58.24 8.18
2025-03-12T12:56:59.24 8.16
2025-03-12T12:57:00.24 8.16
2025-03-12T12:57:01.24 8.17
2025-03-12T12:57:02.24 8.17
2025-03-12T12:57:03.24 8.19
2025-03-12T12:57:04.24 8.17
2025-03-12T12:57:05.24 8.16
2025-03-12T12:57:06.24 8.19
2025-03-12T12:57:07.24 8.17
2025-03-12T12:57:08.24 8.16
2025-03-12T12:57:09.24 8.14
2025-03-12T12:57:10.24 8.16
2025-03-12T12:57:11.24 8.19
2025-03-12T12:57:12.24 8.16
2025-03-12T12:57:13.24 8.16
2025-03-12T12:57:14.24 8.17
2025-03-12T12:57:15.24 8.16
2025-03-12T12:57:16.24 8.16
2025-03-12T12:57:17.24 8.16
2025-03-12T12:57:18.24 8.15
2025-03-12T12:57:19.24 8.18
2025-03-12T12:57:20.24 8.16
2025-03-12T12:57:21.24 8.19
2025-03-12T12:57:22.24 8.17
2025-03-12T12:57:23.24 8.17
2025-03-12T12:57:24.24 8.16
2025-03-12T12:57:25.24 8.17
2025-03-12T12:57:26.24 8.17
2025-03-12T12:57:27.24 8.17
2025-03-12T12:57:28.24 8.16
2025-03-12T12:57:29.24 8.19
2025-03-12T12:57:30.24 8.17
2025-03-12T12:57:31.24 8.17
2025-03-12T12:57:32.24 8.17
2025-03-12T12:57:33.24 8.17
2025-03-12T12:57:34.24 8.18
2025-03-12T12:57:35.24 8.15
2025-03-12T12:57:36.24 8.19
2025-03-12T12:57:37.24 8.16
2025-03-12T12:57:38.24 8.16
2025-03-12T12:57:39.24 8.16
2025-03-12T12:57:40.24 8.17
2025-03-12T12:57:41.24 8.17
2025-03-12T12:57:42.24 8.19
2025-03-12T12:57:43.24 8.16
2025-03-12T12:57:44.24 8.16
2025-03-12T12:57:45.24 8.14
2025-03-12T12:57:46.24 8.15
2025-03-12T12:57:47.24 8.17
2025-03-12T12:57:48.24 8.17
2025-03-12T12:57:49.24 8.17
2025-03-12T12:57:50.24 8.19
2025-03-12T12:57:51.24 8.16
2025-03-12T12:57:52.24 8.17
2025-03-12T12:57:53.24 8.16
2025-03-12T12:57:54.24 8.17
2025-03-12T12:57:55.24 8.16
2025-03-12T12:57:56.24 8.18
2025-03-12T12:57:57.24 8.17
2025-03-12T12:57:58.24 8.17
2025-03-12T12:57:59.24 8.16
2025-03-12T12:58:00.24 8.18
2025-03-12T12:58:01.24 8.18
2025-03-12T12:58:02.24 8.17
2025-03-12T12:58:03.24 8.18
2025-03-12T12:58:04.24 8.19
2025-03-12T12:58:05.24 8.19
2025-03-12T12:58:06.24 8.16
2025-03-12T12:58:07.24 8.17
2025-03-12T12:58:08.24 8.17
2025-03-12T12:58:09.24 8.18
2025-03-12T12:58:10.24 8.17
2025-03-12T12:58:11.24 8.19
2025-03-12T12:58:12.24 8.18
2025-03-12T12:58:13.24 8.17
2025-03-12T12:58:14.24 8.19
2025-03-12T12:58:15.24 8.19
2025-03-12T12:58:16.24 8.15
2025-03-12T12:58:17.24 8.16
2025-03-12T12:58:18.24 8.18
2025-03-12T12:58:19.24 8.15
2025-03-12T12:58:20.24 8.15
2025-03-12T12:58:21.24 8.17
2025-03-12T12:58:22.24 8.18
2025-03-12T12:58:23.24 8.19
2025-03-12T12:58:24.24 8.17
2025-03-12T12:58:25.24 8.17
2025-03-12T12:58:26.24 8.16
2025-03-12T12:58:27.24 8.18
2025-03-12T12:58:28.24 8.17
2025-03-12T12:58:29.24 8.17
2025-03-12T12:58:30.24 8.16
2025-03-12T12:58:31.24 8.16
2025-03-12T12:58:32.24 8.16
2025-03-12T12:58:33.24 8.19
2025-03-12T12:58:34.24 8.17
2025-03-12T12:58:35.24 8.19
2025-03-12T12:58:36.24 8.19
2025-03-12T12:58:37.24 8.17
2025-03-12T12:58:38.24 8.16
2025-03-12T12:58:39.24 8.18
2025-03-12T12:58:40.24 8.16
2025-03-12T12:58:41.24 8.17
2025-03-12T12:58:42.24 8.16
2025-03-12T12:58:43.24 8.14
2025-03-12T12:58:44.24 8.19
2025-03-12T12:58:45.24 8.15
2025-03-12T12:58:46.24 8.17
2025-03-12T12:58:47.24 8.16
2025-03-12T12:58:48.24 8.16
2025-03-12T12:58:49.24 8.17
2025-03-12T12:58:50.24 8.18
2025-03-12T12:58:51.24 8.16
2025-03-12T12:58:52.24 8.17
2025-03-12T12:58:53.24 8.17
2025-03-12T12:58:54.24 8.18
2025-03-12T12:58:55.24 8.17
2025-03-12T12:58:56.24 8.17
2025-03-12T12:58:57.24 8.17
2025-03-12T12:58:58.24 8.17
2025-03-12T12:58:59.24 8.17
2025-03-12T12:59:00.24 8.17
2025-03-12T12:59:01.24 8.17
2025-03-12T12:59:02.24 8.18
2025-03-12T12:59:03.24 8.19
2025-03-12T12:59:04.24 8.18
2025-03-12T12:59:05.24 8.16
2025-03-12T12:59:06.24 8.17
2025-03-12T12:59:07.24 8.15
2025-03-12T12:59:08.24 8.16
2025-03-12T12:59:09.24 8.14
2025-03-12T12:59:10.24 8.20
2025-03-12T12:59:11.24 8.16
2025-03-12T12:59:12.24 8.17
2025-03-12T12:59:13.24 8.17
2025-03-12T12:59:14.24 8.19
2025-03-12T12:59:15.24 8.15
2025-03-12T12:59:16.24 8.16
2025-03-12T12:59:17.24 8.19
2025-03-12T12:59:18.24 8.18
2025-03-12T12:59:19.24 8.17
2025-03-12T12:59:20.24 8.18
2025-03-12T12:59:21.24 8.16
2025-03-12T12:59:22.24 8.15
2025-03-12T12:59:23.24 8.16
2025-03-12T12:59:24.24 8.18
2025-03-12T12:59:25.24 8.17
2025-03-12T12:59:26.24 8.18
2025-03-12T12:59:27.24 8.17
2025-03-12T12:59:28.24 8.17
2025-03-12T12:59:29.24 8.17
2025-03-12T12:59:30.24 8.20
2025-03-12T12:59:31.24 8.19
2025-03-12T12:59:32.24 8.16
2025-03-12T12:59:33.24 8.16
2025-03-12T12:59:34.24 8.18
2025-03-12T12:59:35.24 8.17
2025-03-12T12:59:36.24 8.18
2025-03-12T12:59:37.24 8.17
2025-03-12T12:59:38.24 8.17
2025-03-12T12:59:39.24 8.17
2025-03-12T12:59:40.24 8.18
2025-03-12T12:59:41.24 8.17
2025-03-12T12:59:42.24 8.17
2025-03-12T12:59:43.24 8.15
2025-03-12T12:59:44.24 8.14
2025-03-12T12:59:45.24 8.14
2025-03-12T12:59:46.24 8.16
2025-03-12T12:59:47.24 8.16
2025-03-12T12:59:48.24 8.17
2025-03-12T12:59:49.24 8.18
2025-03-12T12:59:50.24 8.16
2025-03-12T12:59:51.24 8.16
2025-03-12T12:59:52.24 8.17
2025-03-12T12:59:53.24 8.17
2025-03-12T12:59:54.24 8.16
2025-03-12T12:59:55.24 8.19
2025-03-12T12:59:56.24 8.17
2025-03-12T12:59:57.24 8.16
2025-03-12T12:59:58.24 8.19
2025-03-12T12:59:59.24 8.17
